staff report memo · L-3

Tiffin Recreation Center Monthly Report — L.3

Open the PDF

Page 12 of 18

Text from the PDF text layer; check the PDF for anything that matters.
Progress Photos 2nd Floor stud installation 2nd Floor in wall rough-ins and blocking Locker room stud wall installation Locker room above ceiling MEP installation Locker room drywall installation Mechanical room drywall installation Owner Progress Report | 250120 April 2026 Miron Construction Co., Inc. | 12

Sources

Attached to agenda item: L-3 Tiffin Recreation Center Monthly Report

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.