staff report memo

WS - D - Staff Report - Fire Station Drainage Improvements

Open the PDF Searchable (OCR) PDF

Page 8 of 9

Text read by the vision model; check the PDF for anything that matters.
Parking Lot Option 3: Remove and Replace Pavement 100% Reduction EST. $79,000 PRE CONSTRUCTION 20,346 SF total drainage existing to low point between doors Replace stoops and replace pavement with valley for surface runoff towards Main Street POST CONSTRUCTION No water ponding at entrances to fire station Pre-Construction Flow Area Post Construction Flow Area Pavement Reconstruction Existing Flow Direction Existing Gutter Outflow Location Proposed Storm Improvements

Sources

  • sharepoint (WS - D - Staff Report - Fire Station Drainage Improvements.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.