packet

Packet: Tiffin Regular City Council Meeting (12/02/2025)

Open the PDF Searchable PDF tesseract layer

Page 154 of 160

Text read by the vision model; check the PDF for anything that matters.
<table> <tr> <th>Application No.: 4R</th> <th>Application Period:</th> <th>From</th> <th>10/24/25</th> <th>to</th> <th>11/30/25</th> <th>Application Date:</th> <th>11/21/25</th> </tr> <tr> <td>118</td> <td>Metal Storage Systems</td> <td>$6,947.00</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>6,947.00</td> </tr> <tr> <td>119</td> <td>Fire Extinguishers</td> <td>$854.00</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>854.00</td> </tr> <tr> <td>120</td> <td></td> <td></td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>121</td> <td>Furnishings</td> <td></td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>18,810.00</td> </tr> <tr> <td>122</td> <td>Lab Casework</td> <td>$18,810.00</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>123</td> <td></td> <td></td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>124</td> <td>Plumbing</td> <td></td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>125</td> <td>Bldg 10 AG Plumbing Materials</td> <td>$26,000.00</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>26,000.00</td> </tr> <tr> <td>126</td> <td>Bldg 10 AG Plumbing Labor</td> <td>$25,000.00</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>25,000.00</td> </tr> <tr> <td>127</td> <td>Bldg 20 Trench Drains/UG Materials</td> <td>$5,000.00</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>5,000.00</td> </tr> <tr> <td>128</td> <td>Bldg 20 Trench Drains/UG Labor</td> <td>$20,000.00</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>20,000.00</td> </tr> <tr> <td>129</td> <td>Bldg 20 AG Plumbing Materials</td> <td>$15,500.00</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>15,500.00</td> </tr> <tr> <td>130</td> <td>Bldg 20 AG Plumbing Labor</td> <td>$28,000.00</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>28,000.00</td> </tr> <tr> <td>131</td> <td>Bldg 20 AG Plumbing Fixtures</td> <td>$5,000.00</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>5,000.00</td> </tr> <tr> <td>132</td> <td>Bldg 20 AG Plumbing Fixtures Labor</td> <td>$20,000.00</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>20,000.00</td> </tr> <tr> <td>133</td> <td>Insulation</td> <td>$5,000.00</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>5,000.00</td> </tr> <tr> <td>134</td> <td></td> <td></td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>135</td> <td>HVAC/Dehumidifier</td> <td></td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>136</td> <td>EF & Destrat</td> <td>$37,066.00</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>37,066.00</td> </tr> <tr> <td>137</td> <td>EUH</td> <td>$9,492.00</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>9,492.00</td> </tr> <tr> <td>138</td> <td>GUH</td> <td>$3,660.00</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>3,660.00</td> </tr> <tr> <td>139</td> <td>LV & Dampers</td> <td>$15,828.00</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>15,828.00</td> </tr> <tr> <td>140</td> <td>Split & F/CU</td> <td>$20,788.00</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>20,788.00</td> </tr> <tr> <td>141</td> <td>Dehumidifiers</td> <td>$18,166.00</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>18,166.00</td> </tr> <tr> <td>142</td> <td>Duct Material</td> <td>$4,003.00</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>4,003.00</td> </tr> <tr> <td>143</td> <td>HVAC Materials</td> <td>$4,497.00</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>4,497.00</td> </tr> <tr> <td>144</td> <td>HVAC Labor</td> <td>$117,908.00</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>117,908.00</td> </tr> <tr> <td>145</td> <td>Insulation</td> <td>$10,000.00</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>10,000.00</td> </tr> <tr> <td>146</td> <td>Test & Balance</td> <td>$5,750.00</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>5,750.00</td> </tr> <tr> <td>147</td> <td></td> <td></td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>148</td> <td><b>Electrical & Controls</b></td> <td></td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> </tr> </table>

Sheets in this document

  • p. 22 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 23 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 24 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 25 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 26 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 27 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 28 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 29 Concept Design · Gallant Design
  • p. 30 Concept Design | Tiffin Events Center · Streamline Architects
  • p. 31 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 32 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 33 Concept Design · Gallant Design
  • p. 34 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 35 Floor Plan
  • p. 36 C120 · General Notes and Details · MMS Consultants
  • p. 45 A.200 · South Elevation
  • p. 46 Floor Plan
  • p. 47 Floor Plan · Basement
  • p. 48 A.200 · South Elevation
  • p. 49 A.201 · North Elevation
  • p. 50 Floor Plan · Level 2
  • p. 51 A.200 · Building Elevations
  • p. 52 Floor Plans
  • p. 53 C200 · Site Layout · Iowa DOT
  • p. 54 C300 · Site Utilities Plan
  • p. 55 C301 · Site Utilities Plan
  • p. 56 Revised Site P
  • p. 57 Preliminary Plat
  • p. 58 2 · Road Typical Section
  • p. 59 3 · Revised Phasing & Utility Layout
  • p. 71 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 72 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 73 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 74 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 75 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 76 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 77 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 78 Concept Design · Gallant Design
  • p. 79 Concept Design | Tiffin Events Center · Streamline Architects
  • p. 80 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 81 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 82 Concept Design · Gallant Design
  • p. 83 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 84 Floor Plan
  • p. 85 C120 · General Notes and Details · MMS Consultants
  • p. 94 A.200 · South Elevation
  • p. 95 Floor Plan
  • p. 96 Floor Plan · Basement
  • p. 97 A.200 · South Elevation
  • p. 98 A.201 · North Elevation
  • p. 99 Floor Plans
  • p. 100 A.200 · Building Elevations
  • p. 101 Floor Plans
  • p. 102 C200 · Site Layout · Iowa DOT
  • p. 103 C300 · Site Utilities Plan
  • p. 104 C301 · Site Utilities South
  • p. 105 Revised Site Plan
  • p. 106 Preliminary Plat
  • p. 107 2 · Road Typical Section
  • p. 108 3 · Address City Comments Revised Phasing & Utility Layout

Sources

  • revize: Agenda packet (packet_2025-12-02_4b734c31-25e7-4dd6-9fb9-361df96c5fac.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.