Text from the PDF text layer; check the PDF for anything that matters. ITEM ANALYSIS
Project Tiffin Water Treatment Facilicy Upgrade Location Tiffin, IA
Description Alliant Transformer Pad Relocate per Owner Request Estimator Tom Shedek
Contractor Tricon Construction Group Date 10/20/2025
Labor Expense Permanent Materials
Sub Contracts
Description QTY Units Unit Rate Man-hours Wages Engineered Equipment Total Direct Cost
U.P. Total U.P. Total U.P. Total
Item # Base Bid Costs (Deducts)
1-1 $ - $ - $ - $ -
1-2 $ - $ - $ - $ -
1-3 $ - $ - $ - $ -
1-4 $ - $ - $ - $ -
1-5 $ - $ - $ - $ -
1-6 $ - $ - $ - $ -
Totals - $ - $ - $ - $ -
Item # Base Bid Changes per Team/City Request
2-1 Added concrete paving to accommodate 4 bollards - Eggelston Paving 1 LS $ - $ - $ 950.00 $ 950.00 $ 950.00
2-2 4 added Bollards along transformer pad - Material & Labor - Tricon 1 LS $ 208.50 $ 208.50 $ 412.62 $ 412.62 $ 50.00 $ 50.00 $ 671.12
2-3 $ - $ - $ - $ -
2-4 $ - $ - $ - $ -
2-5 $ - $ - $ - $ -
2-6 $ - $ - $ - $ -
Totals - $ 208.50 $ 412.62 $ 1,000.00 $ 1,621.12
Delta = Orange - Blue (pos # is total add, neg # is total deduct) 0.0 $ 208.50 $ 412.62 $ 1,000.00 $ 1,621.12
NOTES: Delta = (Addition total - Base Bid total) Project Manager or Authorized Designee Signature
The above costs do not include any contractual markups.
X
Date:
1 OF 1 10/20/2025, 9:42 AM
Sources
- revize: K.4 (ilsOpCSGLeJgWrIuB4PqcWDz92CA6Y.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-4 Discussion and Consideration of Change Order #2 – Tricon Construction – Tiffin Water...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.