Packet: Tiffin Regular City Council Meeting (12/02/2025)
Dated December 2, 2025City Council — regular meeting, December 2, 2025 160 pages
Ord. 2025-522, Ord. 2025-523, Res. 2025-089, Res. 2025-090, Res. 2025-091
Page 150 of 160
Text read by the vision model; check the PDF for anything that matters.<table>
<tr>
<th>A</th>
<th>B</th>
<th>C</th>
<th>D</th>
<th>E</th>
<th>F</th>
<th>G</th>
<th>H</th>
<th>I</th>
</tr>
<tr>
<th>Item No.</th>
<th>Description</th>
<th>Scheduled Value ($)</th>
<th>(D + E) From Previous Application ($)</th>
<th>This Period ($)</th>
<th>Materials Currently Stored (not in D or E) ($)</th>
<th>Work Completed and Materials Stored to Date (D + E + F) ($)</th>
<th>% of Scheduled Value (G / C) (%)</th>
<th>Balance to Finish (C - G) ($)</th>
</tr>
<tr>
<td colspan="9">Original Contract</td>
</tr>
<tr>
<td>00</td>
<td><b>General Requirements</b></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>01</td>
<td>General Conditions</td>
<td>$588,953.00</td>
<td>156,307.48</td>
<td>39,076.87</td>
<td>195,384.35</td>
<td>33%</td>
<td>393,568.65</td>
</tr>
<tr>
<td>02</td>
<td>Bond/Builder's Risk Insurance</td>
<td>$199,542.00</td>
<td>199,542.00</td>
<td></td>
<td>199,542.00</td>
<td>100%</td>
<td>-</td>
</tr>
<tr>
<td>03</td>
<td>Allowance EP1 - Generator & ATS</td>
<td>$329,890.00</td>
<td></td>
<td>329,890.00</td>
<td>329,890.00</td>
<td>100%</td>
<td>-</td>
</tr>
<tr>
<td>04</td>
<td>Allowance EP2 Electrical Equipment Line item 167</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>05</td>
<td>Allowance - Electrical Service</td>
<td>$5,000.00</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td>0%</td>
<td>5,000.00</td>
</tr>
<tr>
<td>06</td>
<td>Mobilization</td>
<td>$350,000.00</td>
<td>240,000.00</td>
<td></td>
<td>240,000.00</td>
<td>69%</td>
<td>110,000.00</td>
</tr>
<tr>
<td>07</td>
<td>Site Testing</td>
<td>$53,736.00</td>
<td>7,525.33</td>
<td>1,519.52</td>
<td>9,044.85</td>
<td>17%</td>
<td>44,691.15</td>
</tr>
<tr>
<td>08</td>
<td>Traffic Control</td>
<td>$10,000.00</td>
<td></td>
<td></td>
<td></td>
<td>0%</td>
<td>10,000.00</td>
</tr>
<tr>
<td>09</td>
<td>Portable Toilets</td>
<td>$5,400.00</td>
<td>445.20</td>
<td>148.40</td>
<td>593.60</td>
<td>11%</td>
<td>4,806.40</td>
</tr>
<tr>
<td>10</td>
<td>Dumpster</td>
<td>$14,600.00</td>
<td>1,000.00</td>
<td>500.00</td>
<td>1,500.00</td>
<td>10%</td>
<td>13,100.00</td>
</tr>
<tr>
<td>11</td>
<td>Concrete Washout Pit</td>
<td>$2,400.00</td>
<td></td>
<td></td>
<td></td>
<td>0%</td>
<td>2,400.00</td>
</tr>
<tr>
<td>12</td>
<td>Erosion Control</td>
<td>$8,250.00</td>
<td>2,500.00</td>
<td>500.00</td>
<td>3,000.00</td>
<td>36%</td>
<td>5,250.00</td>
</tr>
<tr>
<td>13</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>14</td>
<td><b>Existing Conditions</b></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>15</td>
<td>Structure Demolition</td>
<td>$33,445.00</td>
<td></td>
<td></td>
<td></td>
<td>0%</td>
<td>33,445.00</td>
</tr>
<tr>
<td>16</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>17</td>
<td><b>Concrete</b></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>18</td>
<td>Structure 10 - Existing Building</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>19</td>
<td>Rebar - Materials</td>
<td>$54,588.00</td>
<td></td>
<td></td>
<td></td>
<td>0%</td>
<td>54,588.00</td>
</tr>
<tr>
<td>20</td>
<td>Rebar - Labor</td>
<td>$46,399.80</td>
<td></td>
