resolution · I-1
Resolution 2025-075 – Resolution Setting as Public Hearing to Consider Adoption of an Updated Floodplain Management Ordinance for the City of Tiffin, Iowa.
Page 18 of 20
Text from the PDF text layer; check the PDF for anything that matters. increased premium rates for flood insurance up to amounts as high as $25 for $100 of
insurance coverage and (ii) such construction increases risks to life and property.
E. All variances granted shall have the concurrence or approval of the Department of Natural
Resources.
2. Factors Upon Which the Decision of the Council Shall be Based - In passing upon applications
for Variances, the Council shall consider all relevant factors specified in other sections of this
Ordinance and:
A. The danger to life and property due to increased flood heights or velocities caused by
encroachments.
B. The danger that materials may be swept on to other land or downstream to the injury of
others.
C. The proposed water supply and sanitation systems and the ability of these systems to
prevent disease, contamination and unsanitary conditions.
D. The susceptibility of the proposed facility and its contents to flood damage and the effect
of such damage on the individual owner.
E. The importance of the services provided by the proposed facility to the City.
F. The requirements of the facility for a floodplain location.
G. The availability of alternative locations not subject to flooding for the proposed use.
H. The compatibility of the proposed use with existing development and development
anticipated in the foreseeable future.
I. The relationship of the proposed use to the comprehensive plan and floodplain
management program for the area.
J. The safety of access to the property in times of flood for ordinary and emergency vehicles.
K. The expected heights, velocity, duration, rate of rise and sediment transport of the flood
water expected at the site.
L. The cost of providing governmental services during and after flood conditions, including
maintenance and repair of public utilities (sewer, gas, electrical and water systems),
facilities, streets and bridges.
M. Such other factors which are relevant to the purpose of this chapter.
3. Conditions Attached to Variances - Upon consideration of the factors listed above, the Council
may attach such conditions to the granting of variances as it deems necessary to further the
purpose of this chapter. Such conditions may include, but not necessarily be limited to:
cty_hr_d_160.doc - 15 - 4/15/2021
Sources
- revize: Attachment (r8tH6mfN5lJMEm4ci1rr8ZEYkapsgp.pdf) — where it was found ↗ first seen Oct 12, 2026
- sharepoint (I-1 - Staff Report - Resolution 2025-075 - Setting PH - Floodplain Ordinance Amendment.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: Resolution 2025-075 – Resolution Setting as Public Hearing to Consider Adoption of an...
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.