packet
Packet: Tiffin Regular City Council Meeting (09/01/2026)
Dated September 1, 2026City Council — regular meeting, September 1, 2026 184 pages
Ord. 2026-529, Ord. 2017-398, Ord. 2017-399, Res. 2026-045
Page 139 of 184
Text read by the vision model; check the PDF for anything that matters.<table>
<tr>
<th>Application No.: 12R</th>
<th>Application Period:</th>
<th>From</th>
<th>07/24/26</th>
<th>to</th>
<th>08/21/26</th>
<th>Application Date:</th>
<th>08/21/26</th>
</tr>
<tr>
<td>211</td>
<td>Process Piping Materials</td>
<td>$111,340.84</td>
<td>-</td>
<td>24,701.00</td>
<td>42,224.48</td>
<td>66,925.48</td>
<td>60%</td>
<td>44,415.36</td>
</tr>
<tr>
<td>212</td>
<td>Process Piping Labor</td>
<td>$85,502.50</td>
<td>2,137.56</td>
<td>19,238.06</td>
<td></td>
<td>21,375.62</td>
<td>25%</td>
<td>64,126.88</td>
</tr>
<tr>
<td>213</td>
<td>Valves Materials</td>
<td>$83,000.00</td>
<td>-</td>
<td></td>
<td>29,765.00</td>
<td>29,765.00</td>
<td>36%</td>
<td>53,235.00</td>
</tr>
<tr>
<td>214</td>
<td>Valves Labor</td>
<td>$30,614.26</td>
<td>-</td>
<td></td>
<td></td>
<td></td>
<td>0%</td>
<td>30,614.26</td>
</tr>
<tr>
<td>215</td>
<td>Structure 30 - Clearwell</td>
<td></td>
<td>-</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>-</td>
</tr>
<tr>
<td>216</td>
<td>Process Piping Materials</td>
<td>$62,822.42</td>
<td>7,658.00</td>
<td>6,259.50</td>
<td>2,820.00</td>
<td>16,737.50</td>
<td>27%</td>
<td>46,084.92</td>
</tr>
<tr>
<td>217</td>
<td>Process Piping Labor</td>
<td>$69,588.64</td>
<td>-</td>
<td>17,397.16</td>
<td></td>
<td>17,397.16</td>
<td>25%</td>
<td>52,191.48</td>
</tr>
<tr>
<td>218</td>
<td>Valves Materials</td>
<td>$42,830.00</td>
<td>-</td>
<td></td>
<td>10,554.50</td>
<td>10,554.50</td>
<td>25%</td>
<td>32,275.50</td>
</tr>
<tr>
<td>219</td>
<td>Valves Labor</td>
<td>$26,450.68</td>
<td>-</td>
<td></td>
<td></td>
<td></td>
<td>0%</td>
<td>26,450.68</td>
</tr>
<tr>
<td>220</td>
<td>Insulation</td>
<td>$6,825.00</td>
<td>-</td>
<td></td>
<td></td>
<td></td>
<td>0%</td>
<td>6,825.00</td>
</tr>
<tr>
<td>221</td>
<td></td>
<td></td>
<td>-</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>-</td>
</tr>
<tr>
<td>222</td>
<td>Pollution Control Equipment</td>
<td></td>
<td>-</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>-</td>
</tr>
<tr>
<td>223</td>
<td>Vertical Turbine Pumps Materials</td>
<td>$115,300.00</td>
<td>2,700.00</td>
<td></td>
<td>112,600.00</td>
<td>115,300.00</td>
<td>100%</td>
<td>-</td>
</tr>
<tr>
<td>224</td>
<td>Vertical Turbine Pumps Labor</td>
<td>$24,601.24</td>
<td>-</td>
<td></td>
<td></td>
<td></td>
<td>0%</td>
<td>24,601.24</td>
</tr>
<tr>
<td>225</td>
<td>Slide Gates Materials</td>
<td>$24,155.00</td>
<td>24,155.00</td>
<td></td>
<td></td>
<td>24,155.00</td>
<td>100%</td>
<td>-</td>
</tr>
<tr>
<td>226</td>
<td>Slide Gates Labor</td>
<td>$9,001.40</td>
<td>9,001.40</td>
<td></td>
<td></td>
<td>9,001.40</td>
<td>100%</td>
<td>-</td>
</tr>
<tr>
<td>227</td>
<td>Clearwell Leak Testing</td>
<td>$18,144.00</td>
<td>-</td>
<td>18,144.00</td>
<td></td>
<td>18,144.00</td>
<td>100%</td>
<td>-</td>
</tr>
<tr>
<td>228</td>
<td>Lab Equipment</td>
<td>$7,216.00</td>
<td>-</td>
<td></td>
<td>7,216.00</td>
<td>7,216.00</td>
<td>100%</td>
<td>-</td>
</tr>
<tr>
<td>229</td>
