Page 22 of 25
Text from the PDF text layer; check the PDF for anything that matters.Add figure 6010.308
Division 7 – Streets and Related Work
Section 7030 Sidewalks, Shared Use Paths, and Driveways
Article 1.08 A. 1. Make the following change
1.08. A.1. Measurement:
Measurement will be in square yards. No Deduction in area will be made for manholes, storm
sewer intakes, valve boxes, or other structures less the 2 square yards in area. The maximum
payable trench width for trenched utility work shall be computed based on pipe diameter and
depth of cut. Refer to Table 3-3 for maximum payable trench widths. Pavement removal outside of
the maximum trench width will not be measured for payment unless directed by the Engineer.
Pavement removal for patching is included as part of the patching item and will not be measured
separately.
22
Sources
- citycode: 2019 Design Standards Amendments (2019-Design-Standards-Amendments.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.