staff report memo · K-4
K-4 - Sidewalk Change, 300 block Summerhays - Original Town Phase 3
Page 2 of 2
Text read by the vision model; check the PDF for anything that matters.SUMMERHAYS STREET
E. THIRD STREET
U.S. 6 / MARINGO ROAD
BEGIN PHASE 3 - S.W.
INSTALL STEPS PER SUDDAS 9086.102
BEGIN PHASE 3
INSTALL STEPS PER SUDDAS 9086.102
GRAPHIC SCALE
1/8" = 1' - 0"
1 inch = 20 ft.
END ALIGNMENT
ORIGINAL TOWN URBANIZATION: PHASE THREE
Sheet Number D.04
Sources
- sharepoint (K-4 - Sidewalk Change, 300 block Summerhays - Original Town Phase 3.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.