C. Standard Requirements. Further, the Developer agrees that:
1. All streets shown on the plat will be constructed of concrete paving with
concrete curb and gutter, which will be shown on the construction plans, to be approved by
the City Engineer, and will be dedicated to the City.
2. The Developer shall provide for the installation of all electric lines, street
lights, gas mains, telephone lines and other utility facilities that are necessary at the
Developer' s sole cost. Developer further agrees that all utilities shall be installed
underground.
3. Any decorative street lighting shall be approved by the City and installed at
the Developer' s sole cost.
4. At such time as building construction occurs on a lot, but in no event later
than five ( 5) years from the date the subdivision plat is recorded, the Developer shall
install sidewalks in said subdivision abutting said lots per the widths approved on the
preliminary plat, in accordance with the plans and specifications of the City, and subject
to inspections by the City Engineer or designate, unless otherwise shown on the plat or
otherwise specified in this agreement. The Developer is responsible to install and pay for
the City portion of the sidewalks along Outlot A and Outlot C.
5. The Developer shall submit to the City, for approval by the City Engineer,
a storm water management plan which will identify the drainage of this development and
specify the manner in which storm water, drainage and runoff will be accommodated.
The Developer agrees to dispose of all storm water through the approved storm water and
drainageway system as set forth in the storm water management plan. The design and
construction of the storm water detention basin, if required by the City for this
development, shall be in compliance with the City' s current storm water management
ordinances and policies.
6. The Developer shall provide water, sewer, utility and drainage easements
as shown on the approved final plat.
7. Any wells shall be abandoned in accordance with applicable local, state and
federal laws and regulations.
8. The Developer has met the requirements laid out in Section 4. 08 of the Tiffin
Subdivision Ordinance regarding Neighborhood Open Space Requirements through
dedication of property to the City pursuant to the open space requirements of the
Subdivision Ordinance in effect when previous phases of Woodfield Ridge were approved.
3