contract agreement · K-4
Discussion and Consideration of Change Order #2 – Tricon Construction – Tiffin Water Treatment Facility Upgrade Project – Motion to Approve — K.4
Page 36 of 63
Text from the PDF text layer; check the PDF for anything that matters. MiTek, Inc.
16023 Swingley Ridge Rd.
Chesterfield, MO 63017
314.434.1200
I hereby certify that this engineering document was prepared by me or under
my direct personal supervision and that I am a duly licensed Professional
Engineer under the laws on the State of Iowa.
October 8,2025
Delbert, Ryan
My license renewal date is December 31, 2026..
Pages or sheets covered by this seal: I76896070 thru I76896070
TRICON - TIFFIN WATER TREATMENT
IMPORTANT NOTE: The seal on these truss component designs is a certification
that the engineer named is licensed in the jurisdiction(s) identified and that the
designs comply with ANSI/TPI 1. These designs are based upon parameters
shown (e.g., loads, supports, dimensions, shapes and design codes), which were
given to MiTek or TRENCO. Any project specific information included is for MiTek's or
TRENCO's customers file reference purpose only, and was not taken into account in the
preparation of these designs. MiTek or TRENCO has not independently verified the
applicability of the design parameters or the designs for any particular building. Before use,
the building designer should verify applicability of design parameters and properly
incorporate these designs into the overall building design per ANSI/TPI 1, Chapter 2.
CC: Revoswel Truss & Lumber, LLC
320 35th Street
Marion IA, 52302 ,
Sources
- revize: K.4 (ilsOpCSGLeJgWrIuB4PqcWDz92CA6Y.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-4 Discussion and Consideration of Change Order #2 – Tricon Construction – Tiffin Water...
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.