packet
Packet: Tiffin Regular City Council Meeting (12/02/2025)
Document 768
Dated December 2, 2025City Council — regular meeting, December 2, 2025 160 pages
Ord. 2025-522, Ord. 2025-523, Res. 2025-089, Res. 2025-090, Res. 2025-091
Page 154 of 160
Text read by the vision model; check the PDF for anything that matters.<table>
<tr>
<th>Application No.: 4R</th>
<th>Application Period:</th>
<th>From</th>
<th>10/24/25</th>
<th>to</th>
<th>11/30/25</th>
<th>Application Date:</th>
<th>11/21/25</th>
</tr>
<tr>
<td>118</td>
<td>Metal Storage Systems</td>
<td>$6,947.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>6,947.00</td>
</tr>
<tr>
<td>119</td>
<td>Fire Extinguishers</td>
<td>$854.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>854.00</td>
</tr>
<tr>
<td>120</td>
<td></td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
</tr>
<tr>
<td>121</td>
<td>Furnishings</td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>18,810.00</td>
</tr>
<tr>
<td>122</td>
<td>Lab Casework</td>
<td>$18,810.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
</tr>
<tr>
<td>123</td>
<td></td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
</tr>
<tr>
<td>124</td>
<td>Plumbing</td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
</tr>
<tr>
<td>125</td>
<td>Bldg 10 AG Plumbing Materials</td>
<td>$26,000.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>26,000.00</td>
</tr>
<tr>
<td>126</td>
<td>Bldg 10 AG Plumbing Labor</td>
<td>$25,000.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>25,000.00</td>
</tr>
<tr>
<td>127</td>
<td>Bldg 20 Trench Drains/UG Materials</td>
<td>$5,000.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>5,000.00</td>
</tr>
<tr>
<td>128</td>
<td>Bldg 20 Trench Drains/UG Labor</td>
<td>$20,000.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>20,000.00</td>
</tr>
<tr>
<td>129</td>
<td>Bldg 20 AG Plumbing Materials</td>
<td>$15,500.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>15,500.00</td>
</tr>
<tr>
<td>130</td>
<td>Bldg 20 AG Plumbing Labor</td>
<td>$28,000.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>28,000.00</td>
</tr>
<tr>
<td>131</td>
<td>Bldg 20 AG Plumbing Fixtures</td>
<td>$5,000.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>5,000.00</td>
</tr>
<tr>
<td>132</td>
<td>Bldg 20 AG Plumbing Fixtures Labor</td>
<td>$20,000.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>20,000.00</td>
</tr>
<tr>
<td>133</td>
<td>Insulation</td>
<td>$5,000.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>5,000.00</td>
</tr>
<tr>
<td>134</td>
<td></td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
</tr>
<tr>
<td>135</td>
<td>HVAC/Dehumidifier</td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
</tr>
<tr>
<td>136</td>
<td>EF & Destrat</td>
<td>$37,066.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>37,066.00</td>
</tr>
<tr>
<td>137</td>
<td>EUH</td>
<td>$9,492.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>9,492.00</td>
</tr>
<tr>
<td>138</td>
<td>GUH</td>
<td>$3,660.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>3,660.00</td>
</tr>
<tr>
<td>139</td>
<td>LV & Dampers</td>
<td>$15,828.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>15,828.00</td>
</tr>
<tr>
<td>140</td>
<td>Split & F/CU</td>
<td>$20,788.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>20,788.00</td>
</tr>
<tr>
<td>141</td>
<td>Dehumidifiers</td>
<td>$18,166.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>18,166.00</td>
</tr>
<tr>
<td>142</td>
<td>Duct Material</td>
<td>$4,003.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>4,003.00</td>
</tr>
<tr>
<td>143</td>
<td>HVAC Materials</td>
