city code
Subdividers Ordinance
Page 70 of 158
Text from the PDF text layer; check the PDF for anything that matters. 2. Ensure that all industries provide methods that protect the community
from hazards that are preventable by legitimate processes of control
and nuisance elimination.
3. Protect industries from arbitrary exclusion or persecution based solely
on subjective determinations of industrial performances made in the
past.
B. Applicability
Performance standard provisions of this Section must be applicable to any use
established in this zoning district in either of the following instances:
1. If any use, building or other structure, established prior to the effective
date of this ordinance is extended, enlarged, moved, structurally
altered, or reconstructed, the change in building or land use or
configuration must be in full compliance with this provision. Uses
lawfully established prior to the effective date of this Ordinance, and not
being extended, enlarged, moved, structurally altered or reconstructed,
must fully comply with applicable industrial performance standards
existing at the time of use establishment or at the time of most recent
structural alteration.
2. Any use established, any building or structure constructed, or tract of
land developed for any permitted, special, or accessory use in this
zoning district must comply with all of the performance standards herein
set forth.
C. Procedure
Showing of Probable Compliance - Uses, buildings, or structures required to
comply with this provision must make a showing of probable compliance with
these performance standards prior to undertaking any alteration. The showing
must be in the form of a letter submitted with the zoning application (or building
application if proper industrial zoning already exists) prepared by a professional
engineer, licensed by the State of Iowa, certifying that the use, building, or
structure complies with all industrial performance standard requirements. The
letter must be based on the engineer's personal scrutiny of the site and proposed
use or alteration, and must have analytical foundation in accepted engineering
principles. In addition, the Planning and Zoning Commission may require the
applicant to submit:
1. A plot plan showing the location of all present and proposed structures,
drives, parking lots, waste disposal areas, bulk storage areas, streets,
streams, or other significant features on or within two hundred (200) feet
of the proposed site.
2. A description of the activity to be conducted regarding waste products,
external effects, or other conditions that are regulated herein; provided,
however, that the applicant must not be required to reveal any trade
secrets or sufficient detail with regard to a process that would cause any
70
Adopted November 14, 2007
Sources
- citycode: Subdividers Ordinance (Tiffin-Zoning-Ordinance-2007-287.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.