packet

Packet: Tiffin Regular City Council Meeting (12/02/2025)

Open the PDF Searchable PDF tesseract layer

Page 145 of 160

Text read by the vision model; check the PDF for anything that matters.
<table> <tr> <th>ITEM NO.</th> <th>DESCRIPTION OF WORK</th> <th>SCHEDULED VALUE</th> <th colspan="2">WORK COMPLETED</th> <th>MATERIALS PRESENTLY STORED (NOT IN D OR E)</th> <th>TOTAL COMPLETED AND STORED TO DATE (D+E+F)</th> <th>% (G/C)</th> <th>BALANCE TO FINISH (C-G)</th> <th>RETAINAGE</th> </tr> <tr> <th></th> <th></th> <th>QTY | UNIT | UNIT $ | TOTAL $</th> <th>FROM PREVIOUS APPLICATION (D+E)</th> <th>THIS PERIOD</th> <th></th> <th></th> <th></th> <th></th> <th></th> </tr> <tr> <td>1</td> <td>Excavation, Class 10</td> <td>1 LS $122,500.00 $122,500.00</td> <td>1.0 $122,500.00</td> <td>-</td> <td>$0.00</td> <td>$122,500.00</td> <td>100%</td> <td>$0.00</td> <td>$3,675.00</td> </tr> <tr> <td>2</td> <td>Fertilizing & Mulching, Type 1</td> <td>1 LS $3,500.00 $3,500.00</td> <td>-</td> <td>1.0 $3,500.00</td> <td></td> <td>$3,500.00</td> <td>100%</td> <td>$0.00</td> <td>$105.00</td> </tr> <tr> <td>3</td> <td>Silt Fence</td> <td>2,000 LF $1.50 $3,000.00</td> <td>1,185.0 $1,777.50</td> <td>-</td> <td>$0.00</td> <td>$1,777.50</td> <td>59%</td> <td>$1,222.50</td> <td>$53.33</td> </tr> <tr> <td>4</td> <td>& Management</td> <td>1 LS $5,000.00 $5,000.00</td> <td>0.5 $2,500.00</td> <td>0.5 $2,500.00</td> <td></td> <td>$5,000.00</td> <td>100%</td> <td>$0.00</td> <td>$150.00</td> </tr> <tr> <td>5</td> <td>Mobilization</td> <td>1 LS $4,050.00 $4,050.00</td> <td>1.0 $4,050.00</td> <td>-</td> <td>$0.00</td> <td>$4,050.00</td> <td>100%</td> <td>$0.00</td> <td>$121.50</td> </tr> <tr> <td>0</td> <td>0</td> <td>0 $0.00 $0.00</td> <td>-</td> <td>$0.00</td> <td></td> <td>$0.00</td> <td></td> <td>$0.00</td> <td>$0.00</td> </tr> <tr> <td>0</td> <td>0</td> <td>0 $0.00 $0.00</td> <td>-</td> <td>$0.00</td> <td></td> <td>$0.00</td> <td></td> <td>$0.00</td> <td>$0.00</td> </tr> <tr> <th>TOTALS</th> <th></th> <th>$138,050.00</th> <th>$130,827.50</th> <th>$6,000.00</th> <th>$0.00</th> <th>$136,827.50</th> <th>91.00%</th> <th>$1,222.50</th> <th>$4,104.83</th> </tr> </table> CHANGE ORDERS <table> <tr> <th>Junk Ditch Clean Out, Excess Class 10</th> <th>QTY</th> <th>UNIT</th> <th>UNIT $</th> <th>TOTAL $</th> <th>FROM PREVIOUS APPLICATION (D+E)</th> <th>THIS PERIOD</th> <th>MATERIALS PRESENTLY STORED (NOT IN D OR E)</th> <th>TOTAL COMPLETED AND STORED TO DATE (D+E+F)</th> <th>% (G/C)</th> <th>BALANCE TO FINISH (C-G)</th> <th>RETAINAGE</th> </tr> <tr> <td>1</td> <td>1</td> <td>LS</td> <td>$14,825.25</td> <td>$14,825.25</td> <td>1.0 $14,825.25</td> <td>-</td> <td>$0.00</td> <td>$14,825.25</td> <td>100%</td> <td>$0.00</td> <td>$444.76</td> </tr> <tr> <th>TOTAL CHANGE ORDERS</th> <th></th> <th></th> <th></th> <th></th> <th>$14,825.25</th> <th>$14,825.25</th> <th>$0.00</th> <th>$14,825.25</th> <th>100%</th> <th>$0.00</th> <th>$444.76</th> </tr> <tr> <th>TOTALS & CHANGE ORDERS</th> <th></th> <th></th> <th></th> <th></th> <th>$152,875.25</th> <th>$145,652.75</th> <th>$6,000.00</th> <th>$151,652.75</th> <th>99%</th> <th>$1,222.50</th> <th>$4,549.58</th> </tr> </table>

Sheets in this document

  • p. 22 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 23 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 24 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 25 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 26 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 27 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 28 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 29 Concept Design · Gallant Design
  • p. 30 Concept Design | Tiffin Events Center · Streamline Architects
  • p. 31 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 32 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 33 Concept Design · Gallant Design
  • p. 34 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 35 Floor Plan
  • p. 36 C120 · General Notes and Details · MMS Consultants
  • p. 45 A.200 · South Elevation
  • p. 46 Floor Plan
  • p. 47 Floor Plan · Basement
  • p. 48 A.200 · South Elevation
  • p. 49 A.201 · North Elevation
  • p. 50 Floor Plan · Level 2
  • p. 51 A.200 · Building Elevations
  • p. 52 Floor Plans
  • p. 53 C200 · Site Layout · Iowa DOT
  • p. 54 C300 · Site Utilities Plan
  • p. 55 C301 · Site Utilities Plan
  • p. 56 Revised Site P
  • p. 57 Preliminary Plat
  • p. 58 2 · Road Typical Section
  • p. 59 3 · Revised Phasing & Utility Layout
  • p. 71 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 72 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 73 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 74 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 75 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 76 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 77 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 78 Concept Design · Gallant Design
  • p. 79 Concept Design | Tiffin Events Center · Streamline Architects
  • p. 80 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 81 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 82 Concept Design · Gallant Design
  • p. 83 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 84 Floor Plan
  • p. 85 C120 · General Notes and Details · MMS Consultants
  • p. 94 A.200 · South Elevation
  • p. 95 Floor Plan
  • p. 96 Floor Plan · Basement
  • p. 97 A.200 · South Elevation
  • p. 98 A.201 · North Elevation
  • p. 99 Floor Plans
  • p. 100 A.200 · Building Elevations
  • p. 101 Floor Plans
  • p. 102 C200 · Site Layout · Iowa DOT
  • p. 103 C300 · Site Utilities Plan
  • p. 104 C301 · Site Utilities South
  • p. 105 Revised Site Plan
  • p. 106 Preliminary Plat
  • p. 107 2 · Road Typical Section
  • p. 108 3 · Address City Comments Revised Phasing & Utility Layout

Sources

  • revize: Agenda packet (packet_2025-12-02_4b734c31-25e7-4dd6-9fb9-361df96c5fac.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 20, 2026. Built from the archive's documents; see how the data is built.