Tiffin Recreation Center Monthly Report — L.3
Page 13 of 18
Text from the PDF text layer; check the PDF for anything that matters.Progress Photos
Mechanical room drywall installation Top track installation on North side
Gym floor poured and being finished Ductwork & Fire Protection installation
on North side
Track for divider curtain installed Ductwork being installed in lobby
ceiling
Owner Progress Report | 250120 April 2026 Miron Construction Co., Inc. | 13