K-7 - Guaranteed Maximum Price Amendment - Miron

Open the PDF

Page 3 of 10

Text from the PDF text layer; check the PDF for anything that matters.
Not later than ( ) calendar days from the date of commencement of the Work. [X ] By the following date: October 21, 2026 § A.2.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents, if portions of the Work are to be completed prior to Substantial Completion of the entire Work, the Construction Manager shall achieve Substantial Completion of such portions by the following dates: Portion of Work Substantial Completion Date § A.2.3.3 Ifthe Construction Manager fails to achieve Substantial Completion as provided in this Section A.2.3, liquidated damages, if any, shall be assessed as set forth in Section 6.1.6 of the Agreement. ARTICLE A.3 INFORMATION UPON WHICH AMENDMENT IS BASED § A.3.1 The Guaranteed Maximum Price and Contract Time set forth in this Amendment are based on the Contract Documents and the following: § A.3.1.1 The following Supplementary and other Conditions of the Contract: Document Title Date Pages § A.3.1.2 The following Specifications: (Either list the Specifications here, or refer to an exhibit attached to this Amendment.) Exhibit 2 Section Title Date Pages § A.3.1.3 The following Drawings: (Either list the Drawings here, or refer to an exhibit attached to this Amendment.) Exhibit 3 Number Title Date § A.3.1.4 The Sustainability Plan, if any: (Ifthe Owner identified a Sustainable Objective in the Owner's Criteria, identify the document or documents that comprise the Sustainability Plan by title, date and number ofpages, and include other identifying information. The Sustainability Plan identifies and describes the Sustainable Objective; the targeted Sustainable Measures; implementation strategies selected to achieve the Sustainable Measures; the Owner's and Construction Manager's roles and responsibilities associated with achieving the Sustainable Measures; the specific details about design reviews, testing or metrics to verify achievement ofeach Sustainable Measure; and the Sustainability Documentation requiredfor the Project, as those terms are defined in Exhibit C to the Agreement.) Title Date Pages Other identifying information: § A.3.1.5 Allowances, if any, included in the Guaranteed Maximum Price: (Identify each allowance.) AIA Document A 133- 2019 Exhibit A Copyright© 1991, 2003, 2009, and 2019. All rights reserved. "The American Institute of Architects," "American Institute of lnit. Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 18:38:39 3 ET on 05/02/2025 under Order No.4104244063 which expires on 06/30/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail [email protected]. User Notes: (843918169)

Sources

  • sharepoint (K-7 - Guaranteed Maximum Price Amendment - Miron.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.