city code
Subdividers Ordinance
Page 71 of 158
Text from the PDF text layer; check the PDF for anything that matters. secret process or manufacturing procedure for a closely guarded
proprietary compound or product to become public knowledge and be
available to competitors.
3. The type and location of abatement devices to control, or recording
instruments to measure conformance with required standards, not
including devices and instruments that are inherent in the manufacturing
process.
4. Such other data and certification as may reasonably be required by the
Planning and Zoning Commission to reach a determination.
5. All information and evidence submitted in applications to indicate
conformity to performance standards must constitute a certification and
an agreement on the part of the applicant that the proposed use can
and will conform to such standards at all times.
D. Administrative Options
The Planning and Zoning Commission may approve and authorize the
establishment of the use, building, or structure if all pertinent provisions of this
Ordinance and other applicable ordinances are complied with. If, however, the
Planning and Zoning Commission determines that the proposed use, building, or
structure may not comply with performance standards, they may inform the
applicant that either more information is necessary or that an independent
engineering analysis of the proposed use, building, or structure is required prior
to final City Council approval.
E. Need for Independent Engineering Analysis
If the Planning and Zoning Commission determines that reason exists to doubt
the compliance with any applicable performance standard provision, a state
licensed professional engineer of the City’s choosing—but acceptable to the
petitioner—may be asked to analyze the prospects of compliance. Costs of such
analysis must be paid by the applicant.
F. Use of Independent Engineering Analysis
Upon submission of an independent engineering analysis authorized by the City,
the Planning and Zoning Commission must authorize establishment of the use,
building, or structure if the independent analysis confirms probable compliance
with this provision and if all other applicable provisions of this and other City
ordinances are satisfied. If, however, the independent engineering analysis
indicates that the proposed use, building, or structure is not likely to comply with
this provision, then the application must be denied until such time that the
proposal is able to comply fully.
G. Appeal of Administrative Determination
Action, or a lack of action by the Planning and Zoning Commission, with
reference to these performance standards may be appealed to the City of Tiffin
Board of Adjustment. In instances when no action has been taken by the
Planning and Zoning Commission within 120 days after formal filing of the
application, the lack of action may be appealed to the City of Tiffin Board of
Adjustment.
71
Adopted November 14, 2007
Sources
- citycode: Subdividers Ordinance (Tiffin-Zoning-Ordinance-2007-287.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.