packet
Packet: Tiffin Regular City Council Meeting (09/01/2026)
Dated September 1, 2026City Council — regular meeting, September 1, 2026 184 pages
Ord. 2026-529, Ord. 2017-398, Ord. 2017-399, Res. 2026-045
Page 79 of 184
Text from the PDF text layer; check the PDF for anything that matters. Job Truss Truss Type Qty Ply TIFFIN WATER TREATMENT PLANT / STRUCTURE 20
I82462235
26045-RO EJ1A Jack-Closed 4 1 Job Reference (optional)
Revoswel Truss & Lumber, LLC, Marion, IA - 52302, Run: 25.40 E Dec 15 2025 Print: 25.4.0 E Dec 15 2025 MiTek Industries, Inc. Thu Jun 04 14:19:08 Page: 1
REPAIR: ID:7vua1wvKJ3Q1MjcXxROCuRygiRm-VPwhGEBB761b_UTlSiIyYkARGaJuFjhfseM7W4z9eBH
BUILDING CODE CHANGED FROM 2015 TO 2018
SPACING CHANGED FROM 2-0-0 TO 2-2-0
-2-0-0 5-11-10 11-11-4
2-0-0 5-11-10 5-11-10
4x4
=
4
12 16" X 24"
4
3x4 = 10
1-4-0
3
9
5-2-4
5x6 =
8
2
1
1-2-8
7 5
6
3x4 3x6 =
=
4x4 =
ATTACH 1/2" PLYWOOD OR OSB GUSSET (15/32" RATED SHEATHING 32/16 EXP 1)
TO EACH FACE OF TRUSS WITH (0.131" X 2.5" MIN.) NAILS PER THE FOLLOWING NAIL
SCHEDULE: 2 X 4'S - 3 ROWS: SPACED @ 4" O.C. NAILS TO BE DRIVEN FROM BOTH
FACES. STAGGER SPACING FROM FRONT TO BACK FACE FOR A NET 2" O.C. SPACING
IN EACH COVERED TRUSS MEMBER. USE 2" MEMBER END DISTANCE.
5-11-10 11-11-4
5-11-10 5-11-10
Scale = 1:35.6
Plate Offsets (X, Y): [2:0-2-11,0-2-10]
Loading (psf) Spacing 2-2-0 CSI DEFL in (loc) l/defl L/d PLATES GRIP
TCLL (roof) 20.0 Plate Grip DOL 1.15 TC 0.40 Vert(LL) -0.02 6-7 >999 360 MT20 197/144
Snow (Pf/Pg) 19.3/25.0 Lumber DOL 1.15 BC 0.17 Vert(CT) -0.03 5-6 >999 240
TCDL 10.0 Rep Stress Incr NO WB 0.51 Horz(CT) 0.01 5 n/a n/a
BCLL 0.0 Code IBC2018/TPI2014 Matrix-R
BCDL 10.0 Weight: 53 lb FT = 20%
LUMBER 5) This truss has been designed for greater of min roof live
TOP CHORD 2x4 SPF 2100F 1.8E load of 12.0 psf or 2.00 times flat roof load of 19.2 psf on
BOT CHORD 2x4 SPF 2100F 1.8E overhangs non-concurrent with other live loads.
WEBS 2x4 SPF No.2 6) Refer to girder(s) for truss to truss connections.
BRACING 7) Provide mechanical connection (by others) of truss to
TOP CHORD Structural wood sheathing directly applied or bearing plate capable of withstanding 123 lb uplift at joint
6-0-0 oc purlins, except end verticals. 7 and 141 lb uplift at joint 5.
BOT CHORD Rigid ceiling directly applied or 6-0-0 oc 8) This truss is designed in accordance with the 2018
bracing. International Building Code section 2306.1 and
referenced standard ANSI/TPI 1.
REACTIONS (lb/size) 5=483/ Mechanical, 7=644/0-11-4
LOAD CASE(S) Standard
Max Horiz 7=283 (LC 8)
Max Uplift 5=-141 (LC 8), 7=-123 (LC 7)
Max Grav 5=624 (LC 12), 7=698 (LC 12) Material:
FORCES (lb) - Max. Comp./Max. Ten. - All forces 250
- 4 trusses x 4 gussets/ truss = 16 gussets
(lb) or less except when shown. - 3 sheets of 1/2" plywood
TOP CHORD 2-7=-630/160, 2-8=-770/27, 8-9=-666/37, - Nails 0.131 x 2.5
3-9=-664/48
BOT CHORD 6-7=-230/295, 5-6=-170/678 Labor:
WEBS 3-5=-703/126, 2-6=-41/588 2 Carpenters for 2 hrs each to layout, cut
NOTES 2 Carpenters for 2 hrs each to attach new gussets in existing attic
1) Unbalanced roof live loads have been considered for this space
design.
2) Wind: ASCE 7-16; Vult=120mph (3-second gust)
Vasd=95mph; TCDL=6.0psf; BCDL=6.0psf; h=15ft; Cat.
III; Exp B; Enclosed; C-C Exterior(2E) -2-0-0 to 1-0-0,
Interior (1) 1-0-0 to 11-9-8; cantilever left and right
exposed ; end vertical left and right exposed; Lumber
DOL=1.33 plate grip DOL=1.33
3) TCLL: ASCE 7-16; Pr=20.0 psf (roof LL: Lum DOL=1.15
Plate DOL=1.15); Pg=25.0 psf; Pf=19.2 psf (Lum DOL =
1.15 Plate DOL = 1.15); Is=1.1; Rough Cat B; Partially
Exp.; Ce=1.0; Cs=1.00; Ct=1.00 June 5,2026
4) Unbalanced snow loads have been considered for this
design.
WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 1/2/2023 BEFORE USE.
Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall
building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the 16023 Swingley Ridge Rd.
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, and DSB-22 available from Truss Plate Institute (www.tpinst.org) Chesterfield, MO 63017
and BCSI Building Component Safety Information available from the Structural Building Component Association (www.sbcscomponents.com) 314.434.1200 / MiTek-US.com
Sources
- revize: Agenda packet (packet_2026-09-01_3ad1ee37-4af1-4a67-8983-cc30e19b0f9e.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 18, 2026. Built from the archive's documents; see how the data is built.