minutes
Minutes-9/1/2016
Dated September 1, 2016City Council — regular meeting, September 1, 2016 86 pages
Ord. 2016-391, Ord. 2014-363, Ord. 2016-392, Ord. 2016-390, Ord. 2016, Res. 2016-063, Res. 2016-064, Res. 2016-065, Res. 2016-062, Res. 2016-042
Page 48 of 86
Text read by the vision model; check the PDF for anything that matters.<table>
<tr>
<th>ITEM NO.</th>
<th>CONTRACT ITEMS</th>
<th>UNIT</th>
<th>EST QTY</th>
<th>UNIT PRICE</th>
<th>CONTRACTOR'S BID PRICE</th>
<th colspan="2">Pay Period #11</th>
<th colspan="2">TOTAL TO DATE</th>
</tr>
<tr>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th></th>
<th>QTY</th>
<th>AMOUNT</th>
<th>QTY</th>
<th>AMOUNT</th>
</tr>
<tr>
<td>1</td>
<td>Spot Repairs by Count</td>
<td>EACH</td>
<td>89</td>
<td>$1,050.00</td>
<td>$93,450.00</td>
<td></td>
<td></td>
<td>105.00</td>
<td>$110,250.00</td>
</tr>
<tr>
<td>2*</td>
<td>Spot Repairs by Linear Foot</td>
<td>LF</td>
<td>200</td>
<td>$39.00</td>
<td>$7,800.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>3*</td>
<td>Sanitary Sewer Wye or Tee 8"x6" DIA.</td>
<td>EACH</td>
<td>88</td>
<td>$340.00</td>
<td>$29,920.00</td>
<td></td>
<td></td>
<td>85.00</td>
<td>$28,900.00</td>
</tr>
<tr>
<td>4</td>
<td>Sanitary Sewer Service Stub 4" SDR 23.5</td>
<td>LF</td>
<td>5200</td>
<td>$17.65</td>
<td>$91,780.00</td>
<td></td>
<td></td>
<td>3,521.50</td>
<td>$62,154.48</td>
</tr>
<tr>
<td>5</td>
<td>Sanitary Sewer Service Stub 6" SDR 23.5</td>
<td>LF</td>
<td>560</td>
<td>$20.50</td>
<td>$11,480.00</td>
<td></td>
<td></td>
<td>226.00</td>
<td>$4,633.00</td>
</tr>
<tr>
<td>6</td>
<td>Sanitary Sewer Cleanout</td>
<td>EACH</td>
<td>12</td>
<td>$585.00</td>
<td>$7,020.00</td>
<td></td>
<td></td>
<td>8.00</td>
<td>$4,680.00</td>
</tr>
<tr>
<td>7</td>
<td>Patches by Count</td>
<td>EACH</td>
<td>77</td>
<td>$42.50</td>
<td>$3,272.50</td>
<td></td>
<td></td>
<td>88.00</td>
<td>$3,740.00</td>
</tr>
<tr>
<td>8</td>
<td>Patches, Full Depth, HMA</td>
<td>SY</td>
<td>1200</td>
<td>$62.50</td>
<td>$75,000.00</td>
<td></td>
<td></td>
<td>1,046.33</td>
<td>$65,395.63</td>
</tr>
<tr>
<td>9</td>
<td>Subbase Patches</td>
<td>SY</td>
<td>1200</td>
<td>$27.00</td>
<td>$32,400.00</td>
<td></td>
<td></td>
<td>659.33</td>
<td>$17,801.91</td>
</tr>
<tr>
<td>10</td>
<td>Removal of Sidewalk</td>
<td>SY</td>
<td>293</td>
<td>$7.00</td>
<td>$2,051.00</td>
<td></td>
<td></td>
<td>301.07</td>
<td>$2,107.49</td>
</tr>
<tr>
<td>11</td>
<td>Sidewalk, PCC, 4-inch</td>
<td>SY</td>
<td>310</td>
<td>$63.50</td>
<td>$19,685.00</td>
<td></td>
<td></td>
<td>282.17</td>
<td>$17,917.80</td>
</tr>
<tr>
<td>12</td>
<td>Sidewalk, PCC, 6-inch</td>
<td>SY</td>
<td>15</td>
<td>$73.00</td>
<td>$1,095.00</td>
<td></td>
<td></td>
<td>17.90</td>
<td>$1,306.70</td>
</tr>
<tr>
<td>13</td>
<td>Detectable Warning Panel</td>
<td>SF</td>
<td>16</td>
<td>$71.00</td>
<td>$1,136.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>14</td>
<td>Removal of Paved Driveway</td>
<td>SY</td>
<td>70</td>
<td>$7.50</td>
<td>$525.00</td>
<td></td>
<td></td>
<td>18.00</td>
<td>$135.00</td>
</tr>
<tr>
<td>15</td>
<td>Driveway, HMA, 5-inch</td>
<td>SY</td>
<td>75</td>
<td>$85.00</td>
<td>$6,375.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>16</td>
<td>Driveway, PCC, 6-inch</td>
<td>SY</td>
<td>70</td>
<td>$152.00</td>
<td>$10,640.00</td>
<td></td>
<td></td>
<td>24.65</td>
<td>$3,746.80</td>
</tr>
<tr>
<td>17</td>
<td>Driveway, Granular Surface</td>
<td>SY</td>
<td>275</td>
<td>$11.00</td>
<td>$3,025.00</td>
<td></td>
<td></td>
<td>2.26</td>
<td>$24.86</td>
</tr>
<tr>
<td>18</td>
<td>Sewer Main Cleaning, Light/Preparatory</td>
<td>LF</td>
<td>409</td>
<td>$2.00</td>
<td>$818.00</td>
<td>10.80</td>
<td>$21.60</td>
<td>411.80</td>
<td>$823.60</td>
</tr>
<tr>
<td>19</td>
<td>Sewer Main Cleaning, Heavy/Root Sawing</td>
