contract agreement · K-3

K-3 - Professional Services Agreement with MSA - Water Treatment Plant

Dated December 19, 2023City Council — regular meeting, December 19, 2023 11 pages

Open the PDF Searchable (OCR) PDF

Page 6 of 11

Text read by the vision model; check the PDF for anything that matters.
a. Iowa Department of Natural Resources (IDNR) Petition for Waiver for positioning clear well bottom below 100-year floodplain elevation.* b. Iowa Department of Natural Resources (IDNR) Water Supply Construction Permit Schedules 1a, 1c, 2a, 2b, 6a, 13a, and 14.* c. Joint Floodplain Permit (no flood study anticipated).* *Permit review schedule is outside of MSA’s control 7. Cost Estimates a. MSA shall provide an opinion of probable cost for the water treatment facility including civil, mechanical, electrical, plumbing, architectural, structural, controls, contingency, and engineering. DELIVERABLES MSA will provide the following deliverables: 1. Final Plans, Opinion of Probable Cost, and Specifications a. (1) 11"x17" paper copy of final plans b. PDF of final plans and specifications c. 3D Renderings from Revit Design Model** **Conceptual renderings are provided to give a general understanding of project scope, site layout, and aesthetics. Renderings are not intended to be an exact representation of finishes/colors. It is expected that changes will be implemented as the design process progresses. Owner shall select all final finishes/colors. ADDITIONAL SERVICES Services that are not included in the above Scope of Services can be provided under separate contract or by amending the scope and fee listed in this Agreement. Examples of additional services that may be needed or desired for completion of the project include: 1. Review of existing easement documents. 2. Assistance with acquisition of real estate and/or temporary or permanent easements. 3. Survey monumentation. 4. Radiopath Study. 5. Evaluation and accommodations for ADA-compliant spaces. 6. Utility system modeling and/or mapping. 7. Funding applications and administration. 8. Additional meetings not specifically listed in the scope. 9. Accommodations for environmental hazards, endangered species, or historical or cultural issues at or near the project site. 10. Permit assistance related to surface waters and wetlands not specifically listed in this scope. 11. Variance requests (if required for permit applications included in the scope). 12. Updates to Owner's electronic Geographic Information System (GIS) to reflect changes from project. 13. Coordinate sub-surface investigations. 14. Wetland Investigation. 15. Floodplain or floodway investigation in more detail than information provided by Iowa DNR. 16. Environmental and Historical Review. 17. Archeological Studies.

Sources

  • sharepoint (K-3 - Professional Services Agreement with MSA - Water Treatment Plant.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.