Packet: Tiffin Regular City Council Meeting (09/01/2026)
Dated September 1, 2026City Council — regular meeting, September 1, 2026 184 pages
Ord. 2026-529, Ord. 2017-398, Ord. 2017-399, Res. 2026-045
Page 140 of 184
Text read by the vision model; check the PDF for anything that matters.<table>
<tr>
<th colspan="2">Progress Estimate - Lump Sum Work</th>
<th colspan="2">Contractor's Application for Payment</th>
</tr>
<tr>
<td>Owner:</td>
<td>City of Tiffin</td>
<td>Owner's Project No.:</td>
<td></td>
</tr>
<tr>
<td>Engineer:</td>
<td>MSA Professional Services</td>
<td>Engineer's Project No.:</td>
<td>13603016</td>
</tr>
<tr>
<td>Contractor:</td>
<td>Tricon Construction Group</td>
<td>Contractor's Project No.:</td>
<td></td>
</tr>
<tr>
<td>Project:</td>
<td>Water Treatment Plant Upgrades - City of Tiffin</td>
<td colspan="2"></td>
</tr>
<tr>
<td>Contract:</td>
<td></td>
<td colspan="2"></td>
</tr>
<tr>
<td>Application No.: 12R</td>
<td>Application Period: From 07/24/26 to 08/21/26</td>
<td>Application Date:</td>
<td>08/21/26</td>
</tr>
<tr>
<th colspan="5">Change Orders</th>
</tr>
<tr>
<td>238</td>
<td>Change Order #1</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>239</td>
<td>Electrical Controls Changes</td>
<td>$12,420.34</td>
<td>-</td>
<td>0% 12,420.34</td>
</tr>
<tr>
<td>240</td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
</tr>
<tr>
<td>241</td>
<td>Change Order #2</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>242</td>
<td>COR #003R2-Water Service Addition</td>
<td>3,545.10</td>
<td>3,018.07</td>
<td>3,018.07 85% 527.03</td>
</tr>
<tr>
<td>243</td>
<td>COR-004-XFmr Pad relocate & bollards</td>
<td>1,804.21</td>
<td>-</td>
<td>0% 1,804.21</td>
</tr>
<tr>
<td>244</td>
<td>COR-006-Chem Containment Curbs</td>
<td>1,022.01</td>
<td>1,022.01</td>
<td>1,022.01 100%</td>
</tr>
<tr>
<td>245</td>
<td>COR-007-Bldg 10 Load Brg Wall Chngs</td>
<td>2,556.62</td>
<td>442.75</td>
<td>2,113.87 2,556.62 100%</td>
</tr>
<tr>
<td>246</td>
<td>COR-008R-12" Valve Add,6" Valve Deducts</td>
<td>(1,619.74)</td>
<td>(1,619.74)</td>
<td>(1,619.74) 100%</td>
</tr>
<tr>
<td>247</td>
<td>COR-010-MCC Rm Intake Duct Addition</td>
<td>3,402.31</td>
<td>-</td>
<td>0% 3,402.31</td>
</tr>
<tr>
<td>248</td>
<td>COR-012-Low Lift Pump Efficiency Credit</td>
<td>(2,890.94)</td>
<td>(2,890.94)</td>
<td>(2,890.94) 100%</td>
</tr>
<tr>
<td>249</td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
</tr>
<tr>
<td>250</td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
</tr>
<tr>
<td>251</td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
</tr>
<tr>
<td>252</td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
</tr>
<tr>
<td>253</td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
</tr>
<tr>
<td>254</td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
</tr>
<tr>
<td>255</td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
</tr>
<tr>
<td>256</td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
</tr>
<tr>
<td>257</td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
</tr>
<tr>
<td colspan="2">Change Order Totals</td>
<td>$ 20,239.91</td>
<td>$(27.85)</td>
<td>$ 2,113.87 $ 2,086.02 10% $ 18,153.89</td>
</tr>
<tr>
<th colspan="5">Original Contract and Change Orders</th>
</tr>
<tr>
<td>Project Totals</td>
<td>$ 12,202,792.91</td>
<td>$ 6,640,315.19</td>
<td>$ 1,912,395.91</td>
<td>$ 801,479.18 $ 9,354,190.28 77% $ 2,848,602.63</td>
</tr>
</table>
Sheets in this document
- p. 16 plan sheet
- p. 21 10A102 · Proposed Floor Plan · MSA · Water Treatment Facility Upgrade
- p. 24 Weatherstripping - Jamb Weatherstripping
- p. 25 Certifications: *Unnotched & Notched profiles available
- p. 26 Thresholds - Saddle
- p. 35 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
- p. 36 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
- p. 45 10A100 · Safety Plan · MSA · Overall Facility
- p. 46 10A101 · Life Safety Plan · MSA
- p. 47 Floor Limits (Graphical · MSA
- p. 48 20A101 · Architectural Floor Plan · MSA · 2 Painted Pipe Bollard
- p. 49 Plan Review Comm · MSA · Proposed
- p. 50 Typical Architectural Details · MSA
- p. 51 Typical Details and Schedule Architectural Schedules · MSA
- p. 52 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
- p. 53 99H601 · HVAC Schedules · MSA
- p. 54 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
- p. 55 20S101 · Foundation Plan · MSA · Water Treatment Facility Upgrade
- p. 56 L-1 · Lintel Schedule · MSA · Mezzanine Framing
- p. 57 Typical Structural Details · MSA
- p. 58 MSA
- p. 62 Power Plan · MSA
- p. 77 EJ1A · Roof Trusses Layout
- p. 78 MT20 · 2 Carpenters for 1 hrs each to layout, cut
- p. 79 MT20 · 2 Carpenters for 2 hrs each to layout, cut
- p. 80 Job Truss Truss Type Qty Ply Tiffin Water Treatment Plant / Structure 20 (chart; data on p. 78)
- p. 82 MT20 · Notes
- p. 160 Exhibit A: Project Location
Sources
- revize: Agenda packet (packet_2026-09-01_3ad1ee37-4af1-4a67-8983-cc30e19b0f9e.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.