resolution · I-1

Resolution 2025-075 – Resolution Setting as Public Hearing to Consider Adoption of an Updated Floodplain Management Ordinance for the City of Tiffin, Iowa.

Open the PDF

Page 16 of 20

Text from the PDF text layer; check the PDF for anything that matters.
system and is attached to the site only by quick disconnect type utilities and security devices and has no permanently attached additions. Recreational vehicles that are located on the site for more than 180 consecutive days or are not ready for highway use must satisfy requirements of Section 160.05(E) regarding anchoring and elevation of factory-built homes. M. Pipeline Crossings. Pipeline river and stream crossings shall be buried in the streambed and banks, or otherwise sufficiently protected to prevent rupture due to channel degradation and meandering. N. Maximum Damage Potential Development. All new or substantially improved maximum damage potential development shall have the lowest floor (including basement) elevated a minimum of one foot above the elevation of the 500-year flood, or together with attendant utility and sanitary systems, be floodproofed to such a level. When floodproofing is utilized, a professional engineer registered in the State of Iowa shall certify that the floodproofing methods used are adequate to withstand the flood depths, pressures, velocities, impact and uplift forces and other factors associated with the two-tenths percent annual chance flood; and that the structure, below the two-tenths percent annual chance flood elevation is watertight with walls substantially impermeable to the passage of water. A record of the certification indicating the specific elevation (in relation to North American Vertical Datum 1988) to which any structures are floodproofed shall be maintained by the Administrator. Where two-tenths percent chance flood elevation data has not been provided in the Flood Insurance Study, the Iowa Department of Natural Resources shall be contacted to compute such data. The applicant will be responsible for providing the Department of Natural Resources with sufficient technical information to make such determinations. 2. Special Floodway Provisions. In addition to the General Floodplain Standards, development within the floodway must meet the following applicable standards. The floodway is that portion of the floodplain which must be protected from developmental encroachment to allow the free flow of flood waters. Where floodway data has been provided in the Flood Insurance Study, such data shall be used to define the floodway. Where no floodway data has been provided, the Department of Natural Resources shall be contacted to provide a floodway delineation. The applicant will be responsible for providing the Department of Natural Resources with sufficient technical information to make such determination. A. No development shall be permitted in the floodway that would result in any increase in the base flood elevation. Consideration of the effects of any development on flood levels shall be based upon the assumption that an equal degree of development would be allowed for similarly situated lands. B. All development within the floodway shall: (1) Be consistent with the need to minimize flood damage. (2) Use construction methods and practices that will minimize flood damage. (3) Use construction materials and utility equipment that are resistant to flood damage. cty_hr_d_160.doc - 13 - 4/15/2021

Sources

  • revize: Attachment (r8tH6mfN5lJMEm4ci1rr8ZEYkapsgp.pdf) — where it was found ↗ first seen Oct 12, 2026
  • sharepoint (I-1 - Staff Report - Resolution 2025-075 - Setting PH - Floodplain Ordinance Amendment.pdf) — where it was found ↗ first seen Oct 12, 2026

Attached to agenda item: Resolution 2025-075 – Resolution Setting as Public Hearing to Consider Adoption of an...

This document's details as JSON

Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.