<td>LF</td>
<td>409</td>
<td>$1.00</td>
<td>$409.00</td>
<td>12.20</td>
<td>$12.20</td>
<td>253.20</td>
<td>$253.20</td>
</tr>
<tr>
<td>20*</td>
<td>Color Television Inspection of Sewer, Preparatory and Report</td>
<td>LF</td>
<td>490</td>
<td>$0.50</td>
<td>$245.00</td>
<td>11.80</td>
<td>$5.90</td>
<td>412.80</td>
<td>$206.40</td>
</tr>
<tr>
<td>21</td>
<td>Color Television Inspection of Sewer, Final and Report</td>
<td>LF</td>
<td>409</td>
<td>$0.50</td>
<td>$204.50</td>
<td>1.00</td>
<td>$0.50</td>
<td>1.00</td>
<td>$0.50</td>
</tr>
<tr>
<td>22</td>
<td>Cut Protruding Taps</td>
<td>EACH</td>
<td>2</td>
<td>$250.00</td>
<td>$500.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>23</td>
<td>8" Cured In Place Pipe Lining</td>
<td>LF</td>
<td>409</td>
<td>$25.00</td>
<td>$10,225.00</td>
<td></td>
<td></td>
<td>160.00</td>
<td>$4,000.00</td>
</tr>
<tr>
<td>24</td>
<td>Lateral Service Line Reinstatement</td>
<td>EACH</td>
<td>3</td>
<td>$100.00</td>
<td>$300.00</td>
<td></td>
<td></td>
<td>3.00</td>
<td>$300.00</td>
</tr>
<tr>
<td>25</td>
<td>Manhole Lining (Cementitious Mortar with Epoxy Seal)</td>
<td>VF</td>
<td>215</td>
<td>$270.00</td>
<td>$58,050.00</td>
<td>133.83</td>
<td>$36,134.10</td>
<td>133.83</td>
<td>$36,134.10</td>
</tr>
<tr>
<td>26</td>
<td>Traffic Control</td>
<td>LS</td>
<td>1</td>
<td>$3,400.00</td>
<td>$3,400.00</td>
<td></td>
<td></td>
<td>1.00</td>
<td>$3,400.00</td>
</tr>
<tr>
<td>27</td>
<td>Mobilization</td>
<td>LS</td>
<td>1</td>
<td>$6,850.00</td>
<td>$6,850.00</td>
<td></td>
<td></td>
<td>1.00</td>
<td>$6,850.00</td>
</tr>
<tr>
<td>28</td>
<td>Seeding, Fertilizing, Mulching, Urban mix</td>
<td>ACRE</td>
<td>0.9</td>
<td>$3,850.00</td>
<td>$3,465.00</td>
<td>0.25</td>
<td>$962.50</td>
<td>1.00</td>
<td>$3,830.00</td>
</tr>
<tr>
<td>29</td>
<td>Exploratory Excavation, Service location</td>
<td>EACH</td>
<td>5</td>
<td>$1,200.00</td>
<td>$6,000.00</td>
<td></td>
<td></td>
<td>6.00</td>
<td>$7,200.00</td>
</tr>
</table>
* Contingency item for bidding purposes only.
TOTAL OF THE BASE BID (Total of Items 1-29): $487,121.00 $ 37,136.80 $ 385,811.47
<table>
<tr>
<th>CO1</th>
<td>Place concrete around Wye's if Wye's do not need to be replaced.</td>
<td>21.00</td>
<td>$ (340.00)</td>
<td>(57,140.00)</td>
<td></td>
<td>46.00</td>
<td>$ (15,640.00)</td>
</tr>
<tr>
<td></td>
<td></td>
<td>21.00</td>
<td>$ 170.00</td>
<td>$3,570.00</td>
<td></td>
<td>46.00</td>
<td>$ 7,820.00</td>
</tr>
<tr>
<td>CO2</td>
<td>6" Cured In Place Pipe Lining</td>
<td>LF</td>
<td>241.00</td>
<td>$ 31.00</td>
<td>$7,471.00</td>
<td>12.20</td>
<td>$378.20</td>
<td>253.20</td>
<td>$7,849.20</td>
</tr>
<tr>
<td>CO3</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>$0.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>CO4</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>$0.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>CO5</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>$0.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>CO6</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>$0.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<th colspan="8">CHANGE ORDER SUB-TOTAL</th>
<th>$ 378.20</th>
<th>$ 29.20</th>
</tr>
</table>
AMOUNT EARNED TOTAL $37,515.00 $ 385,840.67
<table>
<tr>
<th>9998</th>
<td>Materials Stored on-site</td>
<td></td>
<td>$ -</td>
<td>$ -</td>
</tr>
<tr>
<th>9999</th>
<td>Materials Installed on-site (Deduct)</td>
<td></td>
<td>$ -</td>
<td>$ -</td>
</tr>
<tr>
<th colspan="2">MATERIALS SUB-TOTAL</th>
<td></td>
<td>$ -</td>
<td>$ -</td>
</tr>
<tr>
<th colspan="2">TOTAL</th>
<td></td>
<td>$ 37,515.00</td>
<td>$ 385,840.67</td>
</tr>
</table>
Sources
- laserfiche: Minutes-9/1/2016 (Minutes-9-1-2016.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.