Text from the PDF text layer; check the PDF for anything that matters.Sheet C123
21. Revise returns at entrance from Boardwalk Avenue from 20’R to 28’R.
Returns have been revised.
22. Recommendation to include orange hatching in legend. It is our understanding
that this denotes removals.
A legend has been added. They denote removals.
Sheet C140
23. Identify dumpster location, if applicable.
A dumpster location has been added.
24. Seeding information appears to follow Iowa DOT Standard. Update seeding
information to follow SUDAS requirements.
Seeding information has been updated.
25. There appear to be conflicting contours on the east side of the site. Modify as
necessary.
Grading has been reviewed and revised.
Sheet C141-144
26. Relocate elevation test, slope test, and/or slope arrows, where necessary, to
avoid conflicting texts and be able to see ADA slopes. Ensure all ADA ramps and
landings have running and cross slopes for review, including those internal to
the site.
Spot and slope text has been reviewed. Additional views of ADA areas have
been added to a new plan sheet.
27. Verify if sheet scales are accurate and modify as necessary (all sheets).
Scales have been reviewed and revised as needed.
Sheet C141
28. Identify running slope of path to the south property line, if this is intended to
convey people from the southern parking lot to this site, verify ADA compliance.
This sidewalk connection has been removed.
Sheer C143
29. It appears there is a quick cross-slope transition at the north end between
proposed building 11 & 12, when vehicles turn south that begins at 3.99% and
exceed 7%. Consider evaluating and modify plans if desired.
This area has been reviewed, and the transition has been softened as much
as feasible.
Sheet C160
30. Streetlighting design shows light poles on top of the storm sewer. We
recommend light pole locations be revised or storm sewer be adjusted.
Light poles have been shifted to avoid pipes as needed.
Sources
- revize: Marvin Gardens Engineering Notes (PNM6FssBh2IKQdAp1MMRgESmC0uvPa.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: E Discussion and Consideration of OPD Site District, Park Place City Center – Part One,...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.