resolution
Resolutions-2019-024
Page 4 of 10
Text read by the vision model; check the PDF for anything that matters.and constructing public streets. The final plat will not be approved until: (1) Creekside Drive is installed from the north line of the subdivision to Oakdale Boulevard and accepted by the City; and (2) Hillside Drive is installed from the north line of the subdivision to its intersection with Creekside Drive and accepted by the City; and (3) Mopar Drive, providing access to Park Road, is installed and accepted by the City.
G. Fencing. Prior to final plat approval the Developer must comply with the fencing requirements of the Tiffin Design Standards, currently found in Chapter 16. This includes, but is not limited to, the construction and maintenance of all fences between the boundary of the subdivision and abutting land used for agricultural purposes, and entering into appropriate fence agreements prior to final plat approval, as approved by the City. Further, prior to the time of dedication or conveyance to the City of any property (i.e. outlot, right of way, open space), and abutting property is used for agricultural purposes, the Developer must provide the City with a copy of the existing fence agreement. If no fence agreement exists, the Developer must enter into a fence agreement with the adjacent owner that is acceptable to the City or, upon the approval of the City, execute a Declaration of Fencing Responsibility wherein Developer agrees to erect and maintain a perimeter fence if requested by any owners of agricultural land lying adjacent to the subdivision.
SECTION 4. PUBLIC UTILITIES
Developer agrees that it will obtain any necessary concurrence of utility or other easements from appropriate utility companies. Developer agrees that it will provide for the continuation of all required water, sanitary sewer and storm drainage facilities. The Developer agrees that it will connect and use existing public water supplies in accordance with the Tiffin Municipal Code and that the Developer will provide a plan outlining the drainage of the land and indicating the manner in which the drainage will be accommodated and will connect to the existing storm water sewer systems when available in accordance with the plan approved by the City Engineer.
SECTION 5. EROSION CONTROL AND GRADING
A. Erosion Control. Before any utility construction is commenced or building permits are issued, the Developer shall design and implement an erosion control plan which shall be reviewed and approved by the City. All areas disturbed by the excavation and backfilling operations shall be reseeded forthwith after the completion of the work in that area. All seeded areas shall be fertilized, mulched and disc anchored as necessary for seed retention. The parties recognize that time is of the essence in controlling erosion, and, if the Developer does not comply with the erosion control plan or any supplementary instructions received from the City, the City may take such action as it deems appropriate to control erosion and assess the costs of such action to the Developer or the property, or both. The City will endeavor to notify the Developer in advance of any proposed action, but failure of the City to do so will not affect the Developer’s and City’s rights or obligations hereunder.
B. Grading. No grading of any nature may occur on this property until a grading plan is implemented by the Developer and approved by the City. Within ninety (90) days after the completion of any grading, the Developer shall provide the City with an “as-constructed” grading plan and a certification by registered land surveyor or engineer that all ponds, swales and ditches, if any, have been constructed in accordance with the plans approved by the City.
Sources
- laserfiche: Resolutions-2019-024 (Resolutions-2019-024.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.