<table> <tr> <th colspan="2">Progress Estimate - Lump Sum Work</th> <th colspan="2">Contractor's Application for Payment</th> </tr> <tr> <td>Owner:</td> <td>City of Tiffin</td> <td>Owner's Project No.:</td> <td></td> </tr> <tr> <td>Engineer:</td> <td>MSA Professional Services</td> <td>Engineer's Project No.:</td> <td>13603016</td> </tr> <tr> <td>Contractor:</td> <td>Tricon Construction Group</td> <td>Contractor's Project No.:</td> <td></td> </tr> <tr> <td>Project:</td> <td>Water Treatment Plant Upgrades - City of Tiffin</td> <td colspan="2"></td> </tr> <tr> <td>Contract:</td> <td></td> <td colspan="2"></td> </tr> <tr> <td>Application No.: 12R</td> <td>Application Period: From 07/24/26 to 08/21/26</td> <td>Application Date:</td> <td>08/21/26</td> </tr> <tr> <th colspan="5">Change Orders</th> </tr> <tr> <td>238</td> <td>Change Order #1</td> <td></td> <td></td> <td></td> </tr> <tr> <td>239</td> <td>Electrical Controls Changes</td> <td>$12,420.34</td> <td>-</td> <td>0% 12,420.34</td> </tr> <tr> <td>240</td> <td></td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>241</td> <td>Change Order #2</td> <td></td> <td></td> <td></td> </tr> <tr> <td>242</td> <td>COR #003R2-Water Service Addition</td> <td>3,545.10</td> <td>3,018.07</td> <td>3,018.07 85% 527.03</td> </tr> <tr> <td>243</td> <td>COR-004-XFmr Pad relocate & bollards</td> <td>1,804.21</td> <td>-</td> <td>0% 1,804.21</td> </tr> <tr> <td>244</td> <td>COR-006-Chem Containment Curbs</td> <td>1,022.01</td> <td>1,022.01</td> <td>1,022.01 100%</td> </tr> <tr> <td>245</td> <td>COR-007-Bldg 10 Load Brg Wall Chngs</td> <td>2,556.62</td> <td>442.75</td> <td>2,113.87 2,556.62 100%</td> </tr> <tr> <td>246</td> <td>COR-008R-12" Valve Add,6" Valve Deducts</td> <td>(1,619.74)</td> <td>(1,619.74)</td> <td>(1,619.74) 100%</td> </tr> <tr> <td>247</td> <td>COR-010-MCC Rm Intake Duct Addition</td> <td>3,402.31</td> <td>-</td> <td>0% 3,402.31</td> </tr> <tr> <td>248</td> <td>COR-012-Low Lift Pump Efficiency Credit</td> <td>(2,890.94)</td> <td>(2,890.94)</td> <td>(2,890.94) 100%</td> </tr> <tr> <td>249</td> <td></td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>250</td> <td></td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>251</td> <td></td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>252</td> <td></td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>253</td> <td></td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>254</td> <td></td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>255</td> <td></td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>256</td> <td></td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>257</td> <td></td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td colspan="2">Change Order Totals</td> <td>$ 20,239.91</td> <td>$(27.85)</td> <td>$ 2,113.87 $ 2,086.02 10% $ 18,153.89</td> </tr> <tr> <th colspan="5">Original Contract and Change Orders</th> </tr> <tr> <td>Project Totals</td> <td>$ 12,202,792.91</td> <td>$ 6,640,315.19</td> <td>$ 1,912,395.91</td> <td>$ 801,479.18 $ 9,354,190.28 77% $ 2,848,602.63</td> </tr> </table>

Sheets in this document

  • p. 16 plan sheet
  • p. 21 10A102 · Proposed Floor Plan · MSA · Water Treatment Facility Upgrade
  • p. 24 Weatherstripping - Jamb Weatherstripping
  • p. 25 Certifications: *Unnotched & Notched profiles available
  • p. 26 Thresholds - Saddle
  • p. 35 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
  • p. 36 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
  • p. 45 10A100 · Safety Plan · MSA · Overall Facility
  • p. 46 10A101 · Life Safety Plan · MSA
  • p. 47 Floor Limits (Graphical · MSA
  • p. 48 20A101 · Architectural Floor Plan · MSA · 2 Painted Pipe Bollard
  • p. 49 Plan Review Comm · MSA · Proposed
  • p. 50 Typical Architectural Details · MSA
  • p. 51 Typical Details and Schedule Architectural Schedules · MSA
  • p. 52 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
  • p. 53 99H601 · HVAC Schedules · MSA
  • p. 54 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
  • p. 55 20S101 · Foundation Plan · MSA · Water Treatment Facility Upgrade
  • p. 56 L-1 · Lintel Schedule · MSA · Mezzanine Framing
  • p. 57 Typical Structural Details · MSA
  • p. 58 MSA
  • p. 62 Power Plan · MSA
  • p. 77 EJ1A · Roof Trusses Layout
  • p. 78 MT20 · 2 Carpenters for 1 hrs each to layout, cut
  • p. 79 MT20 · 2 Carpenters for 2 hrs each to layout, cut
  • p. 80 Job Truss Truss Type Qty Ply Tiffin Water Treatment Plant / Structure 20 (chart; data on p. 78)
  • p. 82 MT20 · Notes
  • p. 160 Exhibit A: Project Location

Sources

  • revize: Agenda packet (packet_2026-09-01_3ad1ee37-4af1-4a67-8983-cc30e19b0f9e.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.