<table> <tr> <th>Application No.: 4R</th> <th>Application Period:</th> <th>From 10/24/25</th> <th>To 11/30/25</th> <th>Application Date: 11/21/25</th> </tr> <tr> <td>87</td> <td>Metal Roofing - Materials</td> <td>$35,256.00</td> <td>-</td> <td>-</td> <td>35,256.00</td> </tr> <tr> <td>88</td> <td>Metal Roofing - Labor</td> <td>$40,587.00</td> <td>-</td> <td>-</td> <td>40,587.00</td> </tr> <tr> <td>89</td> <td>Preformed Metal Soffit - Materials</td> <td>$5,877.00</td> <td>-</td> <td>-</td> <td>5,877.00</td> </tr> <tr> <td>90</td> <td>Preformed Metal Soffit - Labor</td> <td>$9,992.12</td> <td>-</td> <td>-</td> <td>9,992.12</td> </tr> <tr> <td>91</td> <td>Gutters & Downspouts - Materials</td> <td>$5,600.00</td> <td>-</td> <td>-</td> <td>5,600.00</td> </tr> <tr> <td>92</td> <td>Gutters & Downspouts - Labor</td> <td>$8,544.32</td> <td>-</td> <td>-</td> <td>8,544.32</td> </tr> <tr> <td>93</td> <td><b>Structure 30 - Clearwell</b></td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>94</td> <td>Metal Roofing - Materials</td> <td>$9,442.00</td> <td>-</td> <td>-</td> <td>9,442.00</td> </tr> <tr> <td>95</td> <td>Metal Roofing - Labor</td> <td>$11,566.68</td> <td>-</td> <td>-</td> <td>11,566.68</td> </tr> <tr> <td>96</td> <td>Preformed Metal Soffit - Materials</td> <td>$3,655.00</td> <td>-</td> <td>-</td> <td>3,655.00</td> </tr> <tr> <td>97</td> <td>Preformed Metal Soffit - Labor</td> <td>$6,552.46</td> <td>-</td> <td>-</td> <td>6,552.46</td> </tr> <tr> <td>98</td> <td>Gutters & Downspouts - Materials</td> <td>$2,651.00</td> <td>-</td> <td>-</td> <td>2,651.00</td> </tr> <tr> <td>99</td> <td>Gutters & Downspouts - Labor</td> <td>$3,215.42</td> <td>-</td> <td>-</td> <td>3,215.42</td> </tr> <tr> <td>100</td> <td>Roof Hatches - Materials</td> <td>$6,200.00</td> <td>-</td> <td>-</td> <td>6,200.00</td> </tr> <tr> <td>101</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>102</td> <td><b>Openings</b></td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>103</td> <td>HM Frames, Doors & Hardware-Materials</td> <td>$53,528.00</td> <td>-</td> <td>-</td> <td>53,528.00</td> </tr> <tr> <td>104</td> <td>HM Frames, Doors & Hardware-Labor</td> <td>$6,890.00</td> <td>-</td> <td>-</td> <td>6,890.00</td> </tr> <tr> <td>105</td> <td>Vault Doors - Materials</td> <td>$49,611.00</td> <td>21,050.00</td> <td>21,050.00</td> <td>28,561.00</td> </tr> <tr> <td>106</td> <td>Vault Doors - Labor</td> <td>$3,110.00</td> <td>-</td> <td>-</td> <td>3,110.00</td> </tr> <tr> <td>107</td> <td>Overhead Door</td> <td>$43,790.00</td> <td>-</td> <td>-</td> <td>43,790.00</td> </tr> <tr> <td>108</td> <td>Aluminum Windows</td> <td>$8,996.00</td> <td>-</td> <td>-</td> <td>8,996.00</td> </tr> <tr> <td>109</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>110</td> <td><b>Finishes</b></td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>111</td> <td>Resilient Base</td> <td>$2,500.00</td> <td>-</td> <td>-</td> <td>2,500.00</td> </tr> <tr> <td>112</td> <td>Epoxy Flooring</td> <td>$67,408.00</td> <td>-</td> <td>-</td> <td>67,408.00</td> </tr> <tr> <td>113</td> <td>High Performance Coatings</td> <td>$68,724.00</td> <td>-</td> <td>-</td> <td>68,724.00</td> </tr> <tr> <td>114</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>115</td> <td><b>Specialties</b></td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>116</td> <td>Signage</td> <td>$450.00</td> <td>-</td> <td>-</td> <td>450.00</td> </tr> <tr> <td>117</td> <td>Metal Lockers</td> <td>$7,100.00</td> <td>-</td> <td>-</td> <td>7,100.00</td> </tr> </table>

Sheets in this document

  • p. 22 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 23 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 24 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 25 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 26 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 27 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 28 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 29 Concept Design · Gallant Design
  • p. 30 Concept Design | Tiffin Events Center · Streamline Architects
  • p. 31 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 32 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 33 Concept Design · Gallant Design
  • p. 34 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 35 Floor Plan
  • p. 36 C120 · General Notes and Details · MMS Consultants
  • p. 45 A.200 · South Elevation
  • p. 46 Floor Plan
  • p. 47 Floor Plan · Basement
  • p. 48 A.200 · South Elevation
  • p. 49 A.201 · North Elevation
  • p. 50 Floor Plan · Level 2
  • p. 51 A.200 · Building Elevations
  • p. 52 Floor Plans
  • p. 53 C200 · Site Layout · Iowa DOT
  • p. 54 C300 · Site Utilities Plan
  • p. 55 C301 · Site Utilities Plan
  • p. 56 Revised Site P
  • p. 57 Preliminary Plat
  • p. 58 2 · Road Typical Section
  • p. 59 3 · Revised Phasing & Utility Layout
  • p. 71 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 72 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 73 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 74 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 75 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 76 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 77 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 78 Concept Design · Gallant Design
  • p. 79 Concept Design | Tiffin Events Center · Streamline Architects
  • p. 80 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 81 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 82 Concept Design · Gallant Design
  • p. 83 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 84 Floor Plan
  • p. 85 C120 · General Notes and Details · MMS Consultants
  • p. 94 A.200 · South Elevation
  • p. 95 Floor Plan
  • p. 96 Floor Plan · Basement
  • p. 97 A.200 · South Elevation
  • p. 98 A.201 · North Elevation
  • p. 99 Floor Plans
  • p. 100 A.200 · Building Elevations
  • p. 101 Floor Plans
  • p. 102 C200 · Site Layout · Iowa DOT
  • p. 103 C300 · Site Utilities Plan
  • p. 104 C301 · Site Utilities South
  • p. 105 Revised Site Plan
  • p. 106 Preliminary Plat
  • p. 107 2 · Road Typical Section
  • p. 108 3 · Address City Comments Revised Phasing & Utility Layout

Sources

  • revize: Agenda packet (packet_2025-12-02_4b734c31-25e7-4dd6-9fb9-361df96c5fac.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.