resolution

Resolutions-2011-05

Dated January 12, 2011 10 pages Res. 2011-005, Res. 2011-004

Open the PDF

Page 6 of 10

Text read by the vision model; check the PDF for anything that matters.
2012-2040 Long Range Plan - Federally Funded Transportation Infrastructure Projects Exhibit A <table> <tr> <th>Project Title</th> <th>Project Description (include type of project, location, length, etc.)</th> <th>$ Cost Estimate (Present dollar)</th> <th>Anticipated Year of Construction (2012-2020, 2021-2030, 2031-2040)</th> </tr> <tr> <td>Ireland Ave (Railroad St to Hwy 6)</td> <td>Grade & Pave Street, Install Curb, Gutter and Sidewalks or Trails</td> <td>$1,800,000</td> <td>2010-2015</td> </tr> <tr> <td>Trail (Jasper Ave to I-380)</td> <td>Grade and Pave Trail</td> <td>$238,000</td> <td>2010-2015</td> </tr> <tr> <td>Jasper Ave (Hwy 6 south to Clear Creek Bridge) Phase One</td> <td>Grade & Pave Street, Install Curb, Gutter and Sidewalks or Trails</td> <td>$1,000,000</td> <td>2010-2015</td> </tr> <tr> <td>Ireland Ave (I-80 to Clear Creek)</td> <td>Grade & Pave Street, Install Curb, Gutter and Sidewalks or Trails</td> <td>$1,500,000</td> <td>2015-2020</td> </tr> <tr> <td>Trail head east of Jasper Ave</td> <td>Grade and Pave Trailhead</td> <td>$30,000</td> <td>2015-2020</td> </tr> <tr> <td>Trailhead at Ireland</td> <td>Grade and Pave Trailhead</td> <td>$30,000</td> <td>2015-2020</td> </tr> <tr> <td>Ireland Ave (Clear Creek Bridge to Railroad St.)</td> <td>Replace Bridge and Grade and Pave</td> <td>$1,500,000</td> <td>2015-2020</td> </tr> <tr> <td>Jasper Ave (Bridge to I-80) Phase Two</td> <td>Grade & Pave Street, Install Curb, Gutter and Sidewalks or Trails</td> <td>$1,000,000</td> <td>2015-2020</td> </tr> <tr> <td>Jasper Ave (Hwy 6 north 2000 ft) Phase Three</td> <td>Grade & Pave Street, Install Curb, Gutter and Sidewalks or Trails</td> <td>$1,000,000</td> <td>2015-2020</td> </tr> <tr> <td>Trail south on Ireland to Villages Development</td> <td>Grade and Pave Trail</td> <td>$200,000</td> <td>2015-2020</td> </tr> <tr> <td>Jasper Ave (Completed portion north to Forevergreen Rd) Phase Four</td> <td>Grade & Pave Street, Install Curb, Gutter and Sidewalks or Trails</td> <td>$1,000,000</td> <td>2020-2025</td> </tr> <tr> <td>Hwy 6 (Ireland to Main St)</td> <td>Grade & Pave Street, Install Curb, Gutter and Sidewalks or Trails</td> <td>$1,000,000</td> <td>2020-2025</td> </tr> <tr> <td>Hwy 6 (Stephans St to Jasper Ave.)</td> <td>Grade & Pave Street, Install Curb, Gutter and Sidewalks or Trails</td> <td>$2,000,000</td> <td>2020-2025</td> </tr> <tr> <td>Hwy 6 (Jasper Ave to I-380)</td> <td>Grade & Pave Street, Install Curb, Gutter and Sidewalks or Trails</td> <td>$1,000,000</td> <td>2020-2025</td> </tr> <tr> <td>Interchange at Forevergreen Rd off I-380</td> <td>Grade & Pave Street, Install Curb, Gutter and Sidewalks or Trails</td> <td>$20,000,000</td> <td>2020-2025</td> </tr> <tr> <td>Forevergreen (Jasper to James Ave)</td> <td>Grade & Pave Street, Install Curb, Gutter and Sidewalks or Trails</td> <td>$1,000,000</td> <td>2025-2030</td> </tr> <tr> <td></td> <td></td> <td>$34,298,000</td> <td></td> </tr> </table>

Sources

  • laserfiche: Resolutions-2011-05 (Resolutions-2011 - 05.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.