Page 4 of 12
Text from the PDF text layer; check the PDF for anything that matters.DocuSign Envelope ID: 5133273A- F756- 4E4D- 9ACA- 5A9FFAB9B7B5
3. The public improvements will be constructed in accordance with approved
construction plans and accepted by the City or, in the event the Developer requests and
the City agrees to the construction of the public improvements after final plat approval,
the Developer has complied with the security requirements set forth in Section 5. 12 of the
Tiffin Subdivision Ordinance and Section 8 of this Agreement; and
4. The Developer enters into and abides by this Agreement.
B. The Developer further agrees that this Agreement shall be a covenant running
with the land and shall be binding on the present and future owners of the property.
C. The Developer may not grade or otherwise disturb the earth, remove trees,
construct sanitary sewer mains, storm sewer mains, water mains, streets, utilities, public or
private improvements or any buildings until the following conditions have been satisfied:
1. This Agreement has been fully executed by both parties, filed with the
City Clerk, and approved by the City Council;
2. The Developer has complied with the pre- construction erosion control and
grading provisions set forth in Section 5 of this agreement; and
3. All permits required by local, state, and federal law have been applied for
and issued by the appropriate authority.
SECTION 3. DEVELOPMENT REQUIREMENTS AND PUBLIC IMPROVEMENTS
A. Development Standards.
The subdivision shall be developed according to the
preliminary subdivision plat as approved by the City and according to the plans and specifications
as approved by the City. All construction plans shall be approved before the commencement of any
work in accordance with the subdivision plat. There shall be no variance from the preliminary plat,
or from the construction plans and specifications, unless approved in writing by the City.
B. Public Improvement Standards. All improvements and facilities described in this
Agreement shall be constructed and installed by the Developer according to the plans,
specifications, ordinances and standards of the City and in accordance with all applicable federal
and state laws and regulations. All required inspections shall be performed by the City Engineer or
designate. Said inspections shall consist of inspection of the work in progress but shall not relieve
or release the Developer from its responsibility to construct said improvements and facilities
pursuant to the agreed upon plans and specifications. These improvements and facilities include but
are not limited to public water system; sanitary sewer system; storm sewer and drainageway system;
site grading; underground utilities; setting for lot and block monuments; and surveying and staking.
2
Sources
- laserfiche: Resolutions-2016-076 (Resolutions-2016-076.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.