Text read by the vision model; check the PDF for anything that matters.<table>
<tr>
<th>Application No.: 4R</th>
<th>Application Period:</th>
<th>From 10/24/25</th>
<th>To 11/30/25</th>
<th>Application Date: 11/21/25</th>
</tr>
<tr>
<td>87</td>
<td>Metal Roofing - Materials</td>
<td>$35,256.00</td>
<td>-</td>
<td>-</td>
<td>35,256.00</td>
</tr>
<tr>
<td>88</td>
<td>Metal Roofing - Labor</td>
<td>$40,587.00</td>
<td>-</td>
<td>-</td>
<td>40,587.00</td>
</tr>
<tr>
<td>89</td>
<td>Preformed Metal Soffit - Materials</td>
<td>$5,877.00</td>
<td>-</td>
<td>-</td>
<td>5,877.00</td>
</tr>
<tr>
<td>90</td>
<td>Preformed Metal Soffit - Labor</td>
<td>$9,992.12</td>
<td>-</td>
<td>-</td>
<td>9,992.12</td>
</tr>
<tr>
<td>91</td>
<td>Gutters & Downspouts - Materials</td>
<td>$5,600.00</td>
<td>-</td>
<td>-</td>
<td>5,600.00</td>
</tr>
<tr>
<td>92</td>
<td>Gutters & Downspouts - Labor</td>
<td>$8,544.32</td>
<td>-</td>
<td>-</td>
<td>8,544.32</td>
</tr>
<tr>
<td>93</td>
<td><b>Structure 30 - Clearwell</b></td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
</tr>
<tr>
<td>94</td>
<td>Metal Roofing - Materials</td>
<td>$9,442.00</td>
<td>-</td>
<td>-</td>
<td>9,442.00</td>
</tr>
<tr>
<td>95</td>
<td>Metal Roofing - Labor</td>
<td>$11,566.68</td>
<td>-</td>
<td>-</td>
<td>11,566.68</td>
</tr>
<tr>
<td>96</td>
<td>Preformed Metal Soffit - Materials</td>
<td>$3,655.00</td>
<td>-</td>
<td>-</td>
<td>3,655.00</td>
</tr>
<tr>
<td>97</td>
<td>Preformed Metal Soffit - Labor</td>
<td>$6,552.46</td>
<td>-</td>
<td>-</td>
<td>6,552.46</td>
</tr>
<tr>
<td>98</td>
<td>Gutters & Downspouts - Materials</td>
<td>$2,651.00</td>
<td>-</td>
<td>-</td>
<td>2,651.00</td>
</tr>
<tr>
<td>99</td>
<td>Gutters & Downspouts - Labor</td>
<td>$3,215.42</td>
<td>-</td>
<td>-</td>
<td>3,215.42</td>
</tr>
<tr>
<td>100</td>
<td>Roof Hatches - Materials</td>
<td>$6,200.00</td>
<td>-</td>
<td>-</td>
<td>6,200.00</td>
</tr>
<tr>
<td>101</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
</tr>
<tr>
<td>102</td>
<td><b>Openings</b></td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
</tr>
<tr>
<td>103</td>
<td>HM Frames, Doors & Hardware-Materials</td>
<td>$53,528.00</td>
<td>-</td>
<td>-</td>
<td>53,528.00</td>
</tr>
<tr>
<td>104</td>
<td>HM Frames, Doors & Hardware-Labor</td>
<td>$6,890.00</td>
<td>-</td>
<td>-</td>
<td>6,890.00</td>
</tr>
<tr>
<td>105</td>
<td>Vault Doors - Materials</td>
<td>$49,611.00</td>
<td>21,050.00</td>
<td>21,050.00</td>
<td>28,561.00</td>
</tr>
<tr>
<td>106</td>
<td>Vault Doors - Labor</td>
<td>$3,110.00</td>
<td>-</td>
<td>-</td>
<td>3,110.00</td>
</tr>
<tr>
<td>107</td>
<td>Overhead Door</td>
<td>$43,790.00</td>
<td>-</td>
<td>-</td>
<td>43,790.00</td>
</tr>
<tr>
<td>108</td>
<td>Aluminum Windows</td>
<td>$8,996.00</td>
<td>-</td>
<td>-</td>
<td>8,996.00</td>
</tr>
<tr>
<td>109</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
</tr>
<tr>
<td>110</td>
<td><b>Finishes</b></td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
</tr>
<tr>
<td>111</td>
<td>Resilient Base</td>
<td>$2,500.00</td>
<td>-</td>
<td>-</td>
<td>2,500.00</td>
</tr>
<tr>
<td>112</td>
<td>Epoxy Flooring</td>
<td>$67,408.00</td>
<td>-</td>
<td>-</td>
<td>67,408.00</td>
</tr>
<tr>
<td>113</td>
<td>High Performance Coatings</td>
<td>$68,724.00</td>
<td>-</td>
<td>-</td>
<td>68,724.00</td>
</tr>
<tr>
