Packet: Tiffin Regular City Council Meeting (12/02/2025)

Open the PDF Searchable PDF tesseract layer

Page 152 of 160

Text read by the vision model; check the PDF for anything that matters.
<table> <tr> <th>Application No.: 4R</th> <th>Application Period:</th> <th>From</th> <th>10/24/25</th> <th>to</th> <th>11/30/25</th> <th>Application Date:</th> <th>11/21/25</th> </tr> <tr> <td>56</td> <td>Grating - Labor</td> <td>$2,777.25</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>2,777.25</td> </tr> <tr> <td>57</td> <td></td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>-</td> </tr> <tr> <td>58</td> <td><b>Wood, Plastics and Composites</b></td> <td></td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>-</td> </tr> <tr> <td>59</td> <td><b>Structure 10 - Existing Building</b></td> <td></td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>-</td> </tr> <tr> <td>60</td> <td>Walls, Headers, Mezz Hardware - M</td> <td>$15,568.75</td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>15,568.75</td> </tr> <tr> <td>61</td> <td>Walls, Headers, Mezz Hardware - L</td> <td>$45,669.32</td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>45,669.32</td> </tr> <tr> <td>62</td> <td>Trusses - Materials</td> <td>$15,887.00</td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>15,887.00</td> </tr> <tr> <td>63</td> <td>Trusses - Labor</td> <td>$55,229.36</td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>55,229.36</td> </tr> <tr> <td>64</td> <td><b>Structure 20 - RO Building</b></td> <td></td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>-</td> </tr> <tr> <td>65</td> <td>Walls, Headers, Mezz Hardware - M</td> <td>$25,568.65</td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>25,568.65</td> </tr> <tr> <td>66</td> <td>Walls, Headers, Mezz Hardware - L</td> <td>$55,565.78</td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>55,565.78</td> </tr> <tr> <td>67</td> <td>Trusses - Materials</td> <td>$33,966.50</td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>33,966.50</td> </tr> <tr> <td>68</td> <td>Trusses - Labor</td> <td>$79,156.72</td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>79,156.72</td> </tr> <tr> <td>69</td> <td>FRP Grating - Materials</td> <td>$32,000.00</td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>32,000.00</td> </tr> <tr> <td>70</td> <td>FRP Grating - Labor</td> <td>$17,836.00</td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>17,836.00</td> </tr> <tr> <td>71</td> <td><b>Structural 30 - Clearwell</b></td> <td></td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>-</td> </tr> <tr> <td>72</td> <td>Walls, Headers, Hardware - Materials</td> <td>$3,692.40</td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>3,692.40</td> </tr> <tr> <td>73</td> <td>Walls, Headers, Hardware - Labor</td> <td>$18,569.52</td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>18,569.52</td> </tr> <tr> <td>74</td> <td>Trusses - Materials</td> <td>$5,858.50</td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>5,858.50</td> </tr> <tr> <td>75</td> <td>Trusses - Labor</td> <td>$16,979.50</td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>16,979.50</td> </tr> <tr> <td>76</td> <td></td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>-</td> </tr> <tr> <td>77</td> <td><b>Thermal & Moisture Protection</b></td> <td></td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>-</td> </tr> <tr> <td>78</td> <td>Blown Insulation</td> <td>$20,001.00</td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>20,001.00</td> </tr> <tr> <td>79</td> <td><b>Structure 10 - Existing Building</b></td> <td></td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>-</td> </tr> <tr> <td>80</td> <td>Metal Roofing - Materials</td> <td>$11,566.00</td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>11,566.00</td> </tr> <tr> <td>81</td> <td>Metal Roofing - Labor</td> <td>$6,541.50</td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>6,541.50</td> </tr> <tr> <td>82</td> <td>Preformed Metal Soffit - Materials</td> <td>$1,586.00</td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>1,586.00</td> </tr> <tr> <td>83</td> <td>Preformed Metal Soffit - Labor</td> <td>$1,852.50</td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>1,852.50</td> </tr> <tr> <td>84</td> <td>Gutters & Downspouts - Materials</td> <td>$2,500.00</td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>2,500.00</td> </tr> <tr> <td>85</td> <td>Gutters & Downspouts - Labor</td> <td>$3,215.00</td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>3,215.00</td> </tr> <tr> <td>86</td> <td><b>Structure 20 - RO Building</b></td> <td></td> <td>-</td> <td>-</td> <td>-</td> <td></td> <td>-</td> </tr> </table>

Sheets in this document

  • p. 22 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 23 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 24 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 25 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 26 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 27 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 28 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 29 Concept Design · Gallant Design
  • p. 30 Concept Design | Tiffin Events Center · Streamline Architects
  • p. 31 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 32 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 33 Concept Design · Gallant Design
  • p. 34 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 35 Floor Plan
  • p. 36 C120 · General Notes and Details · MMS Consultants
  • p. 45 A.200 · South Elevation
  • p. 46 Floor Plan
  • p. 47 Floor Plan · Basement
  • p. 48 A.200 · South Elevation
  • p. 49 A.201 · North Elevation
  • p. 50 Floor Plan · Level 2
  • p. 51 A.200 · Building Elevations
  • p. 52 Floor Plans
  • p. 53 C200 · Site Layout · Iowa DOT
  • p. 54 C300 · Site Utilities Plan
  • p. 55 C301 · Site Utilities Plan
  • p. 56 Revised Site P
  • p. 57 Preliminary Plat
  • p. 58 2 · Road Typical Section
  • p. 59 3 · Revised Phasing & Utility Layout
  • p. 71 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 72 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 73 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 74 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 75 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 76 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 77 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 78 Concept Design · Gallant Design
  • p. 79 Concept Design | Tiffin Events Center · Streamline Architects
  • p. 80 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 81 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 82 Concept Design · Gallant Design
  • p. 83 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 84 Floor Plan
  • p. 85 C120 · General Notes and Details · MMS Consultants
  • p. 94 A.200 · South Elevation
  • p. 95 Floor Plan
  • p. 96 Floor Plan · Basement
  • p. 97 A.200 · South Elevation
  • p. 98 A.201 · North Elevation
  • p. 99 Floor Plans
  • p. 100 A.200 · Building Elevations
  • p. 101 Floor Plans
  • p. 102 C200 · Site Layout · Iowa DOT
  • p. 103 C300 · Site Utilities Plan
  • p. 104 C301 · Site Utilities South
  • p. 105 Revised Site Plan
  • p. 106 Preliminary Plat
  • p. 107 2 · Road Typical Section
  • p. 108 3 · Address City Comments Revised Phasing & Utility Layout

Sources

  • revize: Agenda packet (packet_2025-12-02_4b734c31-25e7-4dd6-9fb9-361df96c5fac.pdf) — where it was found ↗ first seen Oct 12, 2026