resolution

Resolutions-2018-022

Dated March 13, 2018 20 pages Res. 2018-022, Res. 2018-021

Open the PDF

Page 4 of 20

Text from the PDF text layer; check the PDF for anything that matters.
DocuSignEnvelopeID:1E341587-93AB-4D35-8476-BD83F4141D09 3. Any decorative street lighting shall beapproved bytheCity andinstalled attheDevelo 4. Atsuch time asbuilding construction occurs onalot,but innoevent later than five (5)years from thedate thefinal subdivision plat isrecorded ofthe development, theDeveloper shall install sidewalks insaid subdivision abutting saidlots perthewidths approved onthe preliminary plat, inaccordance with the plans and specifications oftheCity, andsubject toinspections bythe City Engineer ordesignate, unless otherwise shown ontheplat orotherwise specified inthis Agreement. The following sidewalks shall beinstalled bythe Developer andcompleted prior tofinal plat approval: The sidewalk tobeconstructed along Bonefish Street abutting Outlot B; the sidewalks tobeconstructed along Bonefish Street abutting Outlot AandOutlot C; the sidewalk tobeconstructed along Ironwood Lane abutting Outlot A;. A.The sidewalks tobeconstructed along Omer Street abutting Outlot E andOutlot F,andalong Thomas Street abutting Outlot FandOutlot Gand thesidewalks along Bonefish Street abutting Outlot Dand Outlot Eshall beconstructed bythe Developer atthetime theproperty tothesouth develops. B.Aneight foot sidewalk shall beconstructed along theeast side of Bonefish Street, abutting Lots 19, 20, 21, 22, 23, 24, 25, 26andOutlots B,CandD. 5. The Developer shall submit totheCity, forapproval bytheCity Engineer, astorm water management plan which willidentify thedrainage ofthisdevelopment and specify themanner inwhich storm water, drainage and runoff will beaccommodated. The Developer agrees todispose ofallstorm water through theapproved storm water and drainageway system assetforth inthestorm water management plan. The design and construction ofthestorm water detention basin(s),ifrequired bytheCity forthis ordinances andpolicies. 6. The Developer shall provide any water, sewer, utility and drainage easements asshown ontheapproved final plat. Further, Developer shall provide alloff- siteeasements theCity requires that areacceptable totheCity. 7. Any wells shall beabandoned inaccordance with applicable local, state andfederal laws andregulations. 8. The requirements set forth inSection 4.08ofthe Tiffin Subdivision Ordinance regarding Neighborhood Open Space Requirements have been fulfilled bythe Developer through theconveyance ofOutlot AinPrairie Village Residential Development totheAssociation, asprovided below, andtheconveyance ofOutlot Cand Outlot BtotheCity. The City further agrees that the open space provided byOutlot A, Outlot Band Outlot C maybeutilized bytheDeveloper, oritsaffiliate orassignee, in satisfying theOpen Space Requirements for thePrairie Village Commercial subdivision. 9. The Developer shall create aPrairie Village Homeowners Association fortheentire Prairie Village Residential Development subdivision. 3

Sources

  • laserfiche: Resolutions-2018-022 (Resolutions-2018-022.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.