minutes
Minutes-9/1/2016
Dated September 1, 2016City Council — regular meeting, September 1, 2016 86 pages
Ord. 2016-391, Ord. 2014-363, Ord. 2016-392, Ord. 2016-390, Ord. 2016, Res. 2016-063, Res. 2016-064, Res. 2016-065, Res. 2016-062, Res. 2016-042
Page 47 of 86
Text read by the vision model; check the PDF for anything that matters.From Sulz Co.
<table>
<tr>
<th>ITEM NO.</th>
<th>CONTRACT ITEMS</th>
<th>UNIT</th>
<th>EST QTY</th>
<th>UNIT PRICE</th>
<th>CONTRACTOR's BID PRICE</th>
<th>QTY</th>
<th>Pay Period #11 AMOUNT</th>
<th>TOTAL TO DATE QTY</th>
<th>TOTAL TO DATE AMOUNT</th>
</tr>
<tr>
<td>1</td>
<td>Spot Repairs by Count</td>
<td>EACH</td>
<td>89</td>
<td>$1,050.00</td>
<td>$93,450.00</td>
<td>$</td>
<td>$ - 105.00</td>
<td>$ 110,250.00</td>
</tr>
<tr>
<td>2*</td>
<td>Spot Repairs by Linear Foot</td>
<td>LF</td>
<td>200</td>
<td>$39.00</td>
<td>$7,800.00</td>
<td>$</td>
<td>$ -</td>
<td>$ -</td>
</tr>
<tr>
<td>3*</td>
<td>Sanitary Sewer Wye or Tee 8"x6" DIA.</td>
<td>EACH</td>
<td>88</td>
<td>$340.00</td>
<td>$29,920.00</td>
<td>$</td>
<td>$ - 85.00</td>
<td>$ 28,900.00</td>
</tr>
<tr>
<td>4</td>
<td>Sanitary Sewer Service Stub 4" SDR 23.5</td>
<td>LF</td>
<td>5200</td>
<td>$17.65</td>
<td>$91,780.00</td>
<td>$</td>
<td>$ - 3,521.50</td>
<td>$ 62,154.48</td>
</tr>
<tr>
<td>5</td>
<td>Sanitary Sewer Service Stub 6" SDR 23.5</td>
<td>LF</td>
<td>560</td>
<td>$20.50</td>
<td>$11,480.00</td>
<td>$</td>
<td>$ - 226.00</td>
<td>$ 4,633.00</td>
</tr>
<tr>
<td>6</td>
<td>Sanitary Sewer Cleanout</td>
<td>EACH</td>
<td>12</td>
<td>$585.00</td>
<td>$7,020.00</td>
<td>$</td>
<td>$ - 8.00</td>
<td>$ 4,680.00</td>
</tr>
<tr>
<td>7</td>
<td>Patches by Count</td>
<td>EACH</td>
<td>77</td>
<td>$42.50</td>
<td>$3,272.50</td>
<td>$</td>
<td>$ - 88.00</td>
<td>$ 3,740.00</td>
</tr>
<tr>
<td>8</td>
<td>Patches, Full-Depth, HMA</td>
<td>SY</td>
<td>1200</td>
<td>$62.50</td>
<td>$75,000.00</td>
<td>$</td>
<td>$ - 1,046.33</td>
<td>$ 65,395.63</td>
</tr>
<tr>
<td>9</td>
<td>Subbase Patches</td>
<td>SY</td>
<td>1200</td>
<td>$27.00</td>
<td>$32,400.00</td>
<td>$</td>
<td>$ - 659.33</td>
<td>$ 17,801.91</td>
</tr>
<tr>
<td>10</td>
<td>Removal of Sidewalk</td>
<td>SY</td>
<td>293</td>
<td>$7.00</td>
<td>$2,051.00</td>
<td>$</td>
<td>$ - 301.07</td>
<td>$ 2,107.49</td>
</tr>
<tr>
<td>11</td>
<td>Sidewalk, PCC, 4-inch</td>
<td>SY</td>
<td>310</td>
<td>$63.50</td>
<td>$19,685.00</td>
<td>$</td>
<td>$ - 282.17</td>
<td>$ 17,917.80</td>
</tr>
<tr>
<td>12</td>
<td>Sidewalk, PCC, 6-inch</td>
<td>SY</td>
<td>15</td>
<td>$73.00</td>
<td>$1,095.00</td>
<td>$</td>
<td>$ - 17.90</td>
<td>$ 1,306.70</td>
</tr>
<tr>
<td>13</td>
<td>Detectable Warning Panel</td>
<td>SF</td>
<td>16</td>
<td>$71.00</td>
<td>$1,136.00</td>
<td>$</td>
<td>$ -</td>
<td>$ -</td>
</tr>
<tr>
<td>14</td>
<td>Removal of Paved Driveway</td>
<td>SY</td>
<td>70</td>
<td>$7.50</td>
<td>$525.00</td>
<td>$</td>
<td>$ - 18.00</td>
<td>$ 135.00</td>
</tr>
<tr>
<td>15</td>
<td>Driveway, HMA, 5-inch</td>
<td>SY</td>
<td>75</td>
<td>$85.00</td>
<td>$6,375.00</td>
<td>$</td>
<td>$ -</td>
<td>$ -</td>
</tr>
<tr>
<td>16</td>
<td>Driveway, PCC, 6-inch</td>
<td>SY</td>
<td>70</td>
<td>$152.00</td>
<td>$10,640.00</td>
<td>$</td>
<td>$ - 24.65</td>
<td>$ 3,746.80</td>
</tr>
<tr>
<td>17</td>
<td>Driveway, Granular Surface</td>
<td>SY</td>
<td>275</td>
<td>$11.00</td>
<td>$3,025.00</td>
<td>$</td>
<td>$ - 2.26</td>
<td>$ 24.86</td>
</tr>
<tr>
<td>18</td>
