contract agreement · K-7
K-7 - Guaranteed Maximum Price Amendment - Miron
Page 1 of 10
Text from the PDF text layer; check the PDF for anything that matters. ..
: AI4 Document A133- 2019 Exhibit A
Guaranteed Maximum Price Amendment
This Amendment dated the 6th day of May in the year 2025, is incorporated into the
accompanying AIA Document A133™-2019, Standard Fonn of Agreement Between
Owner and Construction Manager as Constructor where the basis of payment is the Cost of
ADDITIONS AND DELETIONS:
tbe Work Plus a Fee with a Guaranteed Maximum Price dated the 19th day ofNovember in
The author of this document has
the year 2024 (the "Agreement")
added information needed for its
(In words, indicate day, month, andyear.) completion. The author may also
have revised the text of the original
for the following PROJECT: AIA standard form. An Additions and
(Name and address or location) Deletions Report that notes added
information as well as revisions to the
Tiffin Recreation Center standard form text is available from
I 05 S. Park Road the author and should be reviewed. A
Tiffin, IA 52340 vertical line in the left margin of this
document indicates where the author
THE OWNER: has added necessary information
(Name, legal status, and address) and where the author has added to or
deleted from the original AIA text.
City of Tiffin This document has important legal
300 Railroad Street consequences. Consultation with an
Tiffin, IA 52340 attorney is encouraged with respect
to its completion or modification.
THE CONSTRUCTION MANAGER:
(Name, legal status, and address) AIA Document A201 ™-2017,
General Conditions of the Contract
Miron Construction Co., Inc. for Construction, is adopted in this
1471 McMahon Drive document by reference. Do not use
with other general conditions unless
Neenah, WI 54956
this document is modified.
TABLE OF ARTICLES
A.1 GUARANTEED MAXIMUM PRICE
A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
A.3 INFORMATION UPON WHICH AMENDMENT IS BASED
A.4 CONSTRUCTION MANAGER'S CONSULTANTS, CONTRACTORS, DESIGN
PROFESSIONALS, AND SUPPLIERS
ARTICLE A.1 GUARANTEED MAXIMUM PRICE
§ A.1.1 Guaranteed Maximum Price
Pursuant to Section 3.2.6 of the Agreement, the Owner and Construction Manager hereby
amend the Agreement to establish a Guaranteed Maximum Price. As agreed by the Owner
and Construction Manager, the Guaranteed Maximum Price is an amount that the Contract
Sum shall not exceed. The Contract Sum consists of the Construction Manager's Fee plus
the Cost oftbe Work, as that tennis defined in Article 6 of the Agreement.
§ A.1.1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed
Twelve Million Four Hundred Thirty-Five Thousand One Hundred Forty-Two Dollars
($12,435,142), subject to additions and deductions by Change Order as provided in the
AIA Document A133- 2019 Exhibit A Copyright© 1991, 2003, 2009, and 2019. All rights reserved. "The American Institute of Architects," "American Institute of
lnit. Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 18:38:39 1
ET on 05/02/2025 under Order No.4104244063 which expires on 06/30/2025, is not for resale, is licensed for one-time use only, and may only be used in
accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail [email protected].
User Notes: (843918169)