Discussion and Consideration of Change Order #2 – Tricon Construction – Tiffin Water Treatment Facility Upgrade Project – Motion to Approve — K.4
Page 1 of 63
Text from the PDF text layer; check the PDF for anything that matters. AGENDA ITEM # K-4
AGENDA INFORMATION
TIFFIN CITY COUNCIL COMMUNICATION
DATE: April 2, 2026
AGENDA ITEM: Discussion and Consideration Change Order #2 – Tricon Construction –
Tiffin Water Treatment Facility Upgrade Project
ACTION: Motion
Background
The City of Tiffin is currently completing improvements to the Water Treatment Facility as part
of ongoing infrastructure upgrades.
Change Order No. 2 reflects a series of adjustments to the project scope based on field
conditions, design clarifications, and coordination with utility providers and operational needs.
The change order was issued April 1, 2026, with an effective date of April 7, 2026.
This change order includes both increases and decreases to the contract based on necessary
project modifications, including:
• Addition of a new water service line in the chemical room
• Installation of bollards and a concrete pad at the relocated transformer for protection
• Addition of concrete curbs for chemical containment areas
• Modifications to an existing masonry wall to support structural loading requirements
• Adjustments to valve configurations in piping systems
• Addition of ductwork intake in the MCC room
• Credit for low lift pumps that did not meet specified efficiency
These items are largely driven by field coordination, safety considerations, and ensuring the
facility meets operational and regulatory requirements.
Staff Recommendation
Staff recommends approval of Change Order No. 2 for the Tiffin Water Treatment Facility
Upgrade project in the amount of $7,728.57, as submitted by Tricon Construction Group.
ATTACHMENTS: Change Order
1
Sources
- revize: K.4 (ilsOpCSGLeJgWrIuB4PqcWDz92CA6Y.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-4 Discussion and Consideration of Change Order #2 – Tricon Construction – Tiffin Water...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.