<td>114</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
</tr>
<tr>
<td>115</td>
<td><b>Specialties</b></td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
</tr>
<tr>
<td>116</td>
<td>Signage</td>
<td>$450.00</td>
<td>-</td>
<td>-</td>
<td>450.00</td>
</tr>
<tr>
<td>117</td>
<td>Metal Lockers</td>
<td>$7,100.00</td>
<td>-</td>
<td>-</td>
<td>7,100.00</td>
</tr>
</table>
Sheets in this document
- p. 22 Concept Design · Streamline Architects · Tiffin Events Center
- p. 23 Concept Design · Streamline Architects · Tiffin Events Center
- p. 24 Concept Design · Streamline Architects · Tiffin Events Center
- p. 25 Concept Design · Streamline Architects · Tiffin Events Center
- p. 26 Concept Design · Streamline Architects · Tiffin Events Center
- p. 27 Concept Design · Streamline Architects · Tiffin Events Center
- p. 28 Concept Design · Streamline Architects · Tiffin Events Center
- p. 29 Concept Design · Gallant Design
- p. 30 Concept Design | Tiffin Events Center · Streamline Architects
- p. 31 Concept Design · Streamline Architects · Tiffin Events Center
- p. 32 Concept Design · Streamline Architects · Tiffin Events Center
- p. 33 Concept Design · Gallant Design
- p. 34 Concept Design · Streamline Architects · Tiffin Events Center
- p. 35 Floor Plan
- p. 36 C120 · General Notes and Details · MMS Consultants
- p. 45 A.200 · South Elevation
- p. 46 Floor Plan
- p. 47 Floor Plan · Basement
- p. 48 A.200 · South Elevation
- p. 49 A.201 · North Elevation
- p. 50 Floor Plan · Level 2
- p. 51 A.200 · Building Elevations
- p. 52 Floor Plans
- p. 53 C200 · Site Layout · Iowa DOT
- p. 54 C300 · Site Utilities Plan
- p. 55 C301 · Site Utilities Plan
- p. 56 Revised Site P
- p. 57 Preliminary Plat
- p. 58 2 · Road Typical Section
- p. 59 3 · Revised Phasing & Utility Layout
- p. 71 Concept Design · Streamline Architects · Tiffin Events Center
- p. 72 Concept Design · Streamline Architects · Tiffin Events Center
- p. 73 Concept Design · Streamline Architects · Tiffin Events Center
- p. 74 Concept Design · Streamline Architects · Tiffin Events Center
- p. 75 Concept Design · Streamline Architects · Tiffin Events Center
- p. 76 Concept Design · Streamline Architects · Tiffin Events Center
- p. 77 Concept Design · Streamline Architects · Tiffin Events Center
- p. 78 Concept Design · Gallant Design
- p. 79 Concept Design | Tiffin Events Center · Streamline Architects
- p. 80 Concept Design · Streamline Architects · Tiffin Events Center
- p. 81 Concept Design · Streamline Architects · Tiffin Events Center
- p. 82 Concept Design · Gallant Design
- p. 83 Concept Design · Streamline Architects · Tiffin Events Center
- p. 84 Floor Plan
- p. 85 C120 · General Notes and Details · MMS Consultants
- p. 94 A.200 · South Elevation
- p. 95 Floor Plan
- p. 96 Floor Plan · Basement
- p. 97 A.200 · South Elevation
- p. 98 A.201 · North Elevation
- p. 99 Floor Plans
- p. 100 A.200 · Building Elevations
- p. 101 Floor Plans
- p. 102 C200 · Site Layout · Iowa DOT
- p. 103 C300 · Site Utilities Plan
- p. 104 C301 · Site Utilities South
- p. 105 Revised Site Plan
- p. 106 Preliminary Plat
- p. 107 2 · Road Typical Section
- p. 108 3 · Address City Comments Revised Phasing & Utility Layout
Sources
- revize: Agenda packet (packet_2025-12-02_4b734c31-25e7-4dd6-9fb9-361df96c5fac.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.