staff report memo · K-4

K-4 - Sidewalk Change, 300 block Summerhays - Original Town Phase 3

Open the PDF Searchable (OCR) PDF

Page 2 of 2

Text read by the vision model; check the PDF for anything that matters.
SUMMERHAYS STREET E. THIRD STREET U.S. 6 / MARINGO ROAD BEGIN PHASE 3 - S.W. INSTALL STEPS PER SUDDAS 9086.102 BEGIN PHASE 3 INSTALL STEPS PER SUDDAS 9086.102 GRAPHIC SCALE 1/8" = 1' - 0" 1 inch = 20 ft. END ALIGNMENT ORIGINAL TOWN URBANIZATION: PHASE THREE Sheet Number D.04

Sources

  • sharepoint (K-4 - Sidewalk Change, 300 block Summerhays - Original Town Phase 3.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.