engineering report · E

Discussion and Consideration of OPD Site District, Park Place City Center – Part One, Phase Seven, Lots 9-14 – Marvin Gardens — Marvin Gardens Engineering Notes

Open the PDF

Page 4 of 8

Text from the PDF text layer; check the PDF for anything that matters.
should not be permitted within the functional area of the intersection to minimize conflicting vehicle paths. Removal of the stalls (shown in red) would allow for a crosswalk on the north side of the intersection. Acknowledged. Parking stalls have been removed. j. The site plan should plan to provide a pedestrian crossing of the Baltic Ave approach to the intersection to accommodate future multimodal connectivity. Acknowledged. Crosswalk proposed on south leg of intersection. Erosion Control 15. The review of erosion control measures by the City does not relieve the developer of their responsibility to install, maintain, and repair all erosion control systems in accordance with NPDES permit requirements. The City reserves the right to require additional erosion control measures as deemed necessary under City Code. Acknowledged. Stormwater Management Report 16. Numerous pipe lengths and slopes do not reflect the design in the submitted plans and therefore result in additional unreliable data in the stormwater management report. Update and resubmit. Revised report has been provided. Of note, the roof drains pipe runs were calculated to prove capacity on the flattest portion of slope. Because time of concentrations are all relatively low, the calculations neglect any increases in time of concentration by maintaining a constant intensity. Therefore, pipe lengths (particularly roof drainpipe lengths) are negligible in this analysis. 17. Once finalized, provide signed/sealed stormwater management report. A signed report has been provided. Sheet C120 18. Public utility easement on the south end of the development appears to tie into Park Place City Center Part 1, Phase 6, Lot 6 but there is no public utility easement shown on the southern development plan set or final plat. Verify intended use. The easement is from coordination with REC. There is a similar easement for Lot 6 that continues south. Sheet C122 19. Dimension proposed trail width along north side of property. A dimension has been added. 20. Dimension returns at entrance from Forevergreen Road. Verify they are 28’R. Dimensions have been added. Radii are 30’.

Sources

  • revize: Marvin Gardens Engineering Notes (PNM6FssBh2IKQdAp1MMRgESmC0uvPa.pdf) — where it was found ↗ first seen Oct 12, 2026

Attached to agenda item: E Discussion and Consideration of OPD Site District, Park Place City Center – Part One,...