resolution · I-1
Resolution 2025-075 – Resolution Setting as Public Hearing to Consider Adoption of an Updated Floodplain Management Ordinance for the City of Tiffin, Iowa.
Page 17 of 20
Text from the PDF text layer; check the PDF for anything that matters. C. No development shall affect the capacity or conveyance of the channel or floodway of
any tributary to the main stream, drainage ditch or any other drainage facility or system.
D. Structures, buildings, recreational vehicles, and sanitary and utility systems, if
permitted, shall meet the applicable General Floodplain standards and shall be
constructed or aligned to present the minimum possible resistance to flood flows.
E. Structures, if permitted, shall have a low flood damage potential and shall not be for
human habitation.
F. Storage of materials or equipment that are buoyant, flammable, explosive or injurious
to human, animal or plant life is prohibited. Storage of other material may be allowed
if readily removable from the floodway within the time available after flood warning.
G. Watercourse alterations or relocations (channel changes and modifications) must be
designed to maintain the flood carrying capacity within the altered or relocated portion.
In addition, such alterations or relocations must be approved by the Department of
Natural Resources.
H. Any fill allowed in the floodway must be shown to have some beneficial purpose and
shall be limited to the minimum amount necessary.
I. Pipeline river or stream crossings shall be buried in the streambed and banks or
otherwise sufficiently protected to prevent rupture due to channel degradation and
meandering or due to the action of flood flows.
160.06 VARIANCE PROCEDURES.
1. The Council may authorize upon request in specific cases such variances from the terms of this
chapter that will not be contrary to the public interest where, owing to special conditions, a
literal enforcement of the provisions of this Ordinance will result in unnecessary hardship.
Variances granted must meet the following applicable standards.
A. Variances shall only be granted upon: (i) a showing of good and sufficient cause, (ii) a
determination that failure to grant the variance would result in exceptional hardship to the
applicant, and (iii) a determination that the granting of the variance will not result in
increased flood heights, additional threats to public safety, extraordinary public expense,
create nuisances, cause fraud on or victimization of the public or conflict with existing
local codes or ordinances.
B. Variances shall not be issued within any designated floodway if any increase in flood
levels during the base flood would result. Consideration of the effects of any development
on flood levels shall be based upon the assumption that an equal degree of development
would be allowed for similarly situated lands.
C. Variances shall only be granted upon a determination that the variance is the minimum
necessary, considering the flood hazard, to afford relief.
D. In cases where the variance involves a lower level of flood protection for structures than
what is ordinarily required by this chapter, the applicant shall be notified in writing over
the signature of the Administrator that: (i) the issuance of a variance will result in
cty_hr_d_160.doc - 14 - 4/15/2021
Sources
- revize: Attachment (r8tH6mfN5lJMEm4ci1rr8ZEYkapsgp.pdf) — where it was found ↗ first seen Oct 12, 2026
- sharepoint (I-1 - Staff Report - Resolution 2025-075 - Setting PH - Floodplain Ordinance Amendment.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: Resolution 2025-075 – Resolution Setting as Public Hearing to Consider Adoption of an...
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.