resolution · I-1
Resolution 2025-075 – Resolution Setting as Public Hearing to Consider Adoption of an Updated Floodplain Management Ordinance for the City of Tiffin, Iowa.
Page 16 of 20
Text from the PDF text layer; check the PDF for anything that matters. system and is attached to the site only by quick disconnect type utilities and
security devices and has no permanently attached additions.
Recreational vehicles that are located on the site for more than 180 consecutive days or are
not ready for highway use must satisfy requirements of Section 160.05(E) regarding
anchoring and elevation of factory-built homes.
M. Pipeline Crossings. Pipeline river and stream crossings shall be buried in the
streambed and banks, or otherwise sufficiently protected to prevent rupture due to channel
degradation and meandering.
N. Maximum Damage Potential Development. All new or substantially improved
maximum damage potential development shall have the lowest floor (including basement)
elevated a minimum of one foot above the elevation of the 500-year flood, or together with
attendant utility and sanitary systems, be floodproofed to such a level. When floodproofing
is utilized, a professional engineer registered in the State of Iowa shall certify that the
floodproofing methods used are adequate to withstand the flood depths, pressures,
velocities, impact and uplift forces and other factors associated with the two-tenths percent
annual chance flood; and that the structure, below the two-tenths percent annual chance
flood elevation is watertight with walls substantially impermeable to the passage of water.
A record of the certification indicating the specific elevation (in relation to North American
Vertical Datum 1988) to which any structures are floodproofed shall be maintained by the
Administrator. Where two-tenths percent chance flood elevation data has not been
provided in the Flood Insurance Study, the Iowa Department of Natural Resources shall be
contacted to compute such data. The applicant will be responsible for providing the
Department of Natural Resources with sufficient technical information to make such
determinations.
2. Special Floodway Provisions. In addition to the General Floodplain Standards, development
within the floodway must meet the following applicable standards. The floodway is that portion
of the floodplain which must be protected from developmental encroachment to allow the free
flow of flood waters. Where floodway data has been provided in the Flood Insurance Study,
such data shall be used to define the floodway. Where no floodway data has been provided, the
Department of Natural Resources shall be contacted to provide a floodway delineation. The
applicant will be responsible for providing the Department of Natural Resources with sufficient
technical information to make such determination.
A. No development shall be permitted in the floodway that would result in any increase
in the base flood elevation. Consideration of the effects of any development on flood
levels shall be based upon the assumption that an equal degree of development would
be allowed for similarly situated lands.
B. All development within the floodway shall:
(1) Be consistent with the need to minimize flood damage.
(2) Use construction methods and practices that will minimize flood damage.
(3) Use construction materials and utility equipment that are resistant to flood damage.
cty_hr_d_160.doc - 13 - 4/15/2021
Sources
- revize: Attachment (r8tH6mfN5lJMEm4ci1rr8ZEYkapsgp.pdf) — where it was found ↗ first seen Oct 12, 2026
- sharepoint (I-1 - Staff Report - Resolution 2025-075 - Setting PH - Floodplain Ordinance Amendment.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: Resolution 2025-075 – Resolution Setting as Public Hearing to Consider Adoption of an...
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.