<td></td>
<td></td>
<td>0%</td>
<td>46,399.80</td>
</tr>
<tr>
<td>21</td>
<td>Concrete - Materials</td>
<td>$165,884.00</td>
<td></td>
<td></td>
<td></td>
<td>0%</td>
<td>165,884.00</td>
</tr>
<tr>
<td>22</td>
<td>Concrete - Labor</td>
<td>$91,308.20</td>
<td></td>
<td></td>
<td></td>
<td>0%</td>
<td>91,308.20</td>
</tr>
<tr>
<td>23</td>
<td>Structure 20 - RO Building</td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>24</td>
<td>Rebar - Materials</td>
<td>$84,556.00</td>
<td></td>
<td>29,594.60</td>
<td>29,594.60</td>
<td>35%</td>
<td>54,961.40</td>
</tr>
</table>
Sheets in this document
- p. 22 Concept Design · Streamline Architects · Tiffin Events Center
- p. 23 Concept Design · Streamline Architects · Tiffin Events Center
- p. 24 Concept Design · Streamline Architects · Tiffin Events Center
- p. 25 Concept Design · Streamline Architects · Tiffin Events Center
- p. 26 Concept Design · Streamline Architects · Tiffin Events Center
- p. 27 Concept Design · Streamline Architects · Tiffin Events Center
- p. 28 Concept Design · Streamline Architects · Tiffin Events Center
- p. 29 Concept Design · Gallant Design
- p. 30 Concept Design | Tiffin Events Center · Streamline Architects
- p. 31 Concept Design · Streamline Architects · Tiffin Events Center
- p. 32 Concept Design · Streamline Architects · Tiffin Events Center
- p. 33 Concept Design · Gallant Design
- p. 34 Concept Design · Streamline Architects · Tiffin Events Center
- p. 35 Floor Plan
- p. 36 C120 · General Notes and Details · MMS Consultants
- p. 45 A.200 · South Elevation
- p. 46 Floor Plan
- p. 47 Floor Plan · Basement
- p. 48 A.200 · South Elevation
- p. 49 A.201 · North Elevation
- p. 50 Floor Plan · Level 2
- p. 51 A.200 · Building Elevations
- p. 52 Floor Plans
- p. 53 C200 · Site Layout · Iowa DOT
- p. 54 C300 · Site Utilities Plan
- p. 55 C301 · Site Utilities Plan
- p. 56 Revised Site P
- p. 57 Preliminary Plat
- p. 58 2 · Road Typical Section
- p. 59 3 · Revised Phasing & Utility Layout
- p. 71 Concept Design · Streamline Architects · Tiffin Events Center
- p. 72 Concept Design · Streamline Architects · Tiffin Events Center
- p. 73 Concept Design · Streamline Architects · Tiffin Events Center
- p. 74 Concept Design · Streamline Architects · Tiffin Events Center
- p. 75 Concept Design · Streamline Architects · Tiffin Events Center
- p. 76 Concept Design · Streamline Architects · Tiffin Events Center
- p. 77 Concept Design · Streamline Architects · Tiffin Events Center
- p. 78 Concept Design · Gallant Design
- p. 79 Concept Design | Tiffin Events Center · Streamline Architects
- p. 80 Concept Design · Streamline Architects · Tiffin Events Center
- p. 81 Concept Design · Streamline Architects · Tiffin Events Center
- p. 82 Concept Design · Gallant Design
- p. 83 Concept Design · Streamline Architects · Tiffin Events Center
- p. 84 Floor Plan
- p. 85 C120 · General Notes and Details · MMS Consultants
- p. 94 A.200 · South Elevation
- p. 95 Floor Plan
- p. 96 Floor Plan · Basement
- p. 97 A.200 · South Elevation
- p. 98 A.201 · North Elevation
- p. 99 Floor Plans
- p. 100 A.200 · Building Elevations
- p. 101 Floor Plans
- p. 102 C200 · Site Layout · Iowa DOT
- p. 103 C300 · Site Utilities Plan
- p. 104 C301 · Site Utilities South
- p. 105 Revised Site Plan
- p. 106 Preliminary Plat
- p. 107 2 · Road Typical Section
- p. 108 3 · Address City Comments Revised Phasing & Utility Layout