City of Tiffin July 31, 2025 PROJECT UPDATE Upcoming Infrastructure Description Next Steps/Schedule Project The current wastewater treatment facility (WWTF) has a chloride Final Compliance with NPDES compliance schedule. There is not any wastewater treatment Permit required October 1, 2025. equipment/processes designed to remove chloride so typically source control is the only economical means of meeting MSA presented its findings on Wastewater Treatment compliance. The existing treatment facility is at about 50% November 1st, 2022. MSA has Improvements capacity. However, if the past growth rate continues an expansion prepared a proposed schedule will be required in the next 5-7 years. for wastewater treatment, water treatment and water supply From design to construction the process typically takes 3-4 years. improvement projects. DOT has agreed to continue the existing permit based on the City’s plan to replace the signals with a permanent installation in 2026. Deer View Ave & Tall Grass Ave & Scope includes both pedestrian and vehicle accommodations. MSA Begin conceptual review of Hwy 6 Intersection Improvements is reaching out to the DOT to request a time extension and will intersection/signals. begin conceptually reviewing the signals and intersection for DOT approval. Roberts Ferry Road & Village MSA is preparing an agreement for the design and bid of a signal at MSA to provide agreement to Drive Signal the Roberts Ferry Road & Village Drive Intersection begin design. PROJECT UPDATE Page 3 of 3

Sources

  • revize: Engineer's Report (ssrW6cKpkpeQrTeyt3I9G2gvlT38LZ.pdf) — where it was found ↗ first seen Oct 12, 2026
  • sharepoint (M-9 - Staff Cover - Engineer's Report.pdf) — where it was found ↗ first seen Oct 12, 2026

Attached to agenda item: M Reports from City Personnel

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.