contract agreement · K-4

Discussion and Consideration of Change Order #2 – Tricon Construction – Tiffin Water Treatment Facility Upgrade Project – Motion to Approve — K.4

Open the PDF Searchable (OCR) PDF

Page 39 of 63

Text from the PDF text layer; check the PDF for anything that matters.
ITEM ANALYSIS Project Tiffin Water Treatment Facilicy Upgrade Location Tiffin, IA Description 12" Permeate Butterfly Valve Addition in FD Aerator Vault Estimator Tom Shedek Contractor Tricon Construction Group Date 11/25/2025 Labor Expense Permanent Materials Sub Contracts Description QTY Units Unit Rate Man-hours Wages Engineered Equipment Total Direct Cost U.P. Total U.P. Total U.P. Total Item # Base Bid Costs (Deducts) 1-1 $ - $ - $ - $ - 1-2 $ - $ - $ - $ - 1-3 $ - $ - $ - $ - 1-4 $ - $ - $ - $ - 1-5 $ - $ - $ - $ - 1-6 $ - $ - $ - $ - Totals - $ - $ - $ - $ - Item # Base Bid Changes per Team/City Request 2-1 12" BFV addition - Mellen - Tricon 1 EA $ - $ 6,321.00 $ 6,321.00 $ - $ 6,321.00 2-2 Additional 12" bolt kit/gasket - UECO - Tricon 1 LS $ - $ 361.75 $ 361.75 $ - $ 361.75 2-3 Labor - 2 Pipefitters @ 2MH = 4 MH - Tricon 1 LS 4.00 $ 100.00 $ 400.00 $ - $ - $ 400.00 2-4 $ - $ - $ - $ - 2-5 $ - $ - $ - $ - 2-6 $ - $ - $ - $ - Totals 4.00 $ 400.00 $ 6,682.75 $ - $ 7,082.75 Delta = Orange - Blue (pos # is total add, neg # is total deduct) 4.0 $ 400.00 $ 6,682.75 $ - $ 7,082.75 NOTES: Delta = (Addition total - Base Bid total) Project Manager or Authorized Designee Signature The above costs do not include any contractual markups. X Date: 1 OF 1 11/25/2025, 4:48 PM

Sources

Attached to agenda item: K-4 Discussion and Consideration of Change Order #2 – Tricon Construction – Tiffin Water...

This document's details as JSON

Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.