packet
Packet: Tiffin Regular City Council Meeting (12/02/2025)
Document 768
Dated December 2, 2025City Council — regular meeting, December 2, 2025 160 pages
Ord. 2025-522, Ord. 2025-523, Res. 2025-089, Res. 2025-090, Res. 2025-091
Page 152 of 160
Text read by the vision model; check the PDF for anything that matters.<table>
<tr>
<th>Application No.: 4R</th>
<th>Application Period:</th>
<th>From</th>
<th>10/24/25</th>
<th>to</th>
<th>11/30/25</th>
<th>Application Date:</th>
<th>11/21/25</th>
</tr>
<tr>
<td>56</td>
<td>Grating - Labor</td>
<td>$2,777.25</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>0%</td>
<td>2,777.25</td>
</tr>
<tr>
<td>57</td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>-</td>
</tr>
<tr>
<td>58</td>
<td><b>Wood, Plastics and Composites</b></td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>-</td>
</tr>
<tr>
<td>59</td>
<td><b>Structure 10 - Existing Building</b></td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>-</td>
</tr>
<tr>
<td>60</td>
<td>Walls, Headers, Mezz Hardware - M</td>
<td>$15,568.75</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>15,568.75</td>
</tr>
<tr>
<td>61</td>
<td>Walls, Headers, Mezz Hardware - L</td>
<td>$45,669.32</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>45,669.32</td>
</tr>
<tr>
<td>62</td>
<td>Trusses - Materials</td>
<td>$15,887.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>15,887.00</td>
</tr>
<tr>
<td>63</td>
<td>Trusses - Labor</td>
<td>$55,229.36</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>55,229.36</td>
</tr>
<tr>
<td>64</td>
<td><b>Structure 20 - RO Building</b></td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>-</td>
</tr>
<tr>
<td>65</td>
<td>Walls, Headers, Mezz Hardware - M</td>
<td>$25,568.65</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>25,568.65</td>
</tr>
<tr>
<td>66</td>
<td>Walls, Headers, Mezz Hardware - L</td>
<td>$55,565.78</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>55,565.78</td>
</tr>
<tr>
<td>67</td>
<td>Trusses - Materials</td>
<td>$33,966.50</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>33,966.50</td>
</tr>
<tr>
<td>68</td>
<td>Trusses - Labor</td>
<td>$79,156.72</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>79,156.72</td>
</tr>
<tr>
<td>69</td>
<td>FRP Grating - Materials</td>
<td>$32,000.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>32,000.00</td>
</tr>
<tr>
<td>70</td>
<td>FRP Grating - Labor</td>
<td>$17,836.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>17,836.00</td>
</tr>
<tr>
<td>71</td>
<td><b>Structural 30 - Clearwell</b></td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>-</td>
</tr>
<tr>
<td>72</td>
<td>Walls, Headers, Hardware - Materials</td>
<td>$3,692.40</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>3,692.40</td>
</tr>
<tr>
<td>73</td>
<td>Walls, Headers, Hardware - Labor</td>
<td>$18,569.52</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>18,569.52</td>
</tr>
<tr>
<td>74</td>
<td>Trusses - Materials</td>
<td>$5,858.50</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>5,858.50</td>
</tr>
<tr>
<td>75</td>
<td>Trusses - Labor</td>
<td>$16,979.50</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>16,979.50</td>
</tr>
<tr>
<td>76</td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>-</td>
</tr>
<tr>
<td>77</td>
<td><b>Thermal & Moisture Protection</b></td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>-</td>
</tr>
<tr>
<td>78</td>
<td>Blown Insulation</td>
<td>$20,001.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>20,001.00</td>
</tr>
<tr>
<td>79</td>
<td><b>Structure 10 - Existing Building</b></td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>-</td>
</tr>
<tr>
<td>80</td>
<td>Metal Roofing - Materials</td>
<td>$11,566.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>11,566.00</td>
</tr>
<tr>
