contract agreement · K-4

Discussion and Consideration of Change Order #2 – Tricon Construction – Tiffin Water Treatment Facility Upgrade Project – Motion to Approve — K.4

Open the PDF Searchable (OCR) PDF

Page 7 of 63

Text from the PDF text layer; check the PDF for anything that matters.
PRICE QUOTATION CEDAR RAPIDS 1106 Shaver Rd NE Quote Date 08/29/2025 Cedar Rapids, IA 52402 Quote Number 10091799-00 Ph: 319-365-9421 Quote Expiration Date 09/05/2025 FAX: 319-365-9867 Writer Mike Booth www.schimberg.com Salesperson Mike Booth Total Weight 30.69 PHONE: (319) 465-5129 Freight Terms SchimbergTruck EMAIL: [email protected] Placed By MIKE Bill To FOSTERS KRAUS Ship To FOSTERS KRAUS 690 999 ENTERPRISE DR; STE 100 SAME 999 ENTERPRISE DR; STE 100 MARION, IA 52302 US MARION, IA 52302 us Notes Terms Req Ship Date Ship Point Ship Via N 45 DAYS 09/05/2025 SCHIMBERG CEDAR RAPIDS S CO TRUCK Line Quantity Qty Net Ext # NS Part Number And Description Ordered UM Price Price 1 81702010200 20.0 FT 1.57 31.40 PIPE HDPE DR11 2X20' 2 81760400200 1 EA 41.18 41.18 HDPE MPT BRASS ADP X SW 2 3 408045002001 1 EA 268.56 268.56 MIL UPBA450 BL VL CXC 2 BALL VALVE SWEAT LEAD FREE BRONZE BODY, CHROME PLATED BALL, FILLED TEFLON SEATS,600# FULL PORT LEVER HANDLE 4 61060020238 1 EA 17.56 17.56 RB BUSH 2X1 5 88560400100 1 EA 5.09 5.09 PVC80 ML ADP SXT 1 6 88060700100 4 EA 2.59 10.36 PVC80 90 ELL SXS 1 7 80202010100 20.0 FT 1.17 23.40 PIPE S80 PVC PE 1x20 7 Lines Total Total 397.55 SALES PERSON CONTACT INFORMATION Taxes 0.00 Mike Booth Quote Total 397.55 [email protected] All prices quoted are valid for 24 hours and are subject to change based on availability, increase in Tariffs, duties, or any other government-imposed import restrictions. If "ns" is indicated in the "ns" column or any part number begins with an "n" or "w", it is non-stock material and subject to manufacturers restock & return freight charges. ---Jobs with multiple shipments or a duration of more than 30 days must be authorized in advance.--- Customer Copy Page 1 of 1 10091799-00

Sources

Attached to agenda item: K-4 Discussion and Consideration of Change Order #2 – Tricon Construction – Tiffin Water...

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.