Text from the PDF text layer; check the PDF for anything that matters.not limited to, the construction and maintenance of all fences between the boundary of the
subdivision and abutting land used for agricultural purposes, and entering into appropriate fence
agreements prior to final plat approval, as approved by the City.
F. Sanitary Sewer Upgrade. Developer and City acknowledge that the sanitary sewer
main located south of Highway 6 will have to be upgraded by City in order to meet the demands
of the subdivision, and other property in the area. The cost due from the Developer for this
upgrade is $ acre,
616.
67/ which amount is S8,71,and shall be paid prior to final plat
016.
approval.
G. Easement Vacation. Any easements requested to be vacated must be separately
approved by City Council. Approval of the plat and this agreement does not approve the vacation
of such easements.
H. Traffic Light. The City and the Developer agree that a traffic light shall be
installed at the intersection of N. Kimberlite and Highway 6. Developer shall design such traffic
light as approved by the Iowa DOT and the City. Within three months after DOT approval,
Developer shall construct and install the traffic light. Developer shall pay for the entire cost of
design and 60% of the costs of construction of the traffic light. City shall pay 40%
of the cost of
construction of the traffic light, including parts and labor.
I.
Development Agreement. The City and Developer may enter into a separate
Development Agreement for Lots 1, 2, 3, 4 or 5, which may provide Developer with certain
Development incentives.
SECTION 4. PUBLIC UTILITIES
Developer agrees that it will obtain any necessary concurrence of utility or other
easements from appropriate utility companies. Developer agrees that it will provide for the
continuation of all required water, sanitary sewer and storm drainage facilities. The Developer
agrees that it will connect and use existing public water supplies in accordance with the Tiffin
Municipal Code and that the Developer will provide a plan outlining the drainage of the land and
indicating the manner in which the drainage will be accommodated and will connect to the
existing storm water sewer systems when available in accordance with the plan approved by the
City Engineer.
SECTION 5. EROSION CONTROL AND GRADING
A. Erosion Control. Before any utility construction is commenced or
building
peiiiiits are issued, the Developer shall design and implement erosion control
an
plan which shall
be reviewed and approved by the
City. All areas disturbed by the excavation and backfilling
operations shall be reseeded forthwith
after the completion of the work in that area. All seeded
areas shall be fertilized, mulched and disc anchored as necessary for seed retention. The
parties
recognize that time is of the essence in controlling erosion, and, if the Developer does not
comply with the erosion control plan or any supplementary instructions received from the City,
the City may take such action as it deems appropriate to control erosion and assess the costs of
such action to the Developer or the property, or both. The City will endeavor to
notify the
Developer in advance of any proposed action, but failure of the do will not affect the
City to so