resolution
Resolutions-2023-082
Page 4 of 16
Text from the PDF text layer; check the PDF for anything that matters. City agrees to the construction of the public improvements after final plat approval, the
12 of the Tiffin
Developer has complied with the security requirements set forth in Section 5.
Subdivision Ordinance and as specified in Section 6 and 7 of this agreement; and
4. The Developer enters into and abides by this Agreement.
B. The Developer further agrees that this Agreement shall be a covenant running with the
land and shall be binding on the present and future owners of the Real Estate.
C. The Developer may not grade or otherwise disturb the earth, remove trees, construct
public or private improvements or any buildings until the following conditions have been satisfied:
1. This Agreement has been fully executed by both parties, filed with the City
Clerk, and approved by the City Council;
2. The Developer has complied with the pre -construction erosion control and
grading provisions set forth in Section 5 of this agreement; and
3. All permits required by local, state, and federal law have been applied for and
issued by the appropriate authority.
4. Contingent upon the permitting requirements set forth in Paragraph 3 of this
section being met, all necessary construction permits have been applied for and issued by the
City.
SECTION 3. DEVELOPMENT REQUIREMENTS AND PUBLIC IMPROVEMENTS
A. Development Standards. The Development shall be developed according to the Site Plan
and Preliminary Plat as approved by the City and according to the plans and specifications approved
as
by the City. All construction
plans shall be
approved before the commencement of any work in
accordance with the Site Plan and Preliminary Plat. There shall be no variance from the approved
Preliminary Plat, approved Site Plan, or from the construction plans and specifications, unless approved
in writing by the City.
B. Public Improvement Standards. All improvements and facilities described in this
Agreement shall be constructed and installed by the Developer according to the plans, specifications,
ordinances and standards of the City and in accordance with all applicable federal and state laws and
regulations. All required inspections shall be performed by the City Engineer or designate. Said
inspections shall consist of inspection of the work in progress but shall not relieve or release the
Developer from its responsibility to construct said improvements and facilities pursuant to the agreed
upon plans and specifications. These improvements and facilities include but are not limited to public
water system; sanitary sewer system; stoiui sewer and drainageway system; site grading; underground
utilities; setting for lot and block monuments; and surveying and staking.
C. Standard Requirements. Further, the Developer agrees that:
2
Sources
- laserfiche: Resolutions-2023-082 (Resolutions-2023-082.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.