Text read by the vision model; check the PDF for anything that matters.Contractor's Application for Payment
Owner: City of Tiffin
Engineer: MSA Professional Services
Contractor: Tricon Construction Group
Project: Water Treatment Plant Upgrades - City of Tiffin
Contract: Water Treatment Plant Upgrades
Owner's Project No.: ____________________________
Engineer's Project No.: 13603016
Contractor's Project No.: _______________________
Application No.: 4
Application Date: 11/21/2025
Application Period: From 10/24/2025 to 11/30/2025
<table>
<tr>
<th> </th>
<th> </th>
<th> </th>
</tr>
<tr>
<td>1. Original Contract Price</td>
<td>$</td>
<td>12,182,553.00</td>
</tr>
<tr>
<td>2. Net change by Change Orders</td>
<td>$</td>
<td>12,420.34</td>
</tr>
<tr>
<td>3. Current Contract Price (Line 1 + Line 2)</td>
<td>$</td>
<td>12,194,973.34</td>
</tr>
<tr>
<td>4. Total Work completed and materials stored to date<br>(Sum of Column G Lump Sum Total and Column G Unit Price Total)</td>
<td>$</td>
<td>1,759,214.72</td>
</tr>
<tr>
<td>5. Retainage<br>a. 5% X $ 1,738,164.72 Work Completed<br>b. 5% X $ 21,050.00 Stored Materials<br>c. Total Retainage (Line 5.a + Line 5.b)</td>
<td>$</td>
<td>86,908.24<br>1,052.50<br>87,960.74</td>
</tr>
<tr>
<td>6. Amount eligible to date (Line 4 - Line 5.c)</td>
<td>$</td>
<td>1,671,253.98</td>
</tr>
<tr>
<td>7. Less previous payments (Line 6 from prior application)</td>
<td>$</td>
<td>1,168,804.48</td>
</tr>
<tr>
<td>8. Amount due this application</td>
<td>$</td>
<td>502,449.50</td>
</tr>
<tr>
<td>9. Balance to finish, including retainage (Line 3 - Line 4, plus 5c)</td>
<td>$</td>
<td>10,523,719.36</td>
</tr>
</table>
Contractor's Certification
The undersigned Contractor certifies, to the best of its knowledge, the following:
Contractor: Tricon Construction Group
Signature: Mary K Stone
Date: 11/25/2025
PAYMENT OF: $502,449.50
(line 8 or other - attach explanation of the other amount)
Recommended by Engineer
By: [Name]
Title: Senior Project Engineer
Date: 11/26/25
Approved by Funding Agency
By: __________________________
Title: ________________________
Approved by Owner
By: __________________________
Title: ________________________
Date: __________________________ Date: __________________________
Sheets in this document
- p. 22 Concept Design · Streamline Architects · Tiffin Events Center
- p. 23 Concept Design · Streamline Architects · Tiffin Events Center
- p. 24 Concept Design · Streamline Architects · Tiffin Events Center
- p. 25 Concept Design · Streamline Architects · Tiffin Events Center
- p. 26 Concept Design · Streamline Architects · Tiffin Events Center
- p. 27 Concept Design · Streamline Architects · Tiffin Events Center
- p. 28 Concept Design · Streamline Architects · Tiffin Events Center
- p. 29 Concept Design · Gallant Design
- p. 30 Concept Design | Tiffin Events Center · Streamline Architects
- p. 31 Concept Design · Streamline Architects · Tiffin Events Center
- p. 32 Concept Design · Streamline Architects · Tiffin Events Center
- p. 33 Concept Design · Gallant Design
- p. 34 Concept Design · Streamline Architects · Tiffin Events Center
- p. 35 Floor Plan
- p. 36 C120 · General Notes and Details · MMS Consultants
- p. 45 A.200 · South Elevation
- p. 46 Floor Plan
- p. 47 Floor Plan · Basement
- p. 48 A.200 · South Elevation
- p. 49 A.201 · North Elevation
- p. 50 Floor Plan · Level 2
- p. 51 A.200 · Building Elevations
- p. 52 Floor Plans
- p. 53 C200 · Site Layout · Iowa DOT
- p. 54 C300 · Site Utilities Plan
- p. 55 C301 · Site Utilities Plan
- p. 56 Revised Site P
- p. 57 Preliminary Plat
- p. 58 2 · Road Typical Section
- p. 59 3 · Revised Phasing & Utility Layout
- p. 71 Concept Design · Streamline Architects · Tiffin Events Center
- p. 72 Concept Design · Streamline Architects · Tiffin Events Center
- p. 73 Concept Design · Streamline Architects · Tiffin Events Center
- p. 74 Concept Design · Streamline Architects · Tiffin Events Center
- p. 75 Concept Design · Streamline Architects · Tiffin Events Center
- p. 76 Concept Design · Streamline Architects · Tiffin Events Center
- p. 77 Concept Design · Streamline Architects · Tiffin Events Center
- p. 78 Concept Design · Gallant Design
- p. 79 Concept Design | Tiffin Events Center · Streamline Architects
- p. 80 Concept Design · Streamline Architects · Tiffin Events Center
- p. 81 Concept Design · Streamline Architects · Tiffin Events Center
- p. 82 Concept Design · Gallant Design
- p. 83 Concept Design · Streamline Architects · Tiffin Events Center
- p. 84 Floor Plan
- p. 85 C120 · General Notes and Details · MMS Consultants
- p. 94 A.200 · South Elevation
- p. 95 Floor Plan
- p. 96 Floor Plan · Basement
- p. 97 A.200 · South Elevation
- p. 98 A.201 · North Elevation
- p. 99 Floor Plans
- p. 100 A.200 · Building Elevations
- p. 101 Floor Plans
- p. 102 C200 · Site Layout · Iowa DOT
- p. 103 C300 · Site Utilities Plan
- p. 104 C301 · Site Utilities South
- p. 105 Revised Site Plan
- p. 106 Preliminary Plat
- p. 107 2 · Road Typical Section
- p. 108 3 · Address City Comments Revised Phasing & Utility Layout
Sources
- revize: Agenda packet (packet_2025-12-02_4b734c31-25e7-4dd6-9fb9-361df96c5fac.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.