<td>Sewer Main Cleaning, Light/Preparatory</td>
<td>LF</td>
<td>409</td>
<td>$2.00</td>
<td>$818.00</td>
<td>10.80</td>
<td>$ 21.60</td>
<td>$ 411.80</td>
<td>$ 823.60</td>
</tr>
<tr>
<td>19</td>
<td>Sewer Main Cleaning, Heavy/Root Sawing</td>
<td>LF</td>
<td>409</td>
<td>$1.00</td>
<td>$409.00</td>
<td>12.20</td>
<td>$ 12.20</td>
<td>$ 253.20</td>
<td>$ 253.20</td>
</tr>
<tr>
<td>20*</td>
<td>Color Television Inspection of Sewer, Preparatory and Report</td>
<td>LF</td>
<td>490</td>
<td>$0.50</td>
<td>$245.00</td>
<td>11.80</td>
<td>$ 5.90</td>
<td>$ 412.80</td>
<td>$ 206.40</td>
</tr>
<tr>
<td>21</td>
<td>Color Television Inspection of Sewer, Final and Report</td>
<td>LF</td>
<td>409</td>
<td>$0.50</td>
<td>$204.50</td>
<td>1.00</td>
<td>$ 0.50</td>
<td>$ 1.00</td>
<td>$ 0.50</td>
</tr>
<tr>
<td>22</td>
<td>Cut Protruding Taps</td>
<td>EACH</td>
<td>2</td>
<td>$250.00</td>
<td>$500.00</td>
<td>$</td>
<td>$ -</td>
<td>$ -</td>
<td>$ -</td>
</tr>
<tr>
<td>23*</td>
<td>8" Cured In Place Pipe Lining</td>
<td>LF</td>
<td>168</td>
<td>$25.00</td>
<td>$4,200.00</td>
<td>$</td>
<td>$ - 160.00</td>
<td>$ 4,000.00</td>
</tr>
<tr>
<td>24</td>
<td>Lateral Service Line Reinstatement</td>
<td>EACH</td>
<td>3</td>
<td>$100.00</td>
<td>$300.00</td>
<td>$</td>
<td>$ - 3.00</td>
<td>$ 300.00</td>
</tr>
<tr>
<td>25</td>
<td>Manhole Lining (Cementitious Mortar with Epoxy Seal)</td>
<td>VF</td>
<td>215</td>
<td>$270.00</td>
<td>$58,050.00</td>
<td>133.83</td>
<td>$ 36,134.10</td>
<td>$ 36,134.10</td>
</tr>
<tr>
<td>26</td>
<td>Traffic Control</td>
<td>LS</td>
<td>1</td>
<td>$3,400.00</td>
<td>$3,400.00</td>
<td>$</td>
<td>$ - 1.00</td>
<td>$ 3,400.00</td>
</tr>
<tr>
<td>27</td>
<td>Mobilization</td>
<td>LS</td>
<td>1</td>
<td>$6,850.00</td>
<td>$6,850.00</td>
<td>$</td>
<td>$ - 1.00</td>
<td>$ 6,850.00</td>
</tr>
<tr>
<td>28</td>
<td>Seeding, Fertilizing, Mulching, Urban mix</td>
<td>ACRE</td>
<td>0.9</td>
<td>$3,850.00</td>
<td>$3,465.00</td>
<td>0.25</td>
<td>$ 962.50</td>
<td>$ 1.00</td>
<td>$ 3,850.00</td>
</tr>
<tr>
<td>29</td>
<td>Exploratory Excavation, Service location</td>
<td>EACH</td>
<td>5</td>
<td>$1,200.00</td>
<td>$6,000.00</td>
<td>$</td>
<td>$ - 6.00</td>
<td>$ 7,200.00</td>
</tr>
<tr>
<th colspan="4">TOTAL OF THE BASE BID (Total of Items 1-29):</th>
<th colspan="2">$481,096.00</th>
<th colspan="2">$37,136.80</th>
<th colspan="2">$ 385,811.47</th>
</tr>
<tr>
<td>CO1</td>
<td>Place concrete around Wye's if Wye's do not need to be replaced</td>
<td>EACH</td>
<td>21.00</td>
<td>($340.00)</td>
<td>($7,140.00)</td>
<td>$</td>
<td>$ - 46.00</td>
<td>$ (15,640.00)</td>
</tr>
<tr>
<td>CO2*</td>
<td>6" Cured In Place Pipe Lining</td>
<td>LF</td>
<td>241.00</td>
<td>$31.00</td>
<td>$7,471.00</td>
<td>12.20</td>
<td>$ 378.20</td>
<td>$ 253.20</td>
<td>$ 7,849.20</td>
</tr>
<tr>
<th colspan="4">CHANGE ORDER SUB-TOTAL</th>
<th colspan="2"></th>
<th colspan="2">$ 378.20</th>
<th colspan="2">$ 29.20</th>
</tr>
<tr>
<th colspan="4">TOTAL</th>
<th colspan="2">$ 37,515.00</th>
<th colspan="2"></th>
<th colspan="2">$ 385,840.67</th>
</tr>
<tr>
<td colspan="4">Retainage</td>
<td colspan="2">$</td>
<td colspan="2"></td>
<td colspan="2">$ 19,292.03</td>
</tr>
<tr>
<td colspan="4">Due</td>
<td colspan="2">$ 37,515.00</td>
<td colspan="2"></td>
<td colspan="2">$ 366,548.64</td>
</tr>
</table>
Sources
- laserfiche: Minutes-9/1/2016 (Minutes-9-1-2016.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.