resolution · I-4
I-4 - Resolution 2025-010 - Full Release and Settlement Agreement
Page 13 of 17
Text from the PDF text layer; check the PDF for anything that matters. ESTIMATED TEMP CONSTRUCTION EASEMENT
EXISTING OVER HEAD ELECTRIC
JASPER AVENUE
780
JASPER AVENUE
22+00
780
PROPOSED RIGHT OF WAY
PROPOSED ELECTRIC
21+00
RELOCATION BY CIPCO
78
0
15' P.U.E.
20+00
79
0
EXISTING FLARED
END SECTION
PROPOSED STORM SEWER
79
790
0
79
0
19+00
PROPOSED DRAINAGE EASEMENT
80
0 EXISTING INTAKE / STORM SEWER
APPROX. GRADING LIMITS 790 STREET LIGHT (TYP)
81
0
18+00
.E. 258+00
P.U 259+00
15' 260+00 261+00 262+00
82
NEW STORM 257+0
0 263+00 264+00 265+00.27
265+00
0
256
+00 FOREVERGREEN ROAD
FOREVERGREEN ROAD
5' PCC SIDEWALK
JOHNSON COUNTY
17+00
830 +00
255
CITY OF NORTH LIBERTY
CITY OF TIFFIN
+00
254 CITY OF CORALVILLE
790
820
+00
253
.E.
P.U .
15' P .U.E
15'
16+00
810
15' P.U.E.
+00
252 800
+00
OAADD
251 PROPOSED STORM SEWER
RO
ENN R
R GGRE
R EE
R +00
EEVVEE
15'
250
R
P.U
OO R
F F
.E.
15+00
+00
249
.E.
15'
15'
P.U NEW STORM
P.U
+00 8' PCC TRAIL
.E.
248
(CONNECT TO BRIDGE)
P
PAAR
RKKR
ROOAD
14+00
EXISTING FIBER OPTIC
ROAD
AD
AVENUE
EXISTING RIGHT OF WAY
PARK
JASPER
OLD
800 N
13+00
FOREVERGREEN ROAD AND JASPER SCALE
ROUNDABOUT CONCEPTS DUAL LANE ROUNDABOUT
NORTH LIBERTY, IOWA
(;+,%,7$ 06/26/2020 EXHIBIT: A
1
Sources
- sharepoint (I-4 - Resolution 2025-010 - Full Release and Settlement Agreement.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.