contract agreement · K-4
Discussion and Consideration of Change Order #2 – Tricon Construction – Tiffin Water Treatment Facility Upgrade Project – Motion to Approve — K.4
Page 46 of 63
Text from the PDF text layer; check the PDF for anything that matters. Bid Proposal for REV 2 Tricon Process TIFFIN WTP UPGRADES
Bid #: 4561648
Seq# Qty Description Units Price Ext Price
940 1 6 PVC S80 VANSTONE FLG SW SOCKET W/PVC RING 854-060 EA 34.00 34.00
950 1 6 PVC S80 BLIND FLANGE 853-060 EA 75.00 75.00
960 1 6X1/8 FLG FF RR GASKET EA 3.75 3.75
970 8 6 316SS B8M B&N SET USA EA 162.00 1,296.00
W/ 4-1/4" BOLTS
990 1 6 PVC S80 UNION HXH EA 105.00 105.00
1000 4 6 PVC S80 CPLG HXH 829-060 EA 37.50 150.00
1020 6" PVC CLN-RETURN
1030 100 6 PVC SCH80 PIPE PE 20' FT 12.75 1,275.00
1040 4 6 PVC S80 90 HXH 806-060 EA 48.00 192.00
1050 2 6X6 PVC S80 TEE HXH 801-060 EA 75.00 150.00
1060 1 6 PVC S80 VANSTONE FLG SW SOCKET W/PVC RING 854-060 EA 34.00 34.00
1070 1 6 PVC S80 BLIND FLANGE 853-060 EA 75.00 75.00
1080 1 6X1/8 FLG FF RR GASKET EA 3.75 3.75
1090 8 6 316SS B8M B&N SET USA EA 162.00 1,296.00
W/ 4-1/4" BOLTS
1110 1 6 PVC S80 UNION HXH EA 105.00 105.00
1120 4 6 PVC S80 CPLG HXH 829-060 EA 37.50 150.00
1140 3 QUART 705 CLEAR PVC CEMENT EA 20.00 60.00
1150 3 PVC PRIMER/CLEANER PURPLE-QT EA 22.50 67.50
1170 12" PERMEATE
1180 FROM FORCED DRAFT AERATOR
1190 1 12 FLGXPE DI PIPE PR 12' PRIMED USA EA 2,830.00 2,830.00
EXACT LENGTH TBD
1230 12" PVC PERMEATE
1240 FROM FORCED DRAFT AERATOR TO RO SKIDS
1250 100 12 PVC SCH80 PIPE PE 20' FT 39.50 3,950.00
1260 4 12 PVC S80 CPLG HXH 829-120F EA 235.00 940.00
1270 5 12 PVC S80 90 HXH 806-120F EA 1,250.00 6,250.00
1280 2 12X6 PVC S80 TEE HXH 801-666 EA 1,950.00 3,900.00
1290 1 12X6 PVC S80 BUSHING SPXHUB 837-666 EA 585.00 585.00
1300 1 12 PVC S80 VANSTONE FLG SW SOCKET W/PVC RING 854-120 EA 165.00 165.00
1310 3 6 PVC S80 VANSTONE FLG SPIGOT W/PVC RING 856-060 EA 35.00 105.00
1330 ------------------------------
1350 SHEETS 30M101 THRU 30M301
1360 HSPS & CLEARWELL
1370 12" PERMEATE WALL PIPES
1380 2 12 TMJXWCXPE DI PIPE PR USA EA 1,879.00 3,758.00
13-15/16" LONG
1400 2 12 STAR 3012 DIP REST SB USA STARBOND L/ACC SGDPS12RDD EA 97.50 195.00
1410 2 12 MJ REGULAR GASKET F/DI EA 12.50 25.00
1420 2 10/12 TAPT MJ STUD KIT SS EA 110.00 220.00
1440 8" OVERFLOWS
Actual taxes may vary Page 3 of 5
Sources
- revize: K.4 (ilsOpCSGLeJgWrIuB4PqcWDz92CA6Y.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-4 Discussion and Consideration of Change Order #2 – Tricon Construction – Tiffin Water...
Data last updated October 17, 2026. Built from the archive's documents; see how the data is built.