Text from the PDF text layer; check the PDF for anything that matters. 1. No public streets will be constructed. Any
private drives and parking areas
running through the Development will be installed according to the Design Standards adopted
by the City, which will be shown on the construction plans, to be approved by the City
Engineer. Any private streets and drives shall be installed and maintained by the Developer
and its successors and assigns. The following are private streets: (1)That
portion of Drift
Lane south of Mopar Drive ; ( 2)Confluence Lane.
2. The Developer shall provide for the installation of all electric lines, street
lights, gas mains, telephone lines and other utility facilities that are necessary at the
s sole cost. Developer further agree that all utilities shall be installed
Developer'
underground.
3. Any decorative street lighting shall be approved by the City and installed at
the Developer'
s sole cost.
4. At such time as building construction occurs on any lot in the OPD, but in
no event later than five ( 5)years from the date this Agreement is recorded, the Developer, or
its successors and assigns, shall install sidewalks per the widths approved on the
Preliminary
Plat and Site Plan, in accordance with the plans and specifications of the City, and subject to
inspections by the City Engineer or designee, unless otherwise specified in this Agreement.
The sidewalk along the south side of Mopar Drive will be installed
by Developer
prior to final plat approval.
Developer acknowledges its duty to install a sidewalk along Park Road. However,
due to City plans to improve Park Road, a sidewalk is not feasible at this time. Prior to final
plat approval, Developer shall provide to the City the cost of installing the sidewalk, as
determined by the City Engineer. An in kind contribution in lieu of payment
may be
accepted at the discretion of the City.
5. Developer shall submit to the City, for approval by the City Engineer, a
The
storm water plan which will identify the drainage of this development and
management
specify the manner in which storm water, drainage and runoff will be accommodated. The
Developer agrees to dispose of all storm water through the approved storm water and
drainageway system as set forth in the storm water
management plan. The design and
construction of the storm water sewer system and storm water detention basin, if
required by
the City for this development, shall be in compliance with the City'
s current storm water
management ordinances and policies.
6. The Developer shall provide water, sewer, utility, access,
drainage and other
easements as shown on the approved Site Plan and approved Final Plat which are acceptable
to the City.
7. Developer grants to the City an easement for access for any City Official acting
in the course of his or her official duties.
S. The Developer shall install all water mains, water lines, sewer mains, sewer
lines and storm sewer systems within the
Development, according to City Design standards.
Upon acceptance by the City of the water mains, sewer mains and storm sewer by resolution,
the water mains, sewer mains and storm sewer shall be owned and maintained
by the City.