city code

2019 Design Standards Amendments

25 pages Ord. 2012-313

Open the PDF Searchable (OCR) PDF

Page 23 of 25

Text from the PDF text layer; check the PDF for anything that matters.
Section 7040 Pavement Rehabilitation Article 1.08 H. 1. Make the following change 1.08. H.1. Measurement: Measurement will be in square yards. No Deduction in area will be made for manholes, storm sewer intakes, valve boxes, or other structures less the 2 square yards in area. The maximum payable trench width for trenched utility work shall be computed based on pipe diameter and depth of cut. Refer to Table 3-3 for maximum payable trench widths. Pavement removal outside of the maximum trench width will not be measured for payment unless directed by the Engineer. Pavement removal for patching is included as part of the patching item and will not be measured separately. 23

Sources

  • citycode: 2019 Design Standards Amendments (2019-Design-Standards-Amendments.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.