resolution · I-4

Resolution No. 2025-073 - A Resolution Approving the Final Plat for Prairie Village, Part 3, Phase 4

Open the PDF

Page 6 of 6

Text from the PDF text layer; check the PDF for anything that matters.
A GE 3 LL E VI AS E I RI , PH A 3 PR RT PA MAGNOLIA WAY (66.00' R.O.W.) 15.00' P.U.E. 25.00' SANITARY 25.00' SANITARY SEWER EASEMENT 1 SEWER EASEMENT 20.00' WATER 27 37.50' 53 79 EASEMENT 37.50' 26 34.00' 2 25 34.00' 52 28 20.00' WATER 78 EASEMENT 3 24 12.50' 51 77 10.00' P.U.E. 29 10.00' P.U.E. 4 23 15.00' SURFACE WATER 50 FLOWAGE EASEMENT 30 15.00' P.U.E. 76 (7.50' BOTH SIDES) 49 N. KIMBERLITE STREET 15.00' P.U.E. 75 5 22 31 (7.50' BOTH SIDES) 15.00' P.U.E. (7.50' BOTH SIDES) (66.00' R.O.W.) A GE 1 LL E 48 VI AS 74 6 15.00' P.U.E. IE H 15.00' P.U.E. 21 (7.50' BOTH SIDES) A IR 3, P (7.50' BOTH SIDES) PR RT 32 PA 47 7 20 33 OUTLOT Z 73 46 8 19 34 72 45 9 35 18 15.00' P.U.E. 71 (7.50' BOTH SIDES) 44 15.00' P.U.E. (7.50' BOTH SIDES) L2 2 15.00' P.U.E. L21 L20 L23 (7.50' BOTH SIDES) 15.00' P.U.E. 70 10 (7.50' BOTH SIDES) 36 17 L24 L25 11 43 69 16 37 42 7.50' SURFACE WATER FLOWAGE 12 EASEMENT 30.00' INGRESS/EGRESS EASEMENT (15.00' BOTH SIDES) 38 LINE TABLE LINE TABLE 15 30.00' INGRESS/EGRESS EASEMENT LINE # DIRECTION LENGTH LINE # DIRECTION LENGTH 68 L2 (15.00' BOTH SIDES) 41 L1 N00°39'31"W 30.06' L14 N86°24'33"W 7.52' 13 L7 L12 L2 N89°20'29"E 7.50' L15 N86°24'33"W 41.79' L1 L3 L3 S00°39'31"E 30.61' L16 N42°06'59"E 26.89' 14 39 L6 L4 N86°24'33"W 7.52' L17 N89°20'29"E 43.41' DRAWING PATH: P:\200641\06-Drawings\Survey\200641-FP-PT3PH4.dwg PLOT DATE: 06/26/2025 8:21 AM PLOTTED BY: ALEC FULLER L8 L17 L11 L13 L5 N86°24'33"W 20.06' L18 S00°39'31"E 24.32' L4 40 6 L6 N00°39'31"W 25.07' L19 N86°24'33"W 20.05' L1 STORM WATER L18 L5 L9 EASEMENT L7 S86°24'33"E 40.11' L20 N00°39'31"W 7.50' STORM WATER L10 EASEMENT L14 L15 L19 L8 S00°39'31"E 25.07' L21 S89°20'29"W 101.41' STORM WATER L9 N86°24'33"W 20.05' L22 N45°00'00"W 19.44' EASEMENT STORM WATER EASEMENT L10 N86°24'33"W 7.52' L23 S00°39'31"E 28.91' L11 N00°39'31"W 29.50' L24 N89°20'29"E 115.00' STREET LOT A L12 N89°20'29"E 15.00' L25 N00°39'31"W 7.50' STATE STREET L13 S00°39'31"E 30.61' (66.00' R.O.W.) PRAIRIE VILLAGE PART 3 PHASE 4 FINAL PLAT NORTH 0 7.5 15 30 ENGINEER DRAWN BY REVISIONS B.ACHEN K.HART 6/6/2025 TIFFIN, IA 6/17/2025 JOHNSON COUNTY making lives better. (IN FEET) SURVEYOR CREW CHIEF A.FULLER - 6/25/2025 SEC. 27-80-07 1 inch = 30 ft. . 200641 2229 E Grantview Lane, STE 2 . Coralville, Iowa 52241 SHEET NO. 6/1/2025 319-626-9090 05/05

Sources

  • revize: Resolution (1Jxamm0aQ50P12EeCZiNJIXkZgb2zN.pdf) — where it was found ↗ first seen Oct 12, 2026
  • sharepoint (I-4 - Resolution 2025-073 - Approving Prairie Village Part 3, Phase 4 - Final Plat.pdf) — where it was found ↗ first seen Oct 12, 2026

Attached to agenda item: I-4 Resolution No. 2025-073 - A Resolution Approving the Final Plat for Prairie Village,...

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.