Construction Summary Schedule Update Scheduled November Activities: Scheduled December Activities: • Footings (100%) • High bay steel • Foundation walls (100%) • PEMB roofing • Foundation backfill (95%) • PEMB exterior metal panels • Exterior storm piping (100%) • Erection of pre-engineered metal building (25%) • Underground deep electrical (100%) • Underground plumbing (100%) • Stoop walls (100%) and topping slabs (0%) • Additional water main work (ASI-04) (100%) Manpower Report List of major subcontractors & number of employees onsite: Total number of employees: 38 • AAA Mechanical – 4 • Price Electric – 2 • Freeman Construction - 2 • Seehase Masonry - 7 • Ilten’s – 1 • SG Construction – 10 • Miron Concrete - 8 • Schrader Excavating & Grading Co – 2 • Miron Construction Manager - 2 Delays • Weather – See Daily Log Weather Report ‒ 1 day in November • 11/26 – High winds, 30-40mph Weather Delays (Construction) Scheduled Occurred Left 12 2 10 • Materials & Labor ‒ None at this time Deliver unmatched quality, Key Issues / Concerns & Recommended Action Steps create meaningful • Coordination of openings in CMU connections, and craft unforgettable experiences in everything we do. Capture what truly matters and find ways to inspire. Owner Progress Report | 250120 November 2025 Miron Construction Co., Inc. | 8

Sheets in this document

  • p. 17 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 18 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 19 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 20 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 21 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 22 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 23 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 24 Concept Design · Hume Architects · Tiffin Events Center
  • p. 25 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 26 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 27 Concept Design · Streamline Architects · Tiffin Events Center
  • p. 28 Concept Design · Hume Architects · Tiffin Events Center
  • p. 30 Floor Plan
  • p. 31 C120 · Final OPD Site Plan · MMS Consultants · Park Place City Center - Part One, Phase Four
  • p. 38 A.200 · West Elevation
  • p. 39 A.100 · Floor Plan · Level 2
  • p. 40 Floor Plan · Basement
  • p. 41 A.200 · Building Elevations
  • p. 42 A.201 · East Elevation
  • p. 43 Floor Plan · Level 2
  • p. 44 A.200 · Building Elevations
  • p. 45 Floor Plan · Level 2
  • p. 46 C200 · Site Layout Plan · Iowa DOT · Constructed as Part of Phase I Improvements
  • p. 47 C300 · Site Utilities Plan North · Grove Park Rowhomes
  • p. 48 C301 · Site Utilities Plan South · Grove Park Rowhomes
  • p. 49 Landscape Plan
  • p. 50 Preliminary Plat · Project Total
  • p. 51 2 · Preliminary Plat · Grove Park Rowhomes
  • p. 52 3 · Preliminary Plat
  • p. 91 map
  • p. 98 City of Tiffin FY 25-26 Town Hours by Month (chart; data on p. 97)
  • p. 134 Site Concrete
  • p. 135 Gym Floor and Slab on Grade · MEP

Sources

  • revize: Agenda packet (packet_2025-12-16_68f8c41f-ab61-420c-9e5a-6c45e968ae57.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 21, 2026. Built from the archive's documents; see how the data is built.