<td>81</td>
<td>Metal Roofing - Labor</td>
<td>$6,541.50</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>6,541.50</td>
</tr>
<tr>
<td>82</td>
<td>Preformed Metal Soffit - Materials</td>
<td>$1,586.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>1,586.00</td>
</tr>
<tr>
<td>83</td>
<td>Preformed Metal Soffit - Labor</td>
<td>$1,852.50</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>1,852.50</td>
</tr>
<tr>
<td>84</td>
<td>Gutters & Downspouts - Materials</td>
<td>$2,500.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>2,500.00</td>
</tr>
<tr>
<td>85</td>
<td>Gutters & Downspouts - Labor</td>
<td>$3,215.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>3,215.00</td>
</tr>
<tr>
<td>86</td>
<td><b>Structure 20 - RO Building</b></td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
<td></td>
<td>-</td>
</tr>
</table>
Sheets in this document
- p. 22 Concept Design · Streamline Architects · Tiffin Events Center
- p. 23 Concept Design · Streamline Architects · Tiffin Events Center
- p. 24 Concept Design · Streamline Architects · Tiffin Events Center
- p. 25 Concept Design · Streamline Architects · Tiffin Events Center
- p. 26 Concept Design · Streamline Architects · Tiffin Events Center
- p. 27 Concept Design · Streamline Architects · Tiffin Events Center
- p. 28 Concept Design · Streamline Architects · Tiffin Events Center
- p. 29 Concept Design · Gallant Design
- p. 30 Concept Design | Tiffin Events Center · Streamline Architects
- p. 31 Concept Design · Streamline Architects · Tiffin Events Center
- p. 32 Concept Design · Streamline Architects · Tiffin Events Center
- p. 33 Concept Design · Gallant Design
- p. 34 Concept Design · Streamline Architects · Tiffin Events Center
- p. 35 Floor Plan
- p. 36 C120 · General Notes and Details · MMS Consultants
- p. 45 A.200 · South Elevation
- p. 46 Floor Plan
- p. 47 Floor Plan · Basement
- p. 48 A.200 · South Elevation
- p. 49 A.201 · North Elevation
- p. 50 Floor Plan · Level 2
- p. 51 A.200 · Building Elevations
- p. 52 Floor Plans
- p. 53 C200 · Site Layout · Iowa DOT
- p. 54 C300 · Site Utilities Plan
- p. 55 C301 · Site Utilities Plan
- p. 56 Revised Site P
- p. 57 Preliminary Plat
- p. 58 2 · Road Typical Section
- p. 59 3 · Revised Phasing & Utility Layout
- p. 71 Concept Design · Streamline Architects · Tiffin Events Center
- p. 72 Concept Design · Streamline Architects · Tiffin Events Center
- p. 73 Concept Design · Streamline Architects · Tiffin Events Center
- p. 74 Concept Design · Streamline Architects · Tiffin Events Center
- p. 75 Concept Design · Streamline Architects · Tiffin Events Center
- p. 76 Concept Design · Streamline Architects · Tiffin Events Center
- p. 77 Concept Design · Streamline Architects · Tiffin Events Center
- p. 78 Concept Design · Gallant Design
- p. 79 Concept Design | Tiffin Events Center · Streamline Architects
- p. 80 Concept Design · Streamline Architects · Tiffin Events Center
- p. 81 Concept Design · Streamline Architects · Tiffin Events Center
- p. 82 Concept Design · Gallant Design
- p. 83 Concept Design · Streamline Architects · Tiffin Events Center
- p. 84 Floor Plan
- p. 85 C120 · General Notes and Details · MMS Consultants
- p. 94 A.200 · South Elevation
- p. 95 Floor Plan
- p. 96 Floor Plan · Basement
- p. 97 A.200 · South Elevation
- p. 98 A.201 · North Elevation
- p. 99 Floor Plans
- p. 100 A.200 · Building Elevations
- p. 101 Floor Plans
- p. 102 C200 · Site Layout · Iowa DOT
- p. 103 C300 · Site Utilities Plan
- p. 104 C301 · Site Utilities South
- p. 105 Revised Site Plan
- p. 106 Preliminary Plat
- p. 107 2 · Road Typical Section
- p. 108 3 · Address City Comments Revised Phasing & Utility Layout
Sources
- revize: Agenda packet (packet_2025-12-02_4b734c31-25e7-4dd6-9fb9-361df96c5fac.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.