K-7 - Guaranteed Maximum Price Amendment - Miron

Open the PDF

Page 2 of 10

Text from the PDF text layer; check the PDF for anything that matters.
Contract Documents. All activities/items are considered lump sum values with the exception of the items identified in Article A.3 .1.5. § A.1.1.2 Itemized Statement of the Guaranteed Maximum Price. Provided below is an itemized statement of the Guaranteed Maximum Price organized by trade categories, including allowances; the Construction Manager's contingency; alternates; the Construction Manager's Fee; and other items that comprise the Guaranteed Maximum Price as defined in Section 3.2. I of the Agreement. (Provide itemized statement below or reference an attachment.) Exhibit I Cost Summary § A.1.1.3 The Construction Manager's Fee is set forth in Section 6.1.2 ofthe Agreement. § A.1.1.4 The method of adjustment of the Construction Manager's Fee for changes in the Work is set forth in Section 6.1.3 of the Agreement. § A.1.1.5 Alternates § A.1.1.5.1 Alternates, if any, included in the Guaranteed Maximum Price: Item Price § A.1.1.5.2 Subject to the conditions noted below, the following alternates may be accepted by the Owner following execution of this Exhibit A. Upon acceptance, the Owner shall issue a Modification to the Agreement. (Insert below each alternate and the conditions that must be metfor the Owner to accept the alternate.) Item Price Conditions for Acceptance § A.1.1.6 Unit prices, if any: (Identify the item and state the unit price and quantity limitations, if any, to which the unit price will be applicable.) Item Units and Limitations Price per Unit ($0.00) ARTICLE A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § A.2.1 The date of commencement of the Work shall be: (Check one ofthefollowing boxes.) [X ] The date of execution of this Amendment. Established as follows: (Insert a date or a means to determine the date ofcommencement ofthe Work.) If a date of commencement of the Work is not selected, then the date of commencement shall be the date of execution of this Amendment. § A.2.2 Unless otherwise provided, the Contract Time is the period of time, including authorized adjustments, allotted in the Contract Documents for Substantial Completion of the Work. The Contract Time shall be measured from the date of commencement of the Work. § A.2.3 Substantial Completion § A.2.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents, the Construction Manager shall achieve Substantial Completion of the entire Work: (Check one ofthefollowing boxes and complete the necessary information.) AIA Document A133- 2019 Exhibit A. Copyright @ 1991, 2003, 2009, and 2019. All rights reserved. "The American Institute of Architects," "American Institute of Init. Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 18:38:39 2 ET on 05/02/2025 under Order No.4104244063 which expires on 06/30/2025, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail [email protected]. User Notes: (843918169)

Sources

  • sharepoint (K-7 - Guaranteed Maximum Price Amendment - Miron.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.