resolution

Resolutions-2019-022

Dated May 20, 2019 5 pages Res. 2019-022

Open the PDF Searchable (OCR) PDF

Page 5 of 5

Text read by the vision model; check the PDF for anything that matters.
10. The contracting authorities are reminded that federal regulations may apply to this contract. The contracting authorities shall ensure compliance with all applicable civil rights, and Davis-Bacon requirements. The Office of Contracts, Iowa DOT, will upload the AA/EEO poster listing all subcontractors with the tax certificates. Please contact the Iowa Department of Transportation Administrating Office regarding the pre-construction meeting and construction administration and inspection requirements. NOTE 1: When a Storm Water Pollution Prevention Plan has been developed by the Contracting Authority for one or more projects on the contract, the Co-permittee Certifications Statement (form 830215) can be downloaded here: http://infotrans//FormsMgt/External/830215.doc. The forms are no longer provided to local agencies by the Iowa DOT, Office of Contracts. Note 2: No preconstruction conferences shall be held and no work shall commence on this project until the IA DOT has concurred in award, digitally signed the contract and marked the contract as "Completed by the Office of Contracts". If you have any questions or concerns, or need assistance with the processing of contracts, or subcontracts; please contact: Mary Thompson Engineering Office Assistant II Office of Contracts 515-239-1415 Or by email: [email protected] If you have problems, questions or concerns with the use of Doc Express, the contract signing drawer or obtaining a digital ID, please contact: Tammi Bell Training Specialist II Office of Local Systems 515-239-1529 Or by email: [email protected] Sincerely, Mark J. Dunn Mark J. Dunn, P.E. Contracts Engineer MJD/met Enc.

Sources

  • laserfiche: Resolutions-2019-022 (Resolutions-2019-022.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.