<td>Filter Media Replacement Materials</td>
<td>$49,780.00</td>
<td>49,780.00</td>
<td></td>
<td></td>
<td>49,780.00</td>
<td>100%</td>
<td>-</td>
</tr>
<tr>
<td>230</td>
<td>Filter Media Replacement Labor</td>
<td>$16,480.00</td>
<td>16,480.00</td>
<td></td>
<td></td>
<td>16,480.00</td>
<td>100%</td>
<td>-</td>
</tr>
<tr>
<td>231</td>
<td>Forced Draft Aerator Materials</td>
<td>$125,890.00</td>
<td>-</td>
<td>31,472.50</td>
<td>31,472.50</td>
<td>62,945.00</td>
<td>50%</td>
<td>62,945.00</td>
</tr>
<tr>
<td>232</td>
<td>Forced Draft Aerator Labor</td>
<td>$14,995.00</td>
<td>749.75</td>
<td>6,747.75</td>
<td></td>
<td>7,497.50</td>
<td>50%</td>
<td>7,497.50</td>
</tr>
<tr>
<td>233</td>
<td>RO System Materials</td>
<td>$1,408,500.00</td>
<td>281,700.00</td>
<td>915,525.00</td>
<td></td>
<td>1,197,225.00</td>
<td>85%</td>
<td>211,275.00</td>
</tr>
<tr>
<td>234</td>
<td>RO System Labor</td>
<td>$203,600.00</td>
<td>-</td>
<td>162,880.00</td>
<td></td>
<td>162,880.00</td>
<td>80%</td>
<td>40,720.00</td>
</tr>
<tr>
<td>235</td>
<td>Chem Sys Chlorine Fluoride Caustic</td>
<td>$125,425.00</td>
<td>-</td>
<td></td>
<td>125,425.00</td>
<td>125,425.00</td>
<td>100%</td>
<td>-</td>
</tr>
<tr>
<td>236</td>
<td>Chem Systems Labor</td>
<td>$41,582.00</td>
<td>4,158.20</td>
<td></td>
<td></td>
<td>4,158.20</td>
<td>10%</td>
<td>37,423.80</td>
</tr>
<tr>
<td>237</td>
<td></td>
<td></td>
<td>-</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>-</td>
</tr>
<tr>
<th colspan="2">Original Contract Totals</th>
<th>$ 12,182,553.00</th>
<th>$ 6,640,343.04</th>
<th>$ 1,910,282.04</th>
<th>$ 801,479.18</th>
<th>$ 9,352,104.26</th>
<th>77%</th>
<th>$ 2,830,448.74</th>
</tr>
</table>
Sheets in this document
- p. 16 plan sheet
- p. 21 10A102 · Proposed Floor Plan · MSA · Water Treatment Facility Upgrade
- p. 24 Weatherstripping - Jamb Weatherstripping
- p. 25 Certifications: *Unnotched & Notched profiles available
- p. 26 Thresholds - Saddle
- p. 35 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
- p. 36 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
- p. 45 10A100 · Safety Plan · MSA · Overall Facility
- p. 46 10A101 · Life Safety Plan · MSA
- p. 47 Floor Limits (Graphical · MSA
- p. 48 20A101 · Architectural Floor Plan · MSA · 2 Painted Pipe Bollard
- p. 49 Plan Review Comm · MSA · Proposed
- p. 50 Typical Architectural Details · MSA
- p. 51 Typical Details and Schedule Architectural Schedules · MSA
- p. 52 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
- p. 53 99H601 · HVAC Schedules · MSA
- p. 54 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
- p. 55 20S101 · Foundation Plan · MSA · Water Treatment Facility Upgrade
- p. 56 L-1 · Lintel Schedule · MSA · Mezzanine Framing
- p. 57 Typical Structural Details · MSA
- p. 58 MSA
- p. 62 Power Plan · MSA
- p. 77 EJ1A · Roof Trusses Layout
- p. 78 MT20 · 2 Carpenters for 1 hrs each to layout, cut
- p. 79 MT20 · 2 Carpenters for 2 hrs each to layout, cut
- p. 80 Job Truss Truss Type Qty Ply Tiffin Water Treatment Plant / Structure 20 (chart; data on p. 78)
- p. 82 MT20 · Notes
- p. 160 Exhibit A: Project Location
Sources
- revize: Agenda packet (packet_2026-09-01_3ad1ee37-4af1-4a67-8983-cc30e19b0f9e.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.