contract agreement · K-4
Discussion and Consideration of Change Order #2 – Tricon Construction – Tiffin Water Treatment Facility Upgrade Project – Motion to Approve — K.4
Page 43 of 63
Text from the PDF text layer; check the PDF for anything that matters. ITEM ANALYSIS
Project Tiffin Water Treatment Facilicy Upgrade Location Tiffin, IA
Description Butterfly Valve Deduct - 20-A18, A19, A20 Estimator Tom Shedek
Contractor Tricon Construction Group Date 12/9/2025
Labor Expense Permanent Materials
Sub Contracts
Description QTY Units Unit Rate Man-hours Wages Engineered Equipment Total Direct Cost
U.P. Total U.P. Total U.P. Total
Item # Base Bid Costs (Deducts)
1-1 Valve Deduct - 20-A18, 20-A19, 20-A20 - Mellen 3 Ea $ - $ 2,333.33 $ 7,000.00 $ - $ 7,000.00
1-2 6" Bolt/ Gasket Kits - Core & Main 4 Ea $ - $ 165.75 $ 663.00 $ - $ 663.00
1-3 8" Bolt/ Gasket Kits - Core & Main 2 Ea $ - $ 166.25 $ 332.50 $ - $ 332.50
1-4 Valve Installation Labor - 2 PF @ 2MH/valve 6.00 $ 100.00 $ 600.00 $ - $ - $ 600.00
1-5 $ - $ - $ - $ -
1-6 $ - $ - $ - $ -
Totals 6.00 $ 600.00 $ 7,995.50 $ - $ 8,595.50
Item # Base Bid Changes per Team/City Request
2-1 $ - $ - $ - $ -
2-2 $ - $ - $ - $ -
2-3 $ - $ - $ - $ -
2-4 $ - $ - $ - $ -
2-5 $ - $ - $ - $ -
2-6 $ - $ - $ - $ -
Totals - $ - $ - $ - $ -
Delta = Orange - Blue (pos # is total add, neg # is total deduct) 6.0 $ 600.00 $ 7,995.50 $ - $ (8,595.50)
NOTES: Delta = (Addition total - Base Bid total) Project Manager or Authorized Designee Signature
The above costs do not include any contractual markups.
X
Date:
1 OF 1 12/8/2025, 9:00 PM
Sources
- revize: K.4 (ilsOpCSGLeJgWrIuB4PqcWDz92CA6Y.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-4 Discussion and Consideration of Change Order #2 – Tricon Construction – Tiffin Water...
Data last updated October 17, 2026. Built from the archive's documents; see how the data is built.