<td>$4,497.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>4,497.00</td>
</tr>
<tr>
<td>144</td>
<td>HVAC Labor</td>
<td>$117,908.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>117,908.00</td>
</tr>
<tr>
<td>145</td>
<td>Insulation</td>
<td>$10,000.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>10,000.00</td>
</tr>
<tr>
<td>146</td>
<td>Test & Balance</td>
<td>$5,750.00</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>5,750.00</td>
</tr>
<tr>
<td>147</td>
<td></td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
</tr>
<tr>
<td>148</td>
<td><b>Electrical & Controls</b></td>
<td></td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
<td>-</td>
</tr>
</table>
Sheets in this document
- p. 22 Concept Design · Streamline Architects · Tiffin Events Center
- p. 23 Concept Design · Streamline Architects · Tiffin Events Center
- p. 24 Concept Design · Streamline Architects · Tiffin Events Center
- p. 25 Concept Design · Streamline Architects · Tiffin Events Center
- p. 26 Concept Design · Streamline Architects · Tiffin Events Center
- p. 27 Concept Design · Streamline Architects · Tiffin Events Center
- p. 28 Concept Design · Streamline Architects · Tiffin Events Center
- p. 29 Concept Design · Gallant Design
- p. 30 Concept Design | Tiffin Events Center · Streamline Architects
- p. 31 Concept Design · Streamline Architects · Tiffin Events Center
- p. 32 Concept Design · Streamline Architects · Tiffin Events Center
- p. 33 Concept Design · Gallant Design
- p. 34 Concept Design · Streamline Architects · Tiffin Events Center
- p. 35 Floor Plan
- p. 36 C120 · General Notes and Details · MMS Consultants
- p. 45 A.200 · South Elevation
- p. 46 Floor Plan
- p. 47 Floor Plan · Basement
- p. 48 A.200 · South Elevation
- p. 49 A.201 · North Elevation
- p. 50 Floor Plan · Level 2
- p. 51 A.200 · Building Elevations
- p. 52 Floor Plans
- p. 53 C200 · Site Layout · Iowa DOT
- p. 54 C300 · Site Utilities Plan
- p. 55 C301 · Site Utilities Plan
- p. 56 Revised Site P
- p. 57 Preliminary Plat
- p. 58 2 · Road Typical Section
- p. 59 3 · Revised Phasing & Utility Layout
- p. 71 Concept Design · Streamline Architects · Tiffin Events Center
- p. 72 Concept Design · Streamline Architects · Tiffin Events Center
- p. 73 Concept Design · Streamline Architects · Tiffin Events Center
- p. 74 Concept Design · Streamline Architects · Tiffin Events Center
- p. 75 Concept Design · Streamline Architects · Tiffin Events Center
- p. 76 Concept Design · Streamline Architects · Tiffin Events Center
- p. 77 Concept Design · Streamline Architects · Tiffin Events Center
- p. 78 Concept Design · Gallant Design
- p. 79 Concept Design | Tiffin Events Center · Streamline Architects
- p. 80 Concept Design · Streamline Architects · Tiffin Events Center
- p. 81 Concept Design · Streamline Architects · Tiffin Events Center
- p. 82 Concept Design · Gallant Design
- p. 83 Concept Design · Streamline Architects · Tiffin Events Center
- p. 84 Floor Plan
- p. 85 C120 · General Notes and Details · MMS Consultants
- p. 94 A.200 · South Elevation
- p. 95 Floor Plan
- p. 96 Floor Plan · Basement
- p. 97 A.200 · South Elevation
- p. 98 A.201 · North Elevation
- p. 99 Floor Plans
- p. 100 A.200 · Building Elevations
- p. 101 Floor Plans
- p. 102 C200 · Site Layout · Iowa DOT
- p. 103 C300 · Site Utilities Plan
- p. 104 C301 · Site Utilities South
- p. 105 Revised Site Plan
- p. 106 Preliminary Plat
- p. 107 2 · Road Typical Section
- p. 108 3 · Address City Comments Revised Phasing & Utility Layout
Sources
- revize: Agenda packet (packet_2025-12-02_4b734c31-25e7-4dd6-9fb9-361df96c5fac.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.