packet

Packet: Tiffin Regular City Council Meeting (12/02/2025)

Open the PDF Searchable PDF tesseract layer

Page 151 of 160

Text read by the vision model; check the PDF for anything that matters.
<table> <tr> <th>Application No.: 4R</th> <th>Application Period:</th> <th>From</th> <th>10/24/25</th> <th>to</th> <th>11/30/25</th> <th>Application Date:</th> <th>11/21/25</th> </tr> <tr> <td>25</td> <td>Rebar - Labor</td> <td>$71,872.60</td> <td>-</td> <td>21,561.78</td> <td>21,561.78</td> <td>30%</td> <td>50,310.82</td> </tr> <tr> <td>26</td> <td>Base Footings Materials</td> <td>$89,665.00</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>89,665.00</td> </tr> <tr> <td>27</td> <td>Base Footings Labor</td> <td>$49,315.75</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>49,315.75</td> </tr> <tr> <td>28</td> <td>Wall Footings Materials</td> <td>$98,663.00</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>98,663.00</td> </tr> <tr> <td>29</td> <td>Wall Footings Labor</td> <td>$54,264.65</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>54,264.65</td> </tr> <tr> <td>30</td> <td>Floor Slab Materials</td> <td>$156,442.00</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>156,442.00</td> </tr> <tr> <td>31</td> <td>Floor Slab Labor</td> <td>$88,874.50</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>88,874.50</td> </tr> <tr> <td>32</td> <td>Equipment Pads Materials</td> <td>$1,515.00</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>1,515.00</td> </tr> <tr> <td>33</td> <td>Equipment Pads Labor</td> <td>$3,451.50</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>3,451.50</td> </tr> <tr> <td>34</td> <td>Precast Concrete Materials</td> <td>$575,000.00</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>575,000.00</td> </tr> <tr> <td>35</td> <td>Precast Concrete Labor</td> <td>$204,412.67</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>204,412.67</td> </tr> <tr> <td>36</td> <td>Structure 30- Clearwell</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>37</td> <td>Rebar Materials</td> <td>$204,551.00</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>204,551.00</td> </tr> <tr> <td>38</td> <td>Rebar labor</td> <td>$112,503.05</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>112,503.05</td> </tr> <tr> <td>39</td> <td>Mat Foundation - Materials</td> <td>$123,255.00</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>123,255.00</td> </tr> <tr> <td>40</td> <td>Mat Foundation - Labor</td> <td>$68,450.80</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>68,450.80</td> </tr> <tr> <td>41</td> <td>Walls - Materials</td> <td>$78,452.00</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>78,452.00</td> </tr> <tr> <td>42</td> <td>Walls - Labor</td> <td>$98,065.00</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>98,065.00</td> </tr> <tr> <td>43</td> <td>Elevated Slab - Materials</td> <td>$198,553.00</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>198,553.00</td> </tr> <tr> <td>44</td> <td>Elevated Slab - Labor</td> <td>$109,204.15</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>109,204.15</td> </tr> <tr> <td>45</td> <td>Precast Concrete - Materials</td> <td>$210,000.00</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>210,000.00</td> </tr> <tr> <td>46</td> <td>Precast Concrete - Labor</td> <td>$61,058.33</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>61,058.33</td> </tr> <tr> <td>47</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>48</td> <td>Masonry</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>49</td> <td>Masonry - Materials</td> <td>$15,116.00</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>15,116.00</td> </tr> <tr> <td>50</td> <td>Masonry - Labor</td> <td>$50,603.00</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>50,603.00</td> </tr> <tr> <td>51</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>52</td> <td>Metals</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> <td>-</td> </tr> <tr> <td>53</td> <td>Metal Fabrications - Materials</td> <td>$57,200.00</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>57,200.00</td> </tr> <tr> <td>54</td> <td>Metal Fabrications - Labor</td> <td>$13,556.25</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>13,556.25</td> </tr> <tr> <td>55</td> <td>Handrails & Railings Labor</td> <td>$5,966.50</td> <td>-</td> <td>-</td> <td>-</td> <td>0%</td> <td>5,966.50</td> </tr> </table>

Sheets in this document

  • p. 22 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 23 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 24 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 25 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 26 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 27 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 28 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 29 Concept Design · Gallant Design
  • p. 30 Concept Design | Tiffin Events Center · Streamline Architects
  • p. 31 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 32 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 33 Concept Design · Gallant Design
  • p. 34 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 35 Floor Plan
  • p. 36 C120 · General Notes and Details · MMS Consultants
  • p. 45 A.200 · South Elevation
  • p. 46 Floor Plan
  • p. 47 Floor Plan · Basement
  • p. 48 A.200 · South Elevation
  • p. 49 A.201 · North Elevation
  • p. 50 Floor Plan · Level 2
  • p. 51 A.200 · Building Elevations
  • p. 52 Floor Plans
  • p. 53 C200 · Site Layout · Iowa DOT
  • p. 54 C300 · Site Utilities Plan
  • p. 55 C301 · Site Utilities Plan
  • p. 56 Revised Site P
  • p. 57 Preliminary Plat
  • p. 58 2 · Road Typical Section
  • p. 59 3 · Revised Phasing & Utility Layout
  • p. 71 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 72 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 73 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 74 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 75 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 76 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 77 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 78 Concept Design · Gallant Design
  • p. 79 Concept Design | Tiffin Events Center · Streamline Architects
  • p. 80 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 81 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 82 Concept Design · Gallant Design
  • p. 83 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 84 Floor Plan
  • p. 85 C120 · General Notes and Details · MMS Consultants
  • p. 94 A.200 · South Elevation
  • p. 95 Floor Plan
  • p. 96 Floor Plan · Basement
  • p. 97 A.200 · South Elevation
  • p. 98 A.201 · North Elevation
  • p. 99 Floor Plans
  • p. 100 A.200 · Building Elevations
  • p. 101 Floor Plans
  • p. 102 C200 · Site Layout · Iowa DOT
  • p. 103 C300 · Site Utilities Plan
  • p. 104 C301 · Site Utilities South
  • p. 105 Revised Site Plan
  • p. 106 Preliminary Plat
  • p. 107 2 · Road Typical Section
  • p. 108 3 · Address City Comments Revised Phasing & Utility Layout

Sources

  • revize: Agenda packet (packet_2025-12-02_4b734c31-25e7-4dd6-9fb9-361df96c5fac.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.