resolution

Resolutions-2019-024

Dated March 20, 2019 10 pages Res. 2019-024, Res. 2019-023

Open the PDF Searchable (OCR) PDF

Page 3 of 10

Text read by the vision model; check the PDF for anything that matters.
3. Any decorative street lighting shall be approved by the City and installed at the Developer’s sole cost. 4. At such time as building construction occurs on a lot, but in no event later than five (5) years from the date the final subdivision plat is recorded of the development, the Developer shall install sidewalks in said subdivision abutting said lots per the widths approved on the preliminary plat, in accordance with the plans and specifications of the City, and subject to inspections by the City Engineer or designate, unless otherwise shown on the plat or otherwise specified in this Agreement. a. A sidewalk must be constructed along Hillside Drive between Lots 11 and 12 as shown on the plat. This duty to install a sidewalk shall be a lien on Lots 11 and 12 of the subdivision until released by the City. 5. The Developer shall submit to the City, for approval by the City Engineer, a storm water management plan which will identify the drainage of this development and specify the manner in which storm water, drainage and runoff will be accommodated. The Developer agrees to dispose of all storm water through the approved storm water and drainageway system as set forth in the storm water management plan. The design and construction of the storm water detention basin(s), if required by the City for this development, shall be in compliance with the City’s current storm water management ordinances and policies. 6. The Developer shall provide any water, sewer, utility and drainage easements as shown on the approved final plat. Further, Developer shall provide all off-site easements the City requires that are acceptable to the City. 7. Any wells shall be abandoned in accordance with applicable local, state and federal laws and regulations. 8. The requirements set forth in Section 4.08 of the Tiffin Subdivision Ordinance regarding Neighborhood Open Space Requirements will be fulfilled by the Developer, for all real estate contained in the preliminary plat, as follows: a. Through the conveyance of Outlot “D” to the City of Tiffin for use as open space; b Providing a trail easement which is acceptable to the City, over the sanitary sewer easement in Outlot E. The City may then construct an 8 foot sidewalk within the trail easement at any time. Within five years from the date of this agreement, if the City has not yet constructed the trail easement, the Developer may approach the City to discuss changing the location of the trail, at the discretion of the City. Any costs associated with the change to the location of the trail would be paid by the Developer. If, within five years from the date of this agreement, after the trail is constructed by the City, the Developer wishes to change the location of the trail, the Developer and the City may discuss the Developer installing and constructing a new trail, at the discretion of the City. Any costs associated with the installing and constructing the new trail would be paid by the Developer; and

Sources

  • laserfiche: Resolutions-2019-024 (Resolutions-